NRC MONTHLY OPERATING REPORT DOCKET NO.                                   1Q-32@
NRC MONTHLY OPERATING REPORT DOCKET NO.
UNIT NAME                                     _P V _N G S _- 1_ __ -
1Q-32@
DATE                                         _0 _9 _/----0 8 / 8 _6 COMPLETED BY                                 J2N._golv111e TELEPHONE                                     _692-932--5390
UNIT NAME
                                                                                                                                                                              ~           ~
_P V _N G S _- 1_ __ -
l OPEltATJNG STATUS
DATE
: 1.           Unit Name: Pglo Vggde Ngclear_Genergting_Eggtient_Qnth_1
_0 _9 _/ 0 8 / 8 _6 COMPLETED BY J2N._golv111e TELEPHONE
: 2.           Reporting Period: A_u_ gust _1986
_692-932--5390 l
: 3.           Licensed Thermal Power (MWt): 3800                                                 ~-
OPEltATJNG STATUS
: 4.           Nameplate Rating (Gross MWe): [14O[3
~
: 5.           Design Electrical Rating (Not MWe):                                                                           1231
~
: 6.           Maximum Dependable Capacity (Gross MWe): 1_303
1.
: 7.           Maximus Dependable Capacity (Not NWe):                                                                         1221
Unit Name: Pglo Vggde Ngclear_Genergting_Eggtient_Qnth_1 2.
: 8.           If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Reporting Period:
Since Last Report, Give Reasons:                                                       ___                                _
A_u_ gust _1986 3.
                                  -----                ==         - - - _ - - - - .                  _-------                      - - .                  -------------------
Licensed Thermal Power (MWt): 3800
: 9.           Power Level to Which Restricted, If Any (Not MWe): _NQNE-                                                                                                               ______
~-
: 10.         Reasons For Restrictions, If Any:                                                         ___ _ _ _                __ _                            _ _ _ _ _ _              ___ _ _ _ _ _
4.
                            .--- -                  ---              _=---                             --                =             ____--_-------------------
Nameplate Rating (Gross MWe): [14O[3 5.
      ,                                                                                                This Month                           Yr.-to-Date                               Cumulative
Design Electrical Rating (Not MWe):
: 11.         Houre in Reporting Period                                               __          744___                   ___4800                                   ___4800___
1231 6.
: 12.         Number of Hours Reactor Was Critical                           .
Maximum Dependable Capacity (Gross MWe): 1_303 7.
____518.2_                                       2476.4             _          _          247@.2_
Maximus Dependable Capacity (Not NWe):
: 13.          Reactor Reserve Shutdown                                                                                                                             ,
1221 8.
Houra                                                                   _____O                               __              O_____                   _____g____
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
j               14.         Hours Generator On-Line                                                 ____494.5_                           ___2409._3__                               _          24Q9 3,
Since Last Report, Give Reasons:
: 15.         Unit Reserve Shutdown Houra                                                                   ----------
 
