April 20, 1999
                                                                                                              !
Mr. J. E. Cross
                                                                                                              l
President
                                                                                                              l
Generation Group
                                                                                                              1
Duquesne Light Company
                                                          April 20, 1999                                     ;
Beaver Valley Power Station
                                                                                                              l
Post Office Box 4
                                                                                                            I
Shippingport, Pennsylvania 15077
    Mr. J. E. Cross                                                                                         !
SUBJECT:
    President
BEAVER VALLF.Y UNIT 2 REACTOR OPERATOR INITIAL EXAMINATION
    Generation Group
REPORT NO. 50-412/99-301
    Duquesne Light Company
Dear Mr. Cross:
    Beaver Valley Power Station
This report transmits the results of the subject operator licensing examinations conducted by the
    Post Office Box 4                                                                                       1
NP.C during the period of March 22-25,1999. These examinations addressed areas important to
    Shippingport, Pennsylvania 15077
public health and safety and were developed and administered using the guidelines of the
    SUBJECT:       BEAVER VALLF.Y UNIT 2 REACTOR OPERATOR INITIAL EXAMINATION
Examination Standards for Power Reactors (NUREG 1021, Interim Revision 8). Based on the
                    REPORT NO. 50-412/99-301
results of the examinations, all three Reactor Operator (RO) applicants passed all portions of the
    Dear Mr. Cross:                                                                                         l
examinations. The findings and performance conclusions, identified during the examinations,
                                                                                                              l
were discussed with your staff via a telephone conference call on April 6,1999.
    This report transmits the results of the subject operator licensing examinations conducted by the
Overall, the quality of the initial exam submittal was acceptable. However, the initial written
    NP.C during the period of March 22-25,1999. These examinations addressed areas important to             I
exam submittal was determined not to meet NRC guidelines in certain instances. For example,
    public health and safety and were developed and administered using the guidelines of the
57 of 100 questions were determined by the NRC examiners to be at the memory cognitive
    Examination Standards for Power Reactors (NUREG 1021, Interim Revision 8). Based on the
lovel. Changes to the written exam were made to: increase the overall o3 gnitive level of the
    results of the examinations, all three Reactor Operator (RO) applicants passed all portions of the
written test; increase question discriminatory validity; enhance question clarity; and to ensure
    examinations. The findings and performance conclusions, identified during the examinations,
l
    were discussed with your staff via a telephone conference call on April 6,1999.
distractors were plausible, but incorrect.
    Overall, the quality of the initial exam submittal was acceptable. However, the initial written
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
    exam submittal was determined not to meet NRC guidelines in certain instances. For example,
j
    57 of 100 questions were determined by the NRC examiners to be at the memory cognitive
enclosures will be placed in the NRC Public Document Room.
    lovel. Changes to the written exam were made to: increase the overall o3 gnitive level of the
No reply to this letter is required, but should you have any question: regarding this examination
    written test; increase question discriminatory validity; enhance question clarity; and to ensure     l
report, please contact me at 610-337-5183, or by E-mail at RJC@NRC. GOV.
    distractors were plausible, but incorrect.
'
    In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its     j
S.incerely,
    enclosures will be placed in the NRC Public Document Room.
- kb
    No reply to this letter is required, but should you have any question: regarding this examination
ORIGINAL SIGNED BY:
    report, please contact me at 610-337-5183, or by E-mail at RJC@NRC. GOV.                         '
9904290048 990420
                                                    S.incerely,
Richard J. Conte, Chief
                                                                                                      - kb
PDR
                                                    ORIGINAL SIGNED BY:
ADOCK 050004 2
                                                    Richard J. Conte, Chief
Human Performance & Emergency
9904290048 990420                                    Human Performance & Emergency
V
PDR  ADOCK 050004 2
2
V                                2                    Preparedness Branch
Preparedness Branch
                                                    Division of Reactor Safety
Division of Reactor Safety
    Docket No. 50-412
Docket No. 50-412


