ML20206M809: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:7 I
{{#Wiki_filter:I
                                                                                                                      }
}
W                                                                                                                     i May 10, 1999 Mr. R. P. Necci, Vice President .
7 W
i May 10, 1999 Mr. R. P. Necci, Vice President.
Nuclear Oversight and Regulatory Affairs.-
Nuclear Oversight and Regulatory Affairs.-
c/o Mr. D. A. Smith, Manager Regulatory Affairs Northeast Nuclear Energy Company..
c/o Mr. D. A. Smith, Manager Regulatory Affairs Northeast Nuclear Energy Company..
P. O. Box 128'
P. O. Box 128'
              .Waterford, CT 06385
.Waterford, CT 06385


==SUBJECT:==
==SUBJECT:==
Line 30: Line 31:


==Dear Mr. Necci:==
==Dear Mr. Necci:==
 
. This letter provides the final and last revision to the NRC's' Millstone Restart Assessment Plan, performed in accordance with NRC Manual Chapter (MC) 0350, " Staff Guidelines for Restart Approval." Revision 5, sent to you in a {{letter dated|date=September 4, 1998|text=letter dated September 4,1998}}, closed out the restart assessment process for Units 1 and 3. This 7* revision and the previous revision apply only to Unit 2. The Unit 2 Significant items List (Enclosure 1), the MC 0350 Restart Approval Checklist (Enclosure 2), and the Licensing issues Required for Restart (Enclosure 3) have been updated and closed, since Unit 2 has received restart approval from the NRC as explained in our {{letter dated|date=April 29, 1999|text=letter dated April 29,1999}}.
              . This letter provides the final and last revision to the NRC's' Millstone Restart Assessment Plan, performed in accordance with NRC Manual Chapter (MC) 0350, " Staff Guidelines for Restart Approval." Revision 5, sent to you in a {{letter dated|date=September 4, 1998|text=letter dated September 4,1998}}, closed out the restart assessment process for Units 1 and 3. This 7* revision and the previous revision apply only to Unit 2. The Unit 2 Significant items List (Enclosure 1), the MC 0350 Restart Approval Checklist (Enclosure 2), and the Licensing issues Required for Restart (Enclosure 3) have been updated and closed, since Unit 2 has received restart approval from the NRC as explained in our {{letter dated|date=April 29, 1999|text=letter dated April 29,1999}}.
If you have any questions regarding this document, please contact Mr. James Linville at 610-337-5129.
If you have any questions regarding this document, please contact Mr. James Linville at 610-337-5129.
i Sincerely,                                             l I
i Sincerely, l
ORIGINAL SIGNED BY:                                       !
I ORIGINAL SIGNED BY:
Wayne D. Lanning, Director Millstone Inspection Directorate Region 1                                                 j i
Wayne D. Lanning, Director Millstone Inspection Directorate Region 1 j
Docket No. 50-336
i Docket No. 50-336


==Enclosures:==
==Enclosures:==
As stated l
As stated l
                                                                                                                      .l p       1 9905'170057 990510                   '
.l p
I  -
1 I
PDR   ADOCK 05000245             :
9905'170057 990510 PDR ADOCK 05000245 P
P                      PDR       .J                                                   .) }
PDR
                                                                                            .r
.J
...N-   ._dx             .m . u_   m                             m
.) }
.r
...N-
._dx
.m u_
m m


m     - =
m
- =
q R
q R
e
e
    . Mr. R. P. Necci ..                           ~2 cc 'w/encls:                                                     ,
. Mr. R. P. Necci..
~ 2 cc 'w/encls:
: 8. D. Kenyon, President Generation Group.
: 8. D. Kenyon, President Generation Group.
L. J. Olivier, Senior Vice President & Chief Nuclear Officer         l-M. H. Brothers, Vice President - Operations F. C. Rothen, Vice President - Nuclear Work Services                     i D. Amerine, Vice President - Engineering Services                       l J.-T Carlin, Vice President - Human Services G. D. Hicks, Director - Nuclear Training Services (CT)
L. J. Olivier, Senior Vice President & Chief Nuclear Officer l-M. H. Brothers, Vice President - Operations F. C. Rothen, Vice President - Nuclear Work Services D. Amerine, Vice President - Engineering Services l
C. J. Schwarz, Director . Unit 3. Operations -
J.-T Carlin, Vice President - Human Services G. D. Hicks, Director - Nuclear Training Services (CT)
J. A. Price, Director - Unit 2 Operations
C. J. Schwarz, Director. Unit 3. Operations -
                              ~
J. A. Price, Director - Unit 2 Operations E. J. Harkness, Director - Unit 1 Operations
E. J. Harkness, Director - Unit 1 Operations L. M.' Cuoco, Senior Nuclear Counsel J. R. Egan,' Esquire N. Burton, Esquire
~
  . V. ~Juliano, Waterford Library J. Buckingham, Department of Public Utility Control
L. M.' Cuoco, Senior Nuclear Counsel J. R. Egan,' Esquire N. Burton, Esquire
  -lS. B. Comley, We The People
. V. ~Juliano, Waterford Library J. Buckingham, Department of Public Utility Control
    . State of Connecticut SLO Designee First Selectmen, Town of Waterford D. Katz, Citizens Awareness Network (CAN)
-lS. B. Comley, We The People
. State of Connecticut SLO Designee First Selectmen, Town of Waterford D. Katz, Citizens Awareness Network (CAN)
T. Concannon, Co-Chair for NEAC R.' Bassilakis, CAN J. M. Block, Attorney, CAN S. P. Luxton, Citizens Regulatory Commission (CRC)
T. Concannon, Co-Chair for NEAC R.' Bassilakis, CAN J. M. Block, Attorney, CAN S. P. Luxton, Citizens Regulatory Commission (CRC)
E. Woollacott, Co-Chairman, NEAC s
E. Woollacott, Co-Chairman, NEAC s
                  )
)