O                       ----- _
==
O             -
9.
O
Power Level to Which Restricted, If Any (Not MWe): _NQNE-10.
: 16.         Gross Thermal Energy Generatad (HWH)                                                         1_ t74Qt@82_                         _8 g 644,_305_                             _8_g_44   6 t 395 m       17.         Gross Electrical Energy                                                                                                                                                                           '
Reasons For Restrictions, If Any:
i Q@                   Generated (MWH)                                                         __59_3, M _                           _2t 9_Z6             t M _                 _ 2 t9_ 7_6_ t3go                       j l gga           18.         Net Electrical Energy
_=---
; '00                         Generated (MWH)                                                         __548,_O9_7_                         _2,736 t8_54_                            _2t736 t854                              l
=
This Month Yr.-to-Date Cumulative 11.
Houre in Reporting Period 744___
___4800
___4800___
12.
Number of Hours Reactor Was Critical
____518.2_
2476.4 13.
Reactor Reserve Shutdown 247@.2_
Houra
_____O O_____
_____g____
j 14.
Hours Generator On-Line
____494.5_
___2409._3__
24Q9 3, 15.
Unit Reserve Shutdown Houra O
O O
16.
Gross Thermal Energy Generatad (HWH) 1_ t74Qt@82_
_8 644,_305_
6
_8_g_44 395 g
t m
17.
Gross Electrical Energy i
Q@
Generated (MWH)
__59_3, M _
_2 9_Z6 M _
_ 2 9_ 7_6_ t3go j
t t
t l gga 18.
Net Electrical Energy
; '00 Generated (MWH)
__548,_O9_7_
_2,736 8_54_
_2 736 854 t
t t
($
($
l ;gg 19.
19.
20.
Unit Service Fr.ctor
Unit Service Fr.ctor Unit Availability Factor
___66.47E_
___66.47E_
_ 5 9._O.1 x_ _
_ 5_Q. O_1 x l ;gg 20.
Unit Availability Factor
___G6.4Zx_
___G6.4Zx_
_ 5 9 ._O.1 x_ _
Sg.01x_
Sg.01x_                     __
50.013
_ 5_Q . O_1 x 50.013
-o 21.
    -o         21.         Unit Capacity Factor                                                                                                                                                                               l l
Unit Capacity Factor
  ' o@                       (Uning MDC Net)                                                         ___602 3_3x_                         __
' o@
46.70x                     ____46 dog l g4
(Uning MDC Net) l
: 22.         Unit Capacity Factor m                       (Using DER Net)                                                         __ _6_0_ ._33_3_                     ____46 dOx_                               _ _ _ _ 4 6 ._7_ 0_ x
___60 3_3x_
  ,$$          23.         Unit Forced Outage Rate                                                 ___33.53x                             ____18.343_                               ____18.34%                               )
____46 dog 46.70x 2
mar 24.                 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration                                                                                                                                   l of Each):         _ _ _ _ _ _ _ _ _ __              _______                              __________________                                                                                      1 If Shutdown At End of Report Period, Estimated Date of Startup:_ _ _ _ _
l g4 22.
Unit Capacity Factor m
(Using DER Net)
__ _6_0_._33_3_
____46 dOx_
_ _ _ _ 4 6._7_ 0_ x 23.
Unit Forced Outage Rate
___33.53x
____18.343_
____18.34%
)
mar 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25.
25.
_------                                    _-----=__                                          .-------                                                          --            1
If Shutdown At End of Report Period, Estimated Date of Startup:_ _ _ _ _
: 26.         --- -Units _.in Test Status (Prior To Commercial Operation):- - - = =_ =                                                                                                                           )
26.
Forecast                       Achieved INITIAL CRITICALITY                                                                                                 5/85~~~                       5/25/85                     l INITIAL ELECTRICITY                                                                                         ~ ~[62 85__
--- -Units _.in Test Status (Prior To Commercial Operation):- - - = =_ =
__                            _6 J
1
                                                                                                                                                                                      ~~2~~O/85~~-~                    \
_-----=__
COMMERCIAL OPERATION                                                                                             11/85                           2/13/86
)
Forecast Achieved INITIAL CRITICALITY 5/85~~~
~~2~~O/85~~-~
l 5/25/85 INITIAL ELECTRICITY
~ ~[62 85__
_6 J
\\
COMMERCIAL OPERATION 11/85 2/13/86


