3F1298-19, Withdraws Requesting Exemption from Requirements of 10CFR70.24(a), Criticality Accident Requirements: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:.                                -_                    -          -          ..
{{#Wiki_filter:.
j.*
j.*
Fl rida                                                                                                 '
Fl rida 8* L"A"^JS" Power N kUYcse No. DPR-72 December 28,1998 3F1298-19 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 4 001
Power 8* L"A"^JS"     N kUYcse No. DPR-72
.      December 28,1998 3F1298-19 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 4 001


==Subject:==
==Subject:==
Line 29: Line 27:


==Reference:==
==Reference:==
FPC to NRC letter 3F0597-14, dated May 21,1997, Request for Exemption from 10 CFR 70.24(a), " Criticality Accident Requirements" i
FPC to NRC letter 3F0597-14, dated May 21,1997, Request for Exemption from 10 CFR 70.24(a), " Criticality Accident Requirements"


==Dear Sir:==
==Dear Sir:==
In the referenced letter, Florida Power Corporation (FPC) submitted a request for exemption from the requirements of 10 CFR 70.24(a) for Crystal River Unit 3 (CR-3). The purpose of                               j this letter is to withdraw that request for exemption from NRC Staff review.
In the referenced letter, Florida Power Corporation (FPC) submitted a request for exemption from the requirements of 10 CFR 70.24(a) for Crystal River Unit 3 (CR-3). The purpose of j
                                                                                                                              ]
this letter is to withdraw that request for exemption from NRC Staff review.
]
If you have any questions regarding this letter please contact Mr. Sid Powell, Manager, Nuclear Licensing at (352) 5634883.
If you have any questions regarding this letter please contact Mr. Sid Powell, Manager, Nuclear Licensing at (352) 5634883.
Sincerely,
Sincerely,
                                                                                                                              \
\\
sL&nh                                                                                                           lb Sherry L. Ber       ft Director Nuclear Regulatory Affairs SLB/rer                                                                                                    6j d) f xc:     Regional Administrator, Region II
sL&nh lb Sherry L. Ber ft Director Nuclear Regulatory Affairs 6j d) f SLB/rer xc:
              . Senior Resident Inspector         _      'O5b NRR Project Manager             s_. v ''
Regional Administrator, Region II b
9901110013 991228             ;7 PDR     ADOCK 05000302 P                     PDR     ,
. Senior Resident Inspector
CRYSTAL RIVER ENERGY COMPLEX: 15760 W. Power Line Street
'O5 NRR Project Manager s_. v ''
9901110013 991228
;7 PDR ADOCK 05000302 P
PDR CRYSTAL RIVER ENERGY COMPLEX: 15760 W. Power Line Street
* Crystal River, Florida 34428-6708 * (352)795-6486 A Florida Progress Company}}
* Crystal River, Florida 34428-6708 * (352)795-6486 A Florida Progress Company}}

Latest revision as of 00:03, 7 December 2024

Withdraws Requesting Exemption from Requirements of 10CFR70.24(a), Criticality Accident Requirements
ML20206P211
Person / Time
Site: Crystal River 
Issue date: 12/28/1998
From: Bernhoft S
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F1298-19, NUDOCS 9901110013
Download: ML20206P211 (1)


Text

.

j.*

Fl rida 8* L"A"^JS" Power N kUYcse No. DPR-72 December 28,1998 3F1298-19 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 4 001

Subject:

Crystal River Unit 3, Withdrawal of 10 CFR 70.24(a) Exemption Request

Reference:

FPC to NRC letter 3F0597-14, dated May 21,1997, Request for Exemption from 10 CFR 70.24(a), " Criticality Accident Requirements"

Dear Sir:

In the referenced letter, Florida Power Corporation (FPC) submitted a request for exemption from the requirements of 10 CFR 70.24(a) for Crystal River Unit 3 (CR-3). The purpose of j

this letter is to withdraw that request for exemption from NRC Staff review.

]

If you have any questions regarding this letter please contact Mr. Sid Powell, Manager, Nuclear Licensing at (352) 5634883.

Sincerely,

\\

sL&nh lb Sherry L. Ber ft Director Nuclear Regulatory Affairs 6j d) f SLB/rer xc:

Regional Administrator, Region II b

. Senior Resident Inspector

'O5 NRR Project Manager s_. v

9901110013 991228

7 PDR ADOCK 05000302 P

PDR CRYSTAL RIVER ENERGY COMPLEX: 15760 W. Power Line Street

  • Crystal River, Florida 34428-6708 * (352)795-6486 A Florida Progress Company