e Mr. R. P. Nec,ci                                                     3 Distribution w/encis:
e Mr. R. P. Nec,ci 3
Distribution w/encis:
Region i Docket Room (with rapy of concurrences)
Region i Docket Room (with rapy of concurrences)
Nuclear Safety Information Center (NSIC),
Nuclear Safety Information Center (NSIC),
PUBLIC FILE CENTER, NRR (with Oriainal concurrences)
PUBLIC FILE CENTER, NRR (with Oriainal concurrences)
Millstone inspection Directorate Secretarial File, Region 1 -
Millstone inspection Directorate Secretarial File, Region 1 -
NRC Resident inspector                                                                                                                       i H. Miller, Regional Administrator, RI J. Wiggins, Deputy Regional Administrator, Rl W. Lanning, DRS B. Davis, PIMB/ DISP J. Linville, Millstone inspection Directorate, RI D. Screnci, PAO DRS File Distribution w/enci <VIA E-MAIL >:
NRC Resident inspector i
R. Eaton, PM, NRR T. Madden, OCA R. Correia, NRR M. Tschilitz, OEDO J. Nakoski, PM, NRR W. Dean, Chief, inspection Programs Branch, NRR                                                                                               j E. Imbro, Chief, Mechanical & Civil Engineering Branch, NRR                                                                                 .j P. Koltay, Chief, ICAVP Oversight, SPO, NRR                                                                                                 .q Inspection Program Branch <lPAS>                                                                                                             '
H. Miller, Regional Administrator, RI J. Wiggins, Deputy Regional Administrator, Rl W. Lanning, DRS B. Davis, PIMB/ DISP J. Linville, Millstone inspection Directorate, RI D. Screnci, PAO DRS File Distribution w/enci <VIA E-MAIL >:
                                                                                                                                                                )
R. Eaton, PM, NRR T. Madden, OCA R. Correia, NRR M. Tschilitz, OEDO J. Nakoski, PM, NRR W. Dean, Chief, inspection Programs Branch, NRR j
E. Imbro, Chief, Mechanical & Civil Engineering Branch, NRR
.j P. Koltay, Chief, ICAVP Oversight, SPO, NRR
.q Inspection Program Branch <lPAS>
)'
DOCDESK (Inspection Reports ONLY) 4 1
DOCDESK (Inspection Reports ONLY) 4 1
                                                                                                                                                              .i i
.i i
                                                                                                                                                            ~l DOCUMENT NAME: G:\ BRANCH 6\MS2 RAP 7 .WPD                                                                                                                     I T = ,eceive a copy of this document, Indicate in the boat "C' = Copy hout attachment / enclosure *E' = Copy with attachment / enclosure 'N' .= No copy OFFICE         Rl/MID                   l       Rl/MID ,og. l               Rl/Dijji               l     HQ/NRR             .
~l DOCUMENT NAME: G:\\ BRANCH 6\\MS2 RAP 7.WPD T =,eceive a copy of this document, Indicate in the boat "C' = Copy hout attachment / enclosure
l      HQ/NRR     s/
*E' = Copy with attachment / enclosure
NAME           RUrban %                       JLinville YI'                 M 6g                         Elmbro1f8'f b EAdensam QW                       )
'N'.= No copy OFFICE Rl/MID l
DATE           5/f/99                           5/ 6/99 "                   5/A /99                       5/s /99 bM 5/ JD/99 ' hfM ot OFFICIAL RECORD COPY                                                                 f[
Rl/MID,og. l Rl/Dijji l
1
HQ/NRR l
                                                                                                                                                            .j}}
HQ/NRR s/
NAME RUrban %
JLinville YI' M
6g Elmbro1f8'f b EAdensam QW
)
DATE 5/f/99 5/ 6/99 "
5/A /99 5/s /99 bM 5/ JD/99 ' hfM ot OFFICIAL RECORD COPY f[
.j}}

Latest revision as of 00:22, 7 December 2024

Provides Final & Last Rev to NRC Millstone Restart Assessment Plan,Performed Per NRC Manual Chapter (Mc) 0350, Staff Guidelines for Restart Approval,Rev 5 Sent in Ltr
ML20206M809
Person / Time
Site: Millstone  
Issue date: 05/10/1999
From: Lanning W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Necci R
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20206M814 List:
References
NUDOCS 9905170057
Download: ML20206M809 (3)


Text

I

}

7 W

i May 10, 1999 Mr. R. P. Necci, Vice President.