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. __59-52Q_________
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. __59-52Q_________
UNIT ___             __PVNGS-1                   _______
UNIT ___
DATE ____ _ _         _Q94QQ/86_______
__PVNGS-1 DATE ____ _ _
C O M P L E T E D B Y J_ . M_ . _ C_ o l v 1 1 1_e _ _
_Q94QQ/86_______
T E L E P H O N E _ _ _ 6_ 0_ 2_ _ 9_ 3_ 2_ _ 5_ 3 0 0 _ _     -
C O M P L E T E D B Y J_. M_. _ C_ o l v 1 1 1_e _ _
T E L E P H O N E _ _ _ 6_ 0_ 2_ _ 9_ 3_ 2_ _ 5_ 3 0 0 _ _
_ _ _ E_ x_ t_ _. _ 6_ 5_ 9_ 3_ _ _ _ _ _ _
_ _ _ E_ x_ t_ _. _ 6_ 5_ 9_ 3_ _ _ _ _ _ _
_MgyTH:           August 1986 DAY AVERAGE DAILY POWER LEVEL                                         DAY AVERAGE DAILY. POWER LEVEL 1   __=                _14232___                                       17 __           ___1,127                 _________
_MgyTH:
    .2   ___              __12g33____                 ___                is _           ___1,g12____________
August 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY. POWER LEVEL 1
3   _ _ _ _            1,233__=                                       19 ___           __1,314_______                                   __
_14232___
4   ____              __1,233_____                                   20 _=           ___1,gto             _            ______
17 __
5    ___              ___1,399____                                     21                   1112g_______
___1,127
6   _=-                  _12Z__                                       22             ___1,158____
__=
7   ___                          9_____                               23 ___               _1,192___ _ _ __
.2
a   _=                          _9__=         _                      24 ____             _1,g19             =__                 - - - -
__12g33____
9   ____                          9___                 __              25 =_               =1,g31____________
is _
10   --          _=
___1,g12____________
____g____               _ ___                  26 __               =1,22g____________
3 1,233__=
11 _______                 __
19 ___
__  9___                 __              27 _-             __1,g14______             _                        _
__1,314_______
12 _ _ _ _             _____9_===                                       28 ___             _1,g12--                - - - - -            --
4
13 ___                           _9_ _ _ _ _                           29 __             -_1,g19 _ _ _      _
__1,233_____
14 ____                     40_
20 _=
                                  =     _ 6_ = - -                           30 _         _ _ _ _ _ _2_3_9- --
___1,gto 5
15 _ _ ---                       _9_==                 __              31 __           _ _ _ _ _ 3 3 3 _ _ _ _ ---           -____
___1,399____
16 _ _ _         _ = _     222___________
21 1112g_______
l 1
6
l I
_12Z__
                    - - ~ ,                       -            - - , . - . ,    , - .
22
___1,158____
_=-
7 9_____
23 ___
_1,192___ _ _ __
a
_9__=
24 ____
_1,g19
_=
=__
9 9___
25 =_
=1,g31____________
10
_=
____g____
26 __
=1,22g____________
11 _______
9___
27 _-
__1,g14______
12 _ _ _ _
_____9_===
28 ___
_1,g12--
13 ___
_9_ _ _ _ _
29 __
-_1,g19 _ _ _
14 ____
= _ 6_ = - -
30 _
_ _ _ _ _ _2_3_9- --
40_
15 _ _ ---
_9_==
31 __
_ _ _ _ _ 3 3 3 _ _ _ _ ---
16 _ _ _
_ = _
222___________
l l
I
- - ~,


