{{#Wiki_filter:VIMOINIA ELECTRIC AND POWER COMPANY RicIIMoNn,VIHOINIA 202G1 w.t..srs= =r                           December 31, 1986 Vars Passansur Noctuam ormaatsome Mr. Harold R. Denton, Director                         Serial No.                       86-438A Office of Nuclear Reactor Regulation                   No/JDH Attn: Mr. Lester S. Rubenstein, Director               Docket Nos.                     50-280 PWR Project Directorate No. 2                                                 50-281 Division of PWR Licensing-A                   License Nos. DPR-32 U. S. Nuclear Regulatery Commission                                                     DPR-37 Washington, D.C.       20555 Gentlemen:
{{#Wiki_filter:VIMOINIA ELECTRIC AND POWER COMPANY RicIIMoNn,VIHOINIA 202G1 w.t..srs= =r December 31, 1986 Vars Passansur Noctuam ormaatsome Mr. Harold R. Denton, Director Serial No.
86-438A Office of Nuclear Reactor Regulation No/JDH Attn:
Mr. Lester S. Rubenstein, Director Docket Nos.
50-280 PWR Project Directorate No. 2 50-281 Division of PWR Licensing-A License Nos. DPR-32 U. S. Nuclear Regulatery Commission DPR-37 Washington, D.C.
20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT - REVISION 4 We have recently d.itermined that the June 30, 1986 transmittal letter which forwarded Revision
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT - REVISION 4 We have recently d.itermined that the June 30, 1986 transmittal letter which forwarded Revision
* to the Surry Updated Final Safety Analysis Report (UFSAR) was apparently lost during reproduction.       As a consequence, distribution was only made to Virginia Electric and Power Company controlled copies. This discovery occurred as a result of a recent informal examination of the NRC Surry Project Manager's copy of the UFSAR.
* to the Surry Updated Final Safety Analysis Report (UFSAR) was apparently lost during reproduction.
As a consequence, distribution was only made to Virginia Electric and Power Company controlled copies.
This discovery occurred as a result of a recent informal examination of the NRC Surry Project Manager's copy of the UFSAR.
We are taking the following actions:
We are taking the following actions:
: 1. Pursuant to 10CFR50.71(e), we are formally submitting the June 30, 1986 Revision 4 to the Updated Final Safety Analysis Report (UFSAR) for the Surry Power Station Unit Nos. I and 2.                       One signed original and twelve additional copies of the revision to the UFSAR are enclosed. This revision contains those changes necessary to bring the UFSAR up-to-date as of January 1, 1986.
1.
: 2. To preclude recurrence, we will make future submittals of the Surry UFSAR   to NRC as documents requiring receipt acknowledgement.
Pursuant to 10CFR50.71(e), we are formally submitting the June 30, 1986 Revision 4 to the Updated Final Safety Analysis Report (UFSAR) for the Surry Power Station Unit Nos. I and 2.
One signed original and twelve additional copies of the revision to the UFSAR are enclosed.
This revision contains those changes necessary to bring the UFSAR up-to-date as of January 1, 1986.
2.
To preclude recurrence, we will make future submittals of the Surry UFSAR to NRC as documents requiring receipt acknowledgement.
Consistent with that action, we request you sign and rettirn the attached acknowledgement form.
Consistent with that action, we request you sign and rettirn the attached acknowledgement form.
We apologize for any inconvenience caused by this oversight.
We apologize for any inconvenience caused by this oversight.
As a duly authorized officer of Virginia Electric and Power Company, I hereby certify as required by 10CFR50.71(e)(2) that the information given in the enclosed Revision 4 of the UFSAR accurately presents changes made since the
As a duly authorized officer of Virginia Electric and Power Company, I hereby certify as required by 10CFR50.71(e)(2) that the information given in the enclosed Revision 4 of the UFSAR accurately presents changes made since the B701120237
                                                                    ~
~
B701120237 PDR                   231 K       ADOCK o 000280                                                                   t i pA PDR
PDR 231 K
                              ~
ADOCK o 000280 t i pA PDR IJ
IJ
~


previous submittal. Revision 4 reflects previous information and analyses submitted to the Commission or prepared pursuant to Commission requirements.
previous submittal.
Very truly yours, bsA,           e W. L. Stewatt Enclosures cc: Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. Chandu P. Patel NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing No. 2
Revision 4 reflects previous information and analyses submitted to the Commission or prepared pursuant to Commission requirements.
                                                                              =
Very truly yours,
: bsA, e
W. L. Stewatt Enclosures cc:
Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. Chandu P. Patel NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing No. 2
=
W M}}
W M}}

Latest revision as of 20:35, 6 December 2024

Forwards Rev 4 to Updated Fsar,Replacing 860630 Transmittal Ltr Lost During Reproduction.Future Submittals Will Require Receipt Ack to Avoid Recurrence of Util Error
ML20207L564
Person / Time
Site: Surry  
Issue date: 12/31/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Rubenstein L
Office of Nuclear Reactor Regulation
Shared Package
ML20207L566 List:
References
86-438A, NUDOCS 8701120237
Download: ML20207L564 (2)


Text

VIMOINIA ELECTRIC AND POWER COMPANY RicIIMoNn,VIHOINIA 202G1 w.t..srs= =r December 31, 1986 Vars Passansur Noctuam ormaatsome Mr. Harold R. Denton, Director Serial No.

86-438A Office of Nuclear Reactor Regulation No/JDH Attn:

Mr. Lester S. Rubenstein, Director Docket Nos.

50-280 PWR Project Directorate No. 2 50-281 Division of PWR Licensing-A License Nos. DPR-32 U. S. Nuclear Regulatery Commission DPR-37 Washington, D.C.

20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT - REVISION 4 We have recently d.itermined that the June 30, 1986 transmittal letter which forwarded Revision

As a consequence, distribution was only made to Virginia Electric and Power Company controlled copies.

This discovery occurred as a result of a recent informal examination of the NRC Surry Project Manager's copy of the UFSAR.

We are taking the following actions:

1.

Pursuant to 10CFR50.71(e), we are formally submitting the June 30, 1986 Revision 4 to the Updated Final Safety Analysis Report (UFSAR) for the Surry Power Station Unit Nos. I and 2.

One signed original and twelve additional copies of the revision to the UFSAR are enclosed.

This revision contains those changes necessary to bring the UFSAR up-to-date as of January 1, 1986.

2.

To preclude recurrence, we will make future submittals of the Surry UFSAR to NRC as documents requiring receipt acknowledgement.

Consistent with that action, we request you sign and rettirn the attached acknowledgement form.

We apologize for any inconvenience caused by this oversight.

As a duly authorized officer of Virginia Electric and Power Company, I hereby certify as required by 10CFR50.71(e)(2) that the information given in the enclosed Revision 4 of the UFSAR accurately presents changes made since the B701120237

~

PDR 231 K

ADOCK o 000280 t i pA PDR IJ

~

previous submittal.

Revision 4 reflects previous information and analyses submitted to the Commission or prepared pursuant to Commission requirements.

Very truly yours,

bsA, e

W. L. Stewatt Enclosures cc:

Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. Chandu P. Patel NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing No. 2

=

W M