Nuclear Oversight and Regulatory Affairs.-

c/o Mr. D. A. Smith, Manager Regulatory Affairs Northeast Nuclear Energy Company..

P. O. Box 128'

.Waterford, CT 06385

SUBJECT:

RESTART ASSESSMENT PLAN, REVISION 7

Dear Mr. Necci:

. This letter provides the final and last revision to the NRC's' Millstone Restart Assessment Plan, performed in accordance with NRC Manual Chapter (MC) 0350, " Staff Guidelines for Restart Approval." Revision 5, sent to you in a letter dated September 4,1998, closed out the restart assessment process for Units 1 and 3. This 7* revision and the previous revision apply only to Unit 2. The Unit 2 Significant items List (Enclosure 1), the MC 0350 Restart Approval Checklist (Enclosure 2), and the Licensing issues Required for Restart (Enclosure 3) have been updated and closed, since Unit 2 has received restart approval from the NRC as explained in our letter dated April 29,1999.

If you have any questions regarding this document, please contact Mr. James Linville at 610-337-5129.

i Sincerely, l

I ORIGINAL SIGNED BY:

Wayne D. Lanning, Director Millstone Inspection Directorate Region 1 j

i Docket No. 50-336

Enclosures:

As stated l

.l p

1 I

9905'170057 990510 PDR ADOCK 05000245 P

PDR

.J

.) }

.r

...N-

._dx

.m u_

m m

m

- =

q R

e

. Mr. R. P. Necci..

~ 2 cc 'w/encls:

8. D. Kenyon, President Generation Group.

L. J. Olivier, Senior Vice President & Chief Nuclear Officer l-M. H. Brothers, Vice President - Operations F. C. Rothen, Vice President - Nuclear Work Services D. Amerine, Vice President - Engineering Services l

J.-T Carlin, Vice President - Human Services G. D. Hicks, Director - Nuclear Training Services (CT)

C. J. Schwarz, Director. Unit 3. Operations -

J. A. Price, Director - Unit 2 Operations E. J. Harkness, Director - Unit 1 Operations

~

L. M.' Cuoco, Senior Nuclear Counsel J. R. Egan,' Esquire N. Burton, Esquire

. V. ~Juliano, Waterford Library J. Buckingham, Department of Public Utility Control

-lS. B. Comley, We The People

. State of Connecticut SLO Designee First Selectmen, Town of Waterford D. Katz, Citizens Awareness Network (CAN)

T. Concannon, Co-Chair for NEAC R.' Bassilakis, CAN J. M. Block, Attorney, CAN S. P. Luxton, Citizens Regulatory Commission (CRC)

E. Woollacott, Co-Chairman, NEAC s

)

e Mr. R. P. Nec,ci 3

Distribution w/encis:

Region i Docket Room (with rapy of concurrences)

Nuclear Safety Information Center (NSIC),

PUBLIC FILE CENTER, NRR (with Oriainal concurrences)

Millstone inspection Directorate Secretarial File, Region 1 -

NRC Resident inspector i

H. Miller, Regional Administrator, RI J. Wiggins, Deputy Regional Administrator, Rl W. Lanning, DRS B. Davis, PIMB/ DISP J. Linville, Millstone inspection Directorate, RI D. Screnci, PAO DRS File Distribution w/enci <VIA E-MAIL >:

R. Eaton, PM, NRR T. Madden, OCA R. Correia, NRR M. Tschilitz, OEDO J. Nakoski, PM, NRR W. Dean, Chief, inspection Programs Branch, NRR j

E. Imbro, Chief, Mechanical & Civil Engineering Branch, NRR

.j P. Koltay, Chief, ICAVP Oversight, SPO, NRR

.q Inspection Program Branch <lPAS>

)'

DOCDESK (Inspection Reports ONLY) 4 1

.i i

~l DOCUMENT NAME: G:\\ BRANCH 6\\MS2 RAP 7.WPD T =,eceive a copy of this document, Indicate in the boat "C' = Copy hout attachment / enclosure

  • E' = Copy with attachment / enclosure

'N'.= No copy OFFICE Rl/MID l

Rl/MID,og. l Rl/Dijji l

HQ/NRR l

HQ/NRR s/

NAME RUrban %

JLinville YI' M

6g Elmbro1f8'f b EAdensam QW

)

DATE 5/f/99 5/ 6/99 "

5/A /99 5/s /99 bM 5/ JD/99 ' hfM ot OFFICIAL RECORD COPY f[

.j