REFUELING INFORMATION DOCKET NO.       50-528_______     ,
REFUELING INFORMATION DOCKET NO.
UNIT             pVNgS-1 _ ____
50-528_______
DATE             09/08/_89_____
UNIT pVNgS-1 _ ____
COMPLETED BY     J 2N2___Colv_iM e TELEPHONE         gO2,-932-5_300_
DATE 09/08/_89_____
COMPLETED BY J N ___Colv_iM e 2 2 TELEPHONE gO2,-932-5_300_
2
2
                                                                                  'Eyt.__6593;___
'Eyt.__6593;___
: 1. Scheduled date for next refueling shutdown.
1.
03/13/87
Scheduled date for next refueling shutdown.
: 2. Scheduled date for restart following refueling.
03/13/87 2.
04/19/87
Scheduled date for restart following refueling.
: 3. Will refueling or resumption or operation thereafter require a Technical Specification change or other license amendment?
04/19/87 3.
Will refueling or resumption or operation thereafter require a Technical Specification change or other license amendment?
Not Yet Determined What will these be?
Not Yet Determined What will these be?
Not Yet Determined
Not Yet Determined 4.
: 4. Scheduled date for submitting proposed licensing action and eupporting information.
Scheduled date for submitting proposed licensing action and eupporting information.
Not Yet Determined
Not Yet Determined 5.
: 5. Importent Licensing considerations associated with refueling, e.g. new or different fuel desic   or supplier, unreviewed design or performence analysis methods. aignificant changes in fuel design, new operating procedures.
Importent Licensing considerations associated with refueling, e.g.
1 Not Yet Determined                                                                 l l
new or different fuel desic or supplier, unreviewed design or performence analysis methods. aignificant changes in fuel design, new operating procedures.
: 6. The number of fuel assemblies.
Not Yet Determined 6.
l l
The number of fuel assemblies.
a) In the core. ____241   __                                                      ;
a)
l b) In the spent fuel storage pool.       __      O_     _
In the core. ____241 b)
: 7. Licensed spent fuel storage capacity.             1329___                         l Intended change in spent fuel storage cepacity.             ___yone___
In the spent fuel storage pool.
l
O_
: 8. Pro 3ected date of last refueling that can be discharged to spent                   1 fuel storage pool a==iming present capacity.                                       l 2002 (w/ annual reloads and full core discharge capability).
7.
    .          . _        _                        _ - - -                            _ . _O
Licensed spent fuel storage capacity.
1329___
l Intended change in spent fuel storage cepacity.
___yone___
l 8.
Pro 3ected date of last refueling that can be discharged to spent 1
fuel storage pool a==iming present capacity.
2002 (w/ annual reloads and full core discharge capability).
O


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET MO.                   39 --}23__ __ _ _ _
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET MO.
UNIT                         Pyugg-1______
39 --}23__ __ _ _ _
DATE                         09/95/_83_____       j COMPLETED BY                 L N._Co_1 vim e TELEPHONE                     GOO 2_-932-5_3pO_
UNIT Pyugg-1______
E2fiz__6593 __ __
DATE 09/95/_83_____
l l
j COMPLETED BY L N._Co_1 vim e TELEPHONE GOO 2_-932-5_3pO_
08/01           0000         Reactor Power et 1004 - Mode 1.
E iz__6593 __ __
08/06           0412         Reactor Trip due to loss of offsite power source when Startup Transformer NAN-XO3 relayed out - Entered Mode 3.
2f l
08/13           1132         Reactor               a. .itical                                           -
l 08/01 0000 Reactor Power et 1004 - Mode 1.
Entered Mode 2.
08/06 0412 Reactor Trip due to loss of offsite power source when Startup Transformer NAN-XO3 relayed out - Entered Mode 3.
08/13           1608         Entered Mode 1.
08/13 1132 Reactor
C8/13           1955         Synchronized Main Generator to Grid.
: a..itical Entered Mode 2.
08/14           0300         Reactor Power at 404.
08/13 1608 Entered Mode 1.
t 08/15           0035         Tripped Main Turbine to test operation of Fast Bus Transfer - Reactor Trip on Hi Pressurizer Pressure.
C8/13 1955 Synchronized Main Generator to Grid.
08/14 0300 Reactor Power at 404.
t 08/15 0035 Tripped Main Turbine to test operation of Fast Bus Transfer - Reactor Trip on Hi Pressurizer Pressure.
Entered Mode 3.
Entered Mode 3.
08/16         0510         Reactor Critical - Entered Mode 2.
08/16 0510 Reactor Critical - Entered Mode 2.
08/16           0639         Entered Mode 1.
08/16 0639 Entered Mode 1.
08/16           104O                                                                                                                                                     l Synchronized Main Generator to Grid.                                                                                                         '
l 08/16 104O Synchronized Main Generator to Grid.
08/16           1422         Reactor Power at 203 08/17           0650         Reactor Power at 1004.
08/16 1422 Reactor Power at 203 08/17 0650 Reactor Power at 1004.
08/30         0518         Reactor Trip on SG #1 Low RC Flow - Entered Mode 3.
08/30 0518 Reactor Trip on SG #1 Low RC Flow - Entered Mode 3.
08/31           0312         Reactor Critical - Entered Mode 2.
08/31 0312 Reactor Critical - Entered Mode 2.
l         08/31           0608         Entered Mode 1.
l 08/31 0608 Entered Mode 1.
08/31           1300         Synchronized Main Generator to Grid.
08/31 1300 Synchronized Main Generator to Grid.
08/31           1654         Reactor Power at 45x.
08/31 1654 Reactor Power at 45x.


