i May 10, 1999 Mr. R. P. Necci, Vice President.
Nuclear Oversight and Regulatory Affairs.-
c/o Mr. D. A. Smith, Manager Regulatory Affairs Northeast Nuclear Energy Company..
P. O. Box 128'
.Waterford, CT 06385
SUBJECT:
RESTART ASSESSMENT PLAN, REVISION 7
Dear Mr. Necci:
. This letter provides the final and last revision to the NRC's' Millstone Restart Assessment Plan, performed in accordance with NRC Manual Chapter (MC) 0350, " Staff Guidelines for Restart Approval." Revision 5, sent to you in a letter dated September 4,1998, closed out the restart assessment process for Units 1 and 3. This 7* revision and the previous revision apply only to Unit 2. The Unit 2 Significant items List (Enclosure 1), the MC 0350 Restart Approval Checklist (Enclosure 2), and the Licensing issues Required for Restart (Enclosure 3) have been updated and closed, since Unit 2 has received restart approval from the NRC as explained in our letter dated April 29,1999.
If you have any questions regarding this document, please contact Mr. James Linville at 610-337-5129.
i Sincerely, l
I ORIGINAL SIGNED BY:
Wayne D. Lanning, Director Millstone Inspection Directorate Region 1 j
i Docket No. 50-336
Enclosures:
As stated l
.l p
1 I
9905'170057 990510 PDR ADOCK 05000245 P
.J
.) }
.r
...N-
._dx
.m u_
m m
m
- =
q R
e
. Mr. R. P. Necci..
~ 2 cc 'w/encls:
- 8. D. Kenyon, President Generation Group.
L. J. Olivier, Senior Vice President & Chief Nuclear Officer l-M. H. Brothers, Vice President - Operations F. C. Rothen, Vice President - Nuclear Work Services D. Amerine, Vice President - Engineering Services l
J.-T Carlin, Vice President - Human Services G. D. Hicks, Director - Nuclear Training Services (CT)
C. J. Schwarz, Director. Unit 3. Operations -
J. A. Price, Director - Unit 2 Operations E. J. Harkness, Director - Unit 1 Operations
~
L. M.' Cuoco, Senior Nuclear Counsel J. R. Egan,' Esquire N. Burton, Esquire
. V. ~Juliano, Waterford Library J. Buckingham, Department of Public Utility Control
-lS. B. Comley, We The People
. State of Connecticut SLO Designee First Selectmen, Town of Waterford D. Katz, Citizens Awareness Network (CAN)
T. Concannon, Co-Chair for NEAC R.' Bassilakis, CAN J. M. Block, Attorney, CAN S. P. Luxton, Citizens Regulatory Commission (CRC)
E. Woollacott, Co-Chairman, NEAC s
)
e Mr. R. P. Nec,ci 3
Distribution w/encis:
Region i Docket Room (with rapy of concurrences)
Nuclear Safety Information Center (NSIC),
PUBLIC FILE CENTER, NRR (with Oriainal concurrences)
Millstone inspection Directorate Secretarial File, Region 1 -
NRC Resident inspector i
H. Miller, Regional Administrator, RI J. Wiggins, Deputy Regional Administrator, Rl W. Lanning, DRS B. Davis, PIMB/ DISP J. Linville, Millstone inspection Directorate, RI D. Screnci, PAO DRS File Distribution w/enci <VIA E-MAIL >:
R. Eaton, PM, NRR T. Madden, OCA R. Correia, NRR M. Tschilitz, OEDO J. Nakoski, PM, NRR W. Dean, Chief, inspection Programs Branch, NRR j
E. Imbro, Chief, Mechanical & Civil Engineering Branch, NRR
.j P. Koltay, Chief, ICAVP Oversight, SPO, NRR
.q Inspection Program Branch <lPAS>
)'
DOCDESK (Inspection Reports ONLY) 4 1
.i i
~l DOCUMENT NAME: G:\\ BRANCH 6\\MS2 RAP 7.WPD T =,eceive a copy of this document, Indicate in the boat "C' = Copy hout attachment / enclosure
- E' = Copy with attachment / enclosure
'N'.= No copy OFFICE Rl/MID l
Rl/MID,og. l Rl/Dijji l
HQ/NRR l
HQ/NRR s/
NAME RUrban %
JLinville YI' M
6g Elmbro1f8'f b EAdensam QW
)
DATE 5/f/99 5/ 6/99 "
5/A /99 5/s /99 bM 5/ JD/99 ' hfM ot OFFICIAL RECORD COPY f[
.j