TXX-6151, Interim Deficiency Rept CP-85-50 Re Use of Improper Welding Processes in Mfg of Cable Tray Tee Fittings Which Could Affect Equipment Qualification.Initially Reported on 851206. Next Rept Expected by 870428: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Log # TXX-6151 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER . ehe NORTH OLIVE STRErr.1.B. 88 . DALLAB. TEXAS 75301 December 15, 1986 wiwAM. | {{#Wiki_filter:Log # TXX-6151 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. ehe NORTH OLIVE STRErr.1.B. 88. DALLAB. TEXAS 75301 December 15, 1986 wiwAM. G COUN...M.n j | ||
.. mm | |||
.m Mr. Eric H. Johnson, Director l 's DEC I 91986 Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission | |||
U. S. Nuclear Regulatory Commission | [ | ||
l 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 | |||
==SUBJECT:== | ==SUBJECT:== | ||
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | ||
DOCKET NOS. 50-445 AND 50-446 CABLE TRAY TEE FITTINGS SDAR: | DOCKET NOS. 50-445 AND 50-446 CABLE TRAY TEE FITTINGS SDAR: | ||
CP-85-50 (INTERIM REPORT) | |||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On December 6,1985, we verbally notified your Mr. H. S. Phillips of a deficiency involving the use of improper welding processes in the manufacturing of cable tray tee fittings which could affect the equipment qualification. _This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our latest report, logged TXX-6050, was submitted on October 21, 1986. | On December 6,1985, we verbally notified your Mr. H. S. Phillips of a deficiency involving the use of improper welding processes in the manufacturing of cable tray tee fittings which could affect the equipment qualification. _This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our latest report, logged TXX-6050, was submitted on October 21, 1986. | ||
The test program outlined in our last interim report was anticipated to be completed in November, 1986. However, this scheduled date has since been | The test program outlined in our last interim report was anticipated to be completed in November, 1986. However, this scheduled date has since been postponed. We are presently scheduled to be finished by March 15, 1987. Our c #J assessment of this deficiency on the safety of plant operations in the event | ||
~ | |||
postponed. We are presently scheduled to be finished by March 15, 1987. Our | the condition had remained undetected is pending evaluation of these test 7 | ||
c #J assessment of this deficiency on the safety of plant operations in the event the condition had remained undetected is pending evaluation of these test results. | results. | ||
We anticipate submitting our next report on this issue no later than April 28, 1987. | We anticipate submitting our next report on this issue no later than April 28, 1987. | ||
Very truly yours, WdEb By: | Very truly yours, WdEb By: | ||
G. S. Keeley Manager, Nuclea | / | ||
G. S. Keeley Manager, Nuclea ng RS8/gj c - NRC Region IV (0 + 1 copy) | |||
Director, Inspection and Enforcement (15 copies) | Director, Inspection and Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 | U. S. Nuclear Regulatory Commission Washington, D. C. | ||
20555 s cruswv or rrys mimrs vsrcraic anumr g,[ | |||
e612310241 861215 | |||
,4 v m( | |||
DR ADOCK 0500 5 | |||
. _ _. _ _. _ _ _ _ _...}} | |||
Latest revision as of 23:04, 6 December 2024
| ML20207D842 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/15/1986 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-85-50, TXX-6151, NUDOCS 8612310241 | |
| Download: ML20207D842 (1) | |
Text
Log # TXX-6151 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. ehe NORTH OLIVE STRErr.1.B. 88. DALLAB. TEXAS 75301 December 15, 1986 wiwAM. G COUN...M.n j
.. mm
.m Mr. Eric H. Johnson, Director l 's DEC I 91986 Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission
[
l 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 CABLE TRAY TEE FITTINGS SDAR:
CP-85-50 (INTERIM REPORT)
Dear Mr. Johnson:
On December 6,1985, we verbally notified your Mr. H. S. Phillips of a deficiency involving the use of improper welding processes in the manufacturing of cable tray tee fittings which could affect the equipment qualification. _This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our latest report, logged TXX-6050, was submitted on October 21, 1986.
The test program outlined in our last interim report was anticipated to be completed in November, 1986. However, this scheduled date has since been postponed. We are presently scheduled to be finished by March 15, 1987. Our c #J assessment of this deficiency on the safety of plant operations in the event
~
the condition had remained undetected is pending evaluation of these test 7
results.
We anticipate submitting our next report on this issue no later than April 28, 1987.
Very truly yours, WdEb By:
/
G. S. Keeley Manager, Nuclea ng RS8/gj c - NRC Region IV (0 + 1 copy)
Director, Inspection and Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 s cruswv or rrys mimrs vsrcraic anumr g,[
e612310241 861215
,4 v m(
DR ADOCK 0500 5
. _ _. _ _. _ _ _ _ _...