[~
[~
1
1
1
1
J. Cross                                       -2-
J. Cross
-2-
;
l
l
Enclosure:
Initial Examination Report No. 50-412/99-301 w/ Attachment 1
,
,
  Enclosure:      Initial Examination Report No. 50-412/99-301 w/ Attachment 1
1
1
  cc w/ encl; w/ Attachment 1:
cc w/ encl; w/ Attachment 1:
  Robert W. Lindsey, Director-Operations Training
Robert W. Lindsey, Director-Operations Training
  cc w/ encl; w/o Attachment 1:
cc w/ encl; w/o Attachment 1:
  Sushil C. Jain, Senior Vice President, Nuclear Services Group
Sushil C. Jain, Senior Vice President, Nuclear Services Group
l
l
K. Ostrowski, Vice President, Nuclear Operations Group and Plant Manager
'
'
  K. Ostrowski, Vice President, Nuclear Operations Group and Plant Manager
R. Brandt, Vice President, Operations Support Group
  R. Brandt, Vice President, Operations Support Group
B. Tuite, General Manager, Nuclear Operations Unit
  B. Tuite, General Manager, Nuclear Operations Unit
W. Kline, Manager, Nuclear Engineering Department
  W. Kline, Manager, Nuclear Engineering Department
M. Pearson, Manager, Quality Services Unit
  M. Pearson, Manager, Quality Services Unit
M. Ackerman, Manager, Safety & Licensing Department
  M. Ackerman, Manager, Safety & Licensing Department
J. Macdonald, Manager, System and Performance Engineering
  J. Macdonald, Manager, System and Performance Engineering
J. A. Huitz, Manager, Projects and Support Services, FirstEnergy
  J. A. Huitz, Manager, Projects and Support Services, FirstEnergy
M. Clancy, Mayor, Shippingport, PA
  M. Clancy, Mayor, Shippingport, PA
Commonwealth of Pennsylvania
  Commonwealth of Pennsylvania
State of Ohio
  State of Ohio
State of West Virginia
  State of West Virginia
i
                                                                                i


            . J. Cross                                                     -3-
. J. Cross
              Distribution w/ encl: w/ Attachments.j:
-3-
              DRS Master Examination File -
Distribution w/ encl: w/ Attachments.j:
            - PUBLIC
DRS Master Examination File -
              Nuclear Safety information Center (NSIC)
- PUBLIC
              Distribution w/ encl: w/o Attachments 1:
Nuclear Safety information Center (NSIC)
              Region i Docket Room (with concurrences)
Distribution w/ encl: w/o Attachments 1:
              W. Lanning, DRS
Region i Docket Room (with concurrences)
              R. Conte, DRS
W. Lanning, DRS
              L. Briggs, Chief Examiner, DRS '
R. Conte, DRS
              J. Caruso, Chief Examiner Ul, DRS
L. Briggs, Chief Examiner, DRS '
              P. Eselgroth, DRP
J. Caruso, Chief Examiner Ul, DRS
              N. Perry, DRP
P. Eselgroth, DRP
              C. O'Daniell, DRP
N. Perry, DRP
              H. Miller, RA/J. Wiggins, DRA
C. O'Daniell, DRP
              NRC Resident inspector
H. Miller, RA/J. Wiggins, DRA
              DRS OL Facility File
NRC Resident inspector
              DRS File
DRS OL Facility File
              Distribution w/ encl: w/o Attachments 1 (VIA E-MAIL):
DRS File
              M. Tschiltz, OEDO
Distribution w/ encl: w/o Attachments 1 (VIA E-MAIL):
              S. Bajwa, PD1-2, NRR
M. Tschiltz, OEDO
              D. Collins, PDl-2, NRR
S. Bajwa, PD1-2, NRR
              V. Norses, PDI-2, NRR
D. Collins, PDl-2, NRR
              R. Correia, NRR
V. Norses, PDI-2, NRR
              DOCDESK
R. Correia, NRR
              Inspection Program Branch, NRR (IPAS)
DOCDESK
                                                                                                                                                    )
Inspection Program Branch, NRR (IPAS)
                                                                                                                                                    ;
)
                                                                                                                                                    i
i
                                                                                                                                                    l
l
DOCUMENT NAME: G:\HPEPB\ BRIGGS \BV99301.WPD
DOCUMENT NAME: G:\\HPEPB\\ BRIGGS \\BV99301.WPD
Ts recolve a copy of this document, Indicato in the box: "C" * Co)y wMhout attachment /encipsure "E" = Copy wWh attachment / enclosure "N" = No copy I
Ts recolve a copy of this document, Indicato in the box: "C" * Co)y wMhout attachment /encipsure
OFFICE
"E" = Copy wWh attachment / enclosure
NAME
"N" = No copy
                Rl/DRS
I
                JCarusaQ/ ,
OFFICE
                                        l G- 4ti/DRS
Rl/DRS
                                              LBriggsgf[/
l G- 4ti/DRS
                                                            _
Rl/DRS f /l
                                                                ,      Rl/DRS f /l
/?y /p/P P
                                                                        RContpf//V
ld
                                                                                                  /?y /p/P P
_
                                                                                                  fac/r,,/1ffff
[_
                                                                                                                      ld    ''
_
                                                                                                                              _
,
                                                                                                                                              [_
NAME
                                                                                                                      '
JCarusaQ/ ,
DATE          4/8/99 // ~                   04/4 /99                 04/df99                   07//Q/7r
LBriggsgf[/
                                                            OFFICIAL RECORD COPY
RContpf//V
fac/r,,/1ffff
''
DATE
4/8/99 // ~
04/4 /99
04/df99
07//Q/7r
'
OFFICIAL RECORD COPY
}}
}}