                                                          ' O ' UNIT SHUTDOWNS NO POWER REDUCTIONS 2.e;                           DOCKET NO.     Mn-99A
' O ' UNIT SHUTDOWNS NO POWER REDUCTIONS 2.e; DOCKET NO.
                                                                                                                          '       UNIT NANC     PVNf.S-l           .
Mn-99A
                                                                                                                                                                                              ~'
~'
COMPLETE                   olvltle     ,
UNIT NANC PVNf.S-l COMPLETE olvltle TELEPif0NC OU-5 mo
TELEPif0NC   OU-5 mo
_Fve MG3 i
_Fve   MG3                             ,
Hethod or Shutting Down System Component Cause & Corrective n
Hethod or
1 Dura t ion 2
* i Shutting
3 f.ER 4
* Down                             System   Component               Cause & Corrective                           n 1     Dura t ion             2                 3     f.ER                   4             5                 Action to No.     Dste   Type       ( flou rs )   Reason         Reactor           No.               Code       Code
5 Action to No.
* Prevent Recurrence 6     8/6/86     F           183.7           A               3         1-86-003               EA         XCT           Reactor trip due to loss of offsite power source whe'n Startup Transformer           ~
Dste Type
NAN-XO3 relayed out.     .
( flou rs )
7     8/15/86   S             ,0             B             N/A             N/A                                   .      Tripped Main Turbine to test operation
Reason Reactor No.
                                                                              .                                                      of Fas't Bus Tr'a.hsfer.
Code Code
8     8/15/86   F   .          34.1         A                 3         1-86-045               JI         FCV           Reactor trip on Hi Pre,ssurizer Pressure.
* Prevent Recurrence 6
9     8/30/86   F             31.7         .A                 3         1-86-033               JC         PDT           Reactor trip on SG #1 Low RC Flow.
8/6/86 F
                                                                                                    ,                                            a
183.7 A
                                                                                                                                                                                  *i I
3 1-86-003 EA XCT Reactor trip due to loss of offsite power source whe'n Startup Transformer NAN-XO3 relayed out.
1              2
~
                                                                                                                                                                                    ' t F-forced                                                                        -
7 8/15/86 S
3                               is
,0 B
                                                                                                                                                                                          ~
N/A N/A Tripped Main Turbine to test operation of Fas't Bus Tr'a.hsfer.
Reason:                                                                 Method:
8 8/15/86 F
S-Scheduled   A-[Quipment reiluro (Explain)                                           1-Hanpal                         Exhibit T - Instructions D-tfaintenance or Test                                                                                    for rrnparation of Datn                   /
34.1 A
C-ncruceIng                                                            2-Hanoni Scram.                   Entry slicets for Licensee D-negulatory Restriction                                                J-Automa tic Scram.               Event Report (LER) File                 '
3 1-86-045 JI FCV Reactor trip on Hi Pre,ssurizer Pressure.
[-onorator training & License Examination                              4-continuation from-             (NUREC 0161) r-Administrativo                                                             ernvious Month q
9 8/30/86 F
31.7
.A 3
1-86-033 JC PDT Reactor trip on SG #1 Low RC Flow.
a
*i I
' t 1
2 3
is
~
F-forced Reason:
Method:
Exhibit T - Instructions S-Scheduled A-[Quipment reiluro (Explain) 1-Hanpal for rrnparation of Datn
/
D-tfaintenance or Test 2-Hanoni Scram.
Entry slicets for Licensee C-ncruceIng J-Automa tic Scram.
Event Report (LER) File D-negulatory Restriction 4-continuation from-(NUREC 0161)
[-onorator training & License Examination ernvious Month r-Administrativo q
C-operational Error (Explain)
C-operational Error (Explain)
* 5-nedoction or 20%             5                                       '
* 5-nedoction or 20%
H-Other (Explain)
5 or Creator In the Exhibit H-Same Source H-Other (Explain)
* or Creator In the             Exhibit H-Same Source
Past 2's flours g.
.                                                                          -                          Past 2's flours Onhnes                        *
9.other (Exp osin)
                                                            ?
Onhnes
: g.             9.other (Exp osin) l
?
l


