{{#Wiki_filter:,
{{#Wiki_filter:,
    -
-
  .
.
                                          JUL 181986
JUL 181986
      Docket No. 50-455
Docket No. 50-455
      Commonwealth Edison Company
Commonwealth Edison Company
      ATTN: Mr. Cordell Reed
ATTN: Mr. Cordell Reed
              Vice President
Vice President
      Post Office Box 767
Post Office Box 767
      Chicago, IL 60690
Chicago, IL 60690
      Gentlemen:
Gentlemen:
      This refers to the routine safety inspection conducted by Mr. K. D. Ward of
This refers to the routine safety inspection conducted by Mr. K. D. Ward of
      this office on June 18-19, 24-25, 30, July 1 and 10, 1986, of activities at
this office on June 18-19, 24-25, 30, July 1 and 10, 1986, of activities at
      Byron Station, Unit 2, authorized by NRC Construction Permit No. CPPR-131
Byron Station, Unit 2, authorized by NRC Construction Permit No. CPPR-131
      and to the discussion of our findings with Mr. R. Klingler at the conclusion
and to the discussion of our findings with Mr. R. Klingler at the conclusion
      of the inspection.
of the inspection.
      The enclosed copy of our inspection report identifies areas examined during
The enclosed copy of our inspection report identifies areas examined during
      the inspection. Within these areas, the inspection consisted of a selective
the inspection. Within these areas, the inspection consisted of a selective
      examination of procedures and representative records, observations, and
examination of procedures and representative records, observations, and
      interviews with personnel.
interviews with personnel.
      No violations of NRC requirements were identified during the course of this
No violations of NRC requirements were identified during the course of this
      inspection.
inspection.
      In accordance with 10 CFR 2.790 of the Consission's regulations, a copy of
In accordance with 10 CFR 2.790 of the Consission's regulations, a copy of
      this letter, the enclosures, and your response to this letter will be placed
this letter, the enclosures, and your response to this letter will be placed
      in the NRC Public Document Room.
in the NRC Public Document Room.
      We will gladly discuss any questions you have concerning this inspection.
We will gladly discuss any questions you have concerning this inspection.
                                                    Sincerely,
Sincerely,
                                                    " Original signed by N.J. Chrissotte'es"
" Original signed by N.J. Chrissotte'es"
                                                    J. J. Harrison, Chief
J. J. Harrison, Chief
                                                    Engineering Branch
Engineering Branch
      Enclosure:     Inspection Report
Enclosure:
        No. 50-455/86018(DRS)
Inspection Report
                                                                        -
No. 50-455/86018(DRS)
                                                                    5
-
      See Attached Distribution         yIO72ggg gg$
yIO72ggg gg$
                                        G
5
                          3
See Attached Distribution
        M                Y/
G
        III           bRIII               RIII             RIII
3
              c                           Da       on       Ha         n
Y/
        // 86                                                       s (,
M
i         -.       -             . . .       . .
III
                                                      -.       ..         ..   .   -
bRIII
                                                                                            e/ m
RIII
                                                                                              ._ . -
RIII
c
Da
on
Ha
n
// 86
s (,
i
e/ m
-.
-
. . .
.
.
-.
..
..
.
-
._
.
-


    '
'
  .
.
                                                    I
Connonwealth Edison Company
                                                    l
2
      Connonwealth Edison Company       2 g i 3 gg
g i 3 gg
      cc w/ enclosure:
cc w/ enclosure:
      D. L. Farrar, Director
D. L. Farrar, Director
        of Nuclear Licensing
of Nuclear Licensing
      V. I. Schlosser, Project Manager
V. I. Schlosser, Project Manager
      Gunner Sorensen, Site Project
Gunner Sorensen, Site Project
        Superintendent
Superintendent
      R. E. Querio, Plant Manager
R. E. Querio, Plant Manager
      DCS/RSB (RIDS)
DCS/RSB (RIDS)
      Licensing Fee Management Branch
Licensing Fee Management Branch
      Resident Inspector, RIII Byron
Resident Inspector, RIII Byron
      Resident Inspector, RIII
Resident Inspector, RIII
        Braidwood
Braidwood
      Phyllis Dunton, Attorney
Phyllis Dunton, Attorney
        General's Office, Environmental
General's Office, Environmental
        Control Division
Control Division
      D. W. Cassel , Jr. , Esq.
D. W. Cassel , Jr. , Esq.
      Diane Chavez, DAARE/ SAFE
Diane Chavez, DAARE/ SAFE
      Steve Lewis, ELD
Steve Lewis, ELD
      L. Olshan, NRR LPM
L. Olshan, NRR LPM
      H. S. Taylor, Quality Assurance
H. S. Taylor, Quality Assurance
        Division
Division
!                           .
!
.
}}
}}

Latest revision as of 21:27, 6 December 2024

Forwards Safety Insp Rept 50-455/86-18 on 860618-19,0624-25, 0630 & 0701-10.No Violation Noted
ML20207G404
Person / Time
Site: Byron 
Issue date: 07/18/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20207G409 List:
References
NUDOCS 8607230063
Download: ML20207G404 (2)


See also: IR 05000455/1986018

Text

,

-

.

JUL 181986

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. D. Ward of

this office on June 18-19, 24-25, 30, July 1 and 10, 1986, of activities at

Byron Station, Unit 2, authorized by NRC Construction Permit No. CPPR-131

and to the discussion of our findings with Mr. R. Klingler at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Consission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original signed by N.J. Chrissotte'es"

J. J. Harrison, Chief

Engineering Branch

Enclosure:

Inspection Report

No. 50-455/86018(DRS)

-

yIO72ggg gg$

5

See Attached Distribution

G

3

Y/

M

III

bRIII

RIII

RIII

c

Da

on

Ha

n

// 86

s (,

i

e/ m

-.

-

. . .

.

.

-.

..

..

.

-

._

.

-

'

.

Connonwealth Edison Company

2

g i 3 gg

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel , Jr. , Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, ELD

L. Olshan, NRR LPM

H. S. Taylor, Quality Assurance

Division

!

.