TXX-5008, Interim Deficiency Rept CP-86-22 Re Adequacy of Safeguards Area Fan Coolers.Initially Reported on 860402.Ebasco Review of HVAC Design Will Include Resolution of Issue & Reportability Per 10CFR50.55(e).Next Rept by 861212: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Log # TXX-5008 File # 10110 909.4 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER . 400 NORTH GIJVE EFFREET, t.B. 81 = DAIJ.AS, TEXA8 78201 September 12, 1986 | {{#Wiki_filter:Log # TXX-5008 File # 10110 909.4 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH GIJVE EFFREET, t.B. 81 = DAIJ.AS, TEXA8 78201 September 12, 1986 | ||
. = = . = , | . = =. =, | ||
Mr. Eric H. Johnson, Director | *M@ R AV/34 l | ||
U. S. Nuclear Regulatory Commission | Mr. Eric H. Johnson, Director l | ||
Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission SEP I 21986 yi 611 Ryan Plaza Drive, Suite 1000 1 | |||
Arlington, TX 76012 J | |||
l i | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 25: | Line 28: | ||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On April 2,1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the capacity of.the present fan cooler design in the Safeguards area to adequately handle the heat load in several rooms. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted interim reports logged TXX-4780 and TXX-4894, dated April 30, 1986, and July 3,1986, respectively. | On April 2,1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the capacity of.the present fan cooler design in the Safeguards area to adequately handle the heat load in several rooms. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted interim reports logged TXX-4780 and TXX-4894, dated April 30, 1986, and July 3,1986, respectively. | ||
Since our last report, we have initiated a major review of the HVAC design by EBASCO. This design review will include resolution of this specific issue and a determination of reportability pursuant to 10CFR50.55(e). | Since our last report, we have initiated a major review of the HVAC design by EBASCO. This design review will include resolution of this specific issue and a determination of reportability pursuant to 10CFR50.55(e). | ||
We anticipate submitting our next report by December 12, 1986. | We anticipate submitting our next report by December 12, 1986. | ||
Very truly yours, | Very truly yours, | ||
#7k26 W. G. Counsil JCH/amb c - NRC Region IV (0 + 1 copy) | |||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U.S. Nuclear Regulatory Commission Washington, D.C. 20555 8609230036 860912 PDR | U.S. Nuclear Regulatory Commission Washington, D.C. | ||
20555 8609230036 860912 PDR ADOCK 05000445 S | |||
PDR I | |||
a snvssion or rexas ursurzes etecrnuc cx>uraxr l0 | |||
~ | |||
.}} | |||
Latest revision as of 00:26, 7 December 2024
| ML20206S942 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/12/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-22, TXX-5008, NUDOCS 8609230036 | |
| Download: ML20206S942 (1) | |
Text
Log # TXX-5008 File # 10110 909.4 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH GIJVE EFFREET, t.B. 81 = DAIJ.AS, TEXA8 78201 September 12, 1986
. = =. =,
- M@ R AV/34 l
Mr. Eric H. Johnson, Director l
Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission SEP I 21986 yi 611 Ryan Plaza Drive, Suite 1000 1
Arlington, TX 76012 J
l i
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 SAFEGUARDS AREA FAN COOLERS SDAR: CP-86-22 (INTERIM REPORT)
Dear Mr. Johnson:
On April 2,1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the capacity of.the present fan cooler design in the Safeguards area to adequately handle the heat load in several rooms. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted interim reports logged TXX-4780 and TXX-4894, dated April 30, 1986, and July 3,1986, respectively.
Since our last report, we have initiated a major review of the HVAC design by EBASCO. This design review will include resolution of this specific issue and a determination of reportability pursuant to 10CFR50.55(e).
We anticipate submitting our next report by December 12, 1986.
Very truly yours,
- 7k26 W. G. Counsil JCH/amb c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 8609230036 860912 PDR ADOCK 05000445 S
PDR I
a snvssion or rexas ursurzes etecrnuc cx>uraxr l0
~
.