TXX-4914, Interim Deficiency Rept CP-86-37 Re Firing Board Assemblies & Amplifier Boards Used in Class 1E Battery Chargers Not Conforming to Vendor Assembly Drawings.Initially Reported on 860514.Next Rept Will Be Submitted by 860829: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
{{#Wiki_filter:Log # TXX-4914 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYW AY TOWF.R e 400 NORTH OI.IVE STREET. L.B. a l
{{#Wiki_filter:Log # TXX-4914 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYW AY TOWF.R e 400 NORTH OI.IVE STREET. L.B. a l
* D AELAN. TEXAS 75201 July 16, 1986 gg 1
* D AELAN. TEXAS 75201 July 16, 1986 gg 1
.ThC:&?2?."lh Mr. Eric H. Johnson, Director                                                   u" Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
.ThC:&?2?."lh Mr. Eric H. Johnson, Director u"
Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 CLASS lE BATTERY CHARGERS SDAR:   CP-86-37 (INTERIM REPORT)
DOCKET NOS. 50-445 AND 50-446 CLASS lE BATTERY CHARGERS SDAR:
CP-86-37 (INTERIM REPORT)


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
 
On May 14, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving firing board assemblies and amplifier boards used in Class 1E battery chargers that do not conform to vendor assembly drawings.
On May 14, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving firing board assemblies and amplifier boards used in Class 1E battery chargers that do not conform to vendor assembly drawings.                         This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e).
This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e).
We have submitted an interim report logged TXX-4855, dated June 13, 1986.
We have submitted an interim report logged TXX-4855, dated June 13, 1986.
We are continuing our evaluation and anticipate submitting our next report by August 29, 1986.
We are continuing our evaluation and anticipate submitting our next report by August 29, 1986.
Very truly yours, h               LutJY W. G. C       il By:
Very truly yours, h
G. S. Keeley~ /
LutJY W. G. C il By:
G. S. Keeley~
/
Manager, NucleV Licensing JCH/arh c - NRC Region IV (0 + 1 Copy)
Manager, NucleV Licensing JCH/arh c - NRC Region IV (0 + 1 Copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8607300125 860716         5 PDR   ADOCK 0500 S
U. S. Nuclear Regulatory Commission Washington, D.C.
A invissos or rexas urturies us.ecruic costeaur 9}}
20555 8607300125 860716 PDR ADOCK 0500 5
S A invissos or rexas urturies us.ecruic costeaur 9}}

Latest revision as of 21:47, 6 December 2024

Interim Deficiency Rept CP-86-37 Re Firing Board Assemblies & Amplifier Boards Used in Class 1E Battery Chargers Not Conforming to Vendor Assembly Drawings.Initially Reported on 860514.Next Rept Will Be Submitted by 860829
ML20207K922
Person / Time
Site: Comanche Peak  
Issue date: 07/16/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-37, TXX-4914, NUDOCS 8607300125
Download: ML20207K922 (1)


Text

Log # TXX-4914 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYW AY TOWF.R e 400 NORTH OI.IVE STREET. L.B. a l

  • D AELAN. TEXAS 75201 July 16, 1986 gg 1

.ThC:&?2?."lh Mr. Eric H. Johnson, Director u"

Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CLASS lE BATTERY CHARGERS SDAR:

CP-86-37 (INTERIM REPORT)

Dear Mr. Johnson:

On May 14, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving firing board assemblies and amplifier boards used in Class 1E battery chargers that do not conform to vendor assembly drawings.

This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e).

We have submitted an interim report logged TXX-4855, dated June 13, 1986.

We are continuing our evaluation and anticipate submitting our next report by August 29, 1986.

Very truly yours, h

LutJY W. G. C il By:

G. S. Keeley~

/

Manager, NucleV Licensing JCH/arh c - NRC Region IV (0 + 1 Copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8607300125 860716 PDR ADOCK 0500 5

S A invissos or rexas urturies us.ecruic costeaur 9