TXX-4873, Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions.Initially Reported on 860527.Next Rept Will Be Submitted by 860721: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Log # TXX-4873 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER . 400 NORTH OLIVE WTREET L.B. 51. DALLAS. TEXAS 75301 June 26, 1986 WILLIAM G. COUNSIL EEECUTivE VICE PREStOENT Mr. Eric H. Johnson, Director                                                                                     i Division of Reactor Safety and Projects                                                                           l U. S. Nuclear Regulatory Commission                                                       a I
{{#Wiki_filter:Log # TXX-4873 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OLIVE WTREET L.B. 51. DALLAS. TEXAS 75301 June 26, 1986 WILLIAM G. COUNSIL EEECUTivE VICE PREStOENT Mr. Eric H. Johnson, Director i
611 Ryan P1aza Drive, Suite 1000                                       3 fp r ~h,''790qh!    t
Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 3 fp r ~h,''790qh!
;              Arlington, TX 76012                                                     .
a I
                                                                                        ,j j
611 Ryan P1aza Drive, Suite 1000 t
Arlington, TX 76012
.,j j


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)                         i             E DOCKET NOS. 50-445 AND 50-446                                   l                           y TRACEABILITY OF 1E PIGTAIL EXTENSIONS                                                     ',.s.
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) i E
DOCKET NOS. 50-445 AND 50-446 l
y TRACEABILITY OF 1E PIGTAIL EXTENSIONS
',.s.
SDAR: CP-86-38 (INTERIM REPORT)
SDAR: CP-86-38 (INTERIM REPORT)


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
 
On May 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involvirig the failure of project procedures to adequately address the installation and inspection criteria for cable runs used as device pigtail extensions. This is an interim report of a potentially reportable item under j
On May 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involvirig the failure of project procedures to adequately address the                                           l installation and inspection criteria for cable runs used as device pigtail extensions. This is an interim report of a potentially reportable item under                                       j the provision of 10CFR50.55(e).
the provision of 10CFR50.55(e).
CPSES Engineering is currently conducting an analysis of this issue to evaluate the impact of the ?ack of traceability of pigtail extensions by cable number.                                     <
CPSES Engineering is currently conducting an analysis of this issue to evaluate the impact of the ?ack of traceability of pigtail extensions by cable number.
We are continuing our evaluation and anticipate submitting our next report by July 21,1986.
We are continuing our evaluation and anticipate submitting our next report by July 21,1986.
Very truly yours, 7t4 $
Very truly yours, 7t4 $
1                                                                               W. G. Co gil ,
1 W. G. Co gil,
1                                                                                                     r       i
1 r
!                                                                                By:           ,    .
i By:
G. S. Keeley Manager, Nucle             icensing i               JCH/arh l
G. S. Keeley Manager, Nucle icensing i
JCH/arh l
c - NRC Region IV (0 + 1 Copy)
c - NRC Region IV (0 + 1 Copy)
Director, Inspection & Enforcement (15 copies) l                     U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Director, Inspection & Enforcement (15 copies) l U. S. Nuclear Regulatory Commission Washington, D.C.
                                      $7 S
20555
inn BEEh'       e 76~
$7 inn BEEh' e
  %v- 69 \                               ,-v,,,o.,orr-       or- -         cnuc-,-                                         g(o
S 76~
                                                                        -                      .              . .-          .}}
%v-69 \\
g(o
,-v,,,o.,orr-or- -
cnuc-,-
.}}

Latest revision as of 01:06, 7 December 2024

Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions.Initially Reported on 860527.Next Rept Will Be Submitted by 860721
ML20206N909
Person / Time
Site: Comanche Peak  
Issue date: 06/26/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-38, TXX-4873, NUDOCS 8607010538
Download: ML20206N909 (1)


Text

Log # TXX-4873 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OLIVE WTREET L.B. 51. DALLAS. TEXAS 75301 June 26, 1986 WILLIAM G. COUNSIL EEECUTivE VICE PREStOENT Mr. Eric H. Johnson, Director i

Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 3 fp r ~h,790qh!

a I

611 Ryan P1aza Drive, Suite 1000 t

Arlington, TX 76012

.,j j

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) i E

DOCKET NOS. 50-445 AND 50-446 l

y TRACEABILITY OF 1E PIGTAIL EXTENSIONS

',.s.

SDAR: CP-86-38 (INTERIM REPORT)

Dear Mr. Johnson:

On May 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involvirig the failure of project procedures to adequately address the installation and inspection criteria for cable runs used as device pigtail extensions. This is an interim report of a potentially reportable item under j

the provision of 10CFR50.55(e).

CPSES Engineering is currently conducting an analysis of this issue to evaluate the impact of the ?ack of traceability of pigtail extensions by cable number.

We are continuing our evaluation and anticipate submitting our next report by July 21,1986.

Very truly yours, 7t4 $

1 W. G. Co gil,

1 r

i By:

G. S. Keeley Manager, Nucle icensing i

JCH/arh l

c - NRC Region IV (0 + 1 Copy)

Director, Inspection & Enforcement (15 copies) l U. S. Nuclear Regulatory Commission Washington, D.C.

20555

$7 inn BEEh' e

S 76~

%v-69 \\

g(o

,-v,,,o.,orr-or- -

cnuc-,-

.