Latest revision as of 02:30, 7 December 2024

Forwards Reactor Operator Initial Exam Rept 50-412/99-301 on 990322-25.All Three Reactor Operator Applicants Passed. Initial Written Exam Submittal Was Determined Not to Meet NRC Guidelines in Certain Instances
ML20206A838
Person / Time
Site: Beaver Valley
Issue date: 04/20/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cross J
DUQUESNE LIGHT CO.
Shared Package
ML20206A840 List:
References
50-412-99-301, NUDOCS 9904290048
Download: ML20206A838 (3)


See also: IR 05000412/1999301

Text

l

l

1

April 20, 1999

Mr. J. E. Cross

President

Generation Group

Duquesne Light Company

Beaver Valley Power Station

Post Office Box 4

Shippingport, Pennsylvania 15077

SUBJECT:

BEAVER VALLF.Y UNIT 2 REACTOR OPERATOR INITIAL EXAMINATION

REPORT NO. 50-412/99-301

Dear Mr. Cross:

This report transmits the results of the subject operator licensing examinations conducted by the

NP.C during the period of March 22-25,1999. These examinations addressed areas important to

public health and safety and were developed and administered using the guidelines of the

Examination Standards for Power Reactors (NUREG 1021, Interim Revision 8). Based on the

results of the examinations, all three Reactor Operator (RO) applicants passed all portions of the

examinations. The findings and performance conclusions, identified during the examinations,

were discussed with your staff via a telephone conference call on April 6,1999.

Overall, the quality of the initial exam submittal was acceptable. However, the initial written

exam submittal was determined not to meet NRC guidelines in certain instances. For example,

57 of 100 questions were determined by the NRC examiners to be at the memory cognitive

lovel. Changes to the written exam were made to: increase the overall o3 gnitive level of the

written test; increase question discriminatory validity; enhance question clarity; and to ensure

l

distractors were plausible, but incorrect.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

j

enclosures will be placed in the NRC Public Document Room.

No reply to this letter is required, but should you have any question: regarding this examination

report, please contact me at 610-337-5183, or by E-mail at RJC@NRC. GOV.

'

S.incerely,

- kb

ORIGINAL SIGNED BY:

9904290048 990420

Richard J. Conte, Chief

PDR

ADOCK 050004 2

Human Performance & Emergency

V

2

Preparedness Branch

Division of Reactor Safety

Docket No. 50-412

[~

1

1

J. Cross

-2-

l

Enclosure:

Initial Examination Report No. 50-412/99-301 w/ Attachment 1

,

1

cc w/ encl; w/ Attachment 1:

Robert W. Lindsey, Director-Operations Training

cc w/ encl; w/o Attachment 1:

Sushil C. Jain, Senior Vice President, Nuclear Services Group

l

K. Ostrowski, Vice President, Nuclear Operations Group and Plant Manager

'

R. Brandt, Vice President, Operations Support Group

B. Tuite, General Manager, Nuclear Operations Unit

W. Kline, Manager, Nuclear Engineering Department

M. Pearson, Manager, Quality Services Unit

M. Ackerman, Manager, Safety & Licensing Department

J. Macdonald, Manager, System and Performance Engineering

J. A. Huitz, Manager, Projects and Support Services, FirstEnergy

M. Clancy, Mayor, Shippingport, PA

Commonwealth of Pennsylvania

State of Ohio

State of West Virginia

i

. J. Cross

-3-

Distribution w/ encl: w/ Attachments.j:

DRS Master Examination File -

- PUBLIC

Nuclear Safety information Center (NSIC)

Distribution w/ encl: w/o Attachments 1:

Region i Docket Room (with concurrences)

W. Lanning, DRS

R. Conte, DRS

L. Briggs, Chief Examiner, DRS '

J. Caruso, Chief Examiner Ul, DRS

P. Eselgroth, DRP

N. Perry, DRP

C. O'Daniell, DRP

H. Miller, RA/J. Wiggins, DRA

NRC Resident inspector

DRS OL Facility File

DRS File

Distribution w/ encl: w/o Attachments 1 (VIA E-MAIL):

M. Tschiltz, OEDO

S. Bajwa, PD1-2, NRR

D. Collins, PDl-2, NRR

V. Norses, PDI-2, NRR

R. Correia, NRR

DOCDESK

Inspection Program Branch, NRR (IPAS)

)

i

l

DOCUMENT NAME: G:\\HPEPB\\ BRIGGS \\BV99301.WPD

Ts recolve a copy of this document, Indicato in the box: "C" * Co)y wMhout attachment /encipsure

"E" = Copy wWh attachment / enclosure

"N" = No copy

I

OFFICE

Rl/DRS

l G- 4ti/DRS

Rl/DRS f /l

/?y /p/P P

ld

_

[_

_

,

NAME

JCarusaQ/ ,

LBriggsgf[/

RContpf//V

fac/r,,/1ffff

DATE

4/8/99 // ~

04/4 /99

04/df99

07//Q/7r

'

OFFICIAL RECORD COPY