r-7' #
r-7' #
Line 194: Line 332:


==Dear Mr. Scroggins:==
==Dear Mr. Scroggins:==
Attached please find the August, 1986, Monthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifica-tions) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License.
Attached please find the August, 1986, Monthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifica-tions) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License.
By copy of this letter we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.
By copy of this letter we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.
If you have any questions, please contact me.
If you have any questions, please contact me.
Very truly yours, NV J. G. Hay es Vice President Nuclear Production JGH/PGN/rw Attachment cc:   O. M. De Michele       (all w/a)
Very truly yours, NV J. G. Hay es Vice President Nuclear Production JGH/PGN/rw Attachment cc:
O. M. De Michele (all w/a)
E. E. Van Brunt, Jr.
E. E. Van Brunt, Jr.
J. B. Martin R. P. Zimmerman E. A. Licitra A. C. Gehr INP0 Records Center
J. B. Martin R. P. Zimmerman E. A. Licitra A. C. Gehr INP0 Records Center
                                                                                                    % 62-I r I;l}}
% 62-I r
I;l}}

Latest revision as of 22:07, 6 December 2024

Monthly Operating Rept for Aug 1986
ML20207D611
Person / Time
Site: Palo Verde 
Issue date: 08/31/1986
From: Colville J, Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ANPP-38245-JGH, NUDOCS 8612310113
Download: ML20207D611 (6)


Text

f 4

NRC MONTHLY OPERATING REPORT DOCKET NO.

1Q-32@

UNIT NAME

_P V _N G S _- 1_ __ -

DATE

_0 _9 _/ 0 8 / 8 _6 COMPLETED BY J2N._golv111e TELEPHONE

_692-932--5390 l

OPEltATJNG STATUS

~

~

1.

Unit Name: Pglo Vggde Ngclear_Genergting_Eggtient_Qnth_1 2.

Reporting Period:

A_u_ gust _1986 3.

Licensed Thermal Power (MWt): 3800

~-

4.

Nameplate Rating (Gross MWe): [14O[3 5.

Design Electrical Rating (Not MWe):

1231 6.

Maximum Dependable Capacity (Gross MWe): 1_303 7.

Maximus Dependable Capacity (Not NWe):

1221 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

==

9.

Power Level to Which Restricted, If Any (Not MWe): _NQNE-10.

Reasons For Restrictions, If Any:

_=---

=

This Month Yr.-to-Date Cumulative 11.

Houre in Reporting Period 744___

___4800

___4800___

12.

Number of Hours Reactor Was Critical

____518.2_

2476.4 13.

Reactor Reserve Shutdown 247@.2_

Houra

_____O O_____

_____g____

j 14.

Hours Generator On-Line

____494.5_

___2409._3__

24Q9 3, 15.

Unit Reserve Shutdown Houra O

O O

16.

Gross Thermal Energy Generatad (HWH) 1_ t74Qt@82_

_8 644,_305_

6

_8_g_44 395 g

t m

17.

Gross Electrical Energy i

Q@

Generated (MWH)

__59_3, M _

_2 9_Z6 M _

_ 2 9_ 7_6_ t3go j

t t

t l gga 18.

Net Electrical Energy

'00 Generated (MWH)

__548,_O9_7_

_2,736 8_54_

_2 736 854 t

t t

($

19.

Unit Service Fr.ctor

___66.47E_

_ 5 9._O.1 x_ _

_ 5_Q. O_1 x l ;gg 20.

Unit Availability Factor

___G6.4Zx_

Sg.01x_

50.013

-o 21.

Unit Capacity Factor

' o@

(Uning MDC Net) l

___60 3_3x_

____46 dog 46.70x 2

l g4 22.

Unit Capacity Factor m

(Using DER Net)

__ _6_0_._33_3_

____46 dOx_

_ _ _ _ 4 6._7_ 0_ x 23.

Unit Forced Outage Rate

___33.53x

____18.343_

____18.34%

)

mar 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

25.

If Shutdown At End of Report Period, Estimated Date of Startup:_ _ _ _ _

26.

--- -Units _.in Test Status (Prior To Commercial Operation):- - - = =_ =

1

_-----=__

)

Forecast Achieved INITIAL CRITICALITY 5/85~~~

~~2~~O/85~~-~

l 5/25/85 INITIAL ELECTRICITY

~ ~[62 85__

_6 J

\\

COMMERCIAL OPERATION 11/85 2/13/86

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. __59-52Q_________

UNIT ___

__PVNGS-1 DATE ____ _ _

_Q94QQ/86_______

C O M P L E T E D B Y J_. M_. _ C_ o l v 1 1 1_e _ _

T E L E P H O N E _ _ _ 6_ 0_ 2_ _ 9_ 3_ 2_ _ 5_ 3 0 0 _ _

_ _ _ E_ x_ t_ _. _ 6_ 5_ 9_ 3_ _ _ _ _ _ _

_MgyTH:

August 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY. POWER LEVEL 1

_14232___

17 __

___1,127

__=

.2

__12g33____

is _

___1,g12____________

3 1,233__=

19 ___

__1,314_______

4

__1,233_____

20 _=

___1,gto 5

___1,399____

21 1112g_______

6

_12Z__

22

___1,158____

_=-

7 9_____

23 ___

_1,192___ _ _ __

a

_9__=

24 ____

_1,g19

_=

=__

9 9___

25 =_

=1,g31____________

10

_=

____g____

26 __

=1,22g____________

11 _______

9___

27 _-

__1,g14______

12 _ _ _ _

_____9_===

28 ___

_1,g12--

13 ___

_9_ _ _ _ _

29 __

-_1,g19 _ _ _

14 ____

= _ 6_ = - -

30 _

_ _ _ _ _ _2_3_9- --

40_

15 _ _ ---

_9_==

31 __

_ _ _ _ _ 3 3 3 _ _ _ _ ---

16 _ _ _

_ = _

222___________

l l

I

- - ~,

REFUELING INFORMATION DOCKET NO.

50-528_______

UNIT pVNgS-1 _ ____

DATE 09/08/_89_____

COMPLETED BY J N ___Colv_iM e 2 2 TELEPHONE gO2,-932-5_300_

2

'Eyt.__6593;___

1.

Scheduled date for next refueling shutdown.

03/13/87 2.

Scheduled date for restart following refueling.

04/19/87 3.

Will refueling or resumption or operation thereafter require a Technical Specification change or other license amendment?

Not Yet Determined What will these be?

Not Yet Determined 4.

Scheduled date for submitting proposed licensing action and eupporting information.

Not Yet Determined 5.

Importent Licensing considerations associated with refueling, e.g.

new or different fuel desic or supplier, unreviewed design or performence analysis methods. aignificant changes in fuel design, new operating procedures.

Not Yet Determined 6.

The number of fuel assemblies.

a)

In the core. ____241 b)

In the spent fuel storage pool.

O_

7.

Licensed spent fuel storage capacity.

1329___

l Intended change in spent fuel storage cepacity.

___yone___

l 8.

Pro 3ected date of last refueling that can be discharged to spent 1

fuel storage pool a==iming present capacity.

2002 (w/ annual reloads and full core discharge capability).

O

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET MO.

39 --}23__ __ _ _ _

UNIT Pyugg-1______

DATE 09/95/_83_____

j COMPLETED BY L N._Co_1 vim e TELEPHONE GOO 2_-932-5_3pO_

E iz__6593 __ __

2f l

l 08/01 0000 Reactor Power et 1004 - Mode 1.

08/06 0412 Reactor Trip due to loss of offsite power source when Startup Transformer NAN-XO3 relayed out - Entered Mode 3.

08/13 1132 Reactor

a..itical Entered Mode 2.

08/13 1608 Entered Mode 1.

C8/13 1955 Synchronized Main Generator to Grid.

08/14 0300 Reactor Power at 404.

t 08/15 0035 Tripped Main Turbine to test operation of Fast Bus Transfer - Reactor Trip on Hi Pressurizer Pressure.

Entered Mode 3.

08/16 0510 Reactor Critical - Entered Mode 2.

08/16 0639 Entered Mode 1.

l 08/16 104O Synchronized Main Generator to Grid.

08/16 1422 Reactor Power at 203 08/17 0650 Reactor Power at 1004.

08/30 0518 Reactor Trip on SG #1 Low RC Flow - Entered Mode 3.

08/31 0312 Reactor Critical - Entered Mode 2.

l 08/31 0608 Entered Mode 1.

08/31 1300 Synchronized Main Generator to Grid.

08/31 1654 Reactor Power at 45x.

' O ' UNIT SHUTDOWNS NO POWER REDUCTIONS 2.e; DOCKET NO.

Mn-99A

~'

UNIT NANC PVNf.S-l COMPLETE olvltle TELEPif0NC OU-5 mo

_Fve MG3 i

Hethod or Shutting Down System Component Cause & Corrective n

1 Dura t ion 2

3 f.ER 4

5 Action to No.

Dste Type

( flou rs )

Reason Reactor No.

Code Code

  • Prevent Recurrence 6

8/6/86 F

183.7 A

3 1-86-003 EA XCT Reactor trip due to loss of offsite power source whe'n Startup Transformer NAN-XO3 relayed out.

~

7 8/15/86 S

,0 B

N/A N/A Tripped Main Turbine to test operation of Fas't Bus Tr'a.hsfer.

8 8/15/86 F

34.1 A

3 1-86-045 JI FCV Reactor trip on Hi Pre,ssurizer Pressure.

9 8/30/86 F

31.7

.A 3

1-86-033 JC PDT Reactor trip on SG #1 Low RC Flow.

a

  • i I

' t 1

2 3

is

~

F-forced Reason:

Method:

Exhibit T - Instructions S-Scheduled A-[Quipment reiluro (Explain) 1-Hanpal for rrnparation of Datn

/

D-tfaintenance or Test 2-Hanoni Scram.

Entry slicets for Licensee C-ncruceIng J-Automa tic Scram.

Event Report (LER) File D-negulatory Restriction 4-continuation from-(NUREC 0161)

[-onorator training & License Examination ernvious Month r-Administrativo q

C-operational Error (Explain)

  • 5-nedoction or 20%

5 or Creator In the Exhibit H-Same Source H-Other (Explain)

Past 2's flours g.

9.other (Exp osin)

Onhnes

?

l

r-7' #

C Arizona Nuclear Power Project P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 September 15, 1986 ANPP-38245-JGH/PGN/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Fbnagement U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528 (License NPF-41)

August Monthly Operating Report File: 86-024-404

Dear Mr. Scroggins:

Attached please find the August, 1986, Monthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifica-tions) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License.

By copy of this letter we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.

If you have any questions, please contact me.

Very truly yours, NV J. G. Hay es Vice President Nuclear Production JGH/PGN/rw Attachment cc:

O. M. De Michele (all w/a)

E. E. Van Brunt, Jr.

J. B. Martin R. P. Zimmerman E. A. Licitra A. C. Gehr INP0 Records Center

% 62-I r

I;l