ML20207N638: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:V 3 | {{#Wiki_filter:V 3 | ||
NARRATIVE SU tNtY OF MCt m!LY 0. 6.33 EXPERIFNCE UNIT I SEPTENLER 1988 Sqterber 1 | NARRATIVE SU tNtY OF MCt m!LY 0. 6.33 EXPERIFNCE UNIT I SEPTENLER 1988 Sqterber 1 The Unit operated at a ncnimi value of 100% output. | ||
thruxf1 Septerter 3 Septatnr 4 | thruxf1 Septerter 3 Septatnr 4 At 0015, the Unit's outp2t was rodtxxd to 50% to load follcu. | ||
Septater 5 | Septater 5 The Unit zumined at 50%. | ||
September 6 | September 6 At 0500 hours, the Unit's outp2t was escalated to a nceimi value of 100% ctJtpat. | ||
Scotator 7 | Scotator 7 The Unit operated at a ro:timl value of 100% cutput. | ||
: t. M Septater 9 Septeter 10 | : t. M Septater 9 Septeter 10 At 0001 hours, the Unit's output was ratuccd to 50% to load folicw. | ||
Septeter 11 | Septeter 11 The Unit's outp2t rcrained at 50%. | ||
Septater 12 | Septater 12 At 0445 bcurs, the Unit's output was increasal to a ncrtiral value of 100% output. | ||
Septeter 13 | Septeter 13 The Unit cporattd at a ncnimi value ot' 100% cutput. | ||
th m #1 Septator 16 Septenbar 17 | th m #1 Septator 16 Septenbar 17 At 0002 hours, the Unit's cu+ pat has reduced tr. 50% to 1 cad follcu. | ||
Septeter 18 | Septeter 18 The Unit cporated at 50% cutp2t. | ||
September 19 | September 19 At 0430 hours, the Unit's cutput was increased to 100%. | ||
Septetor 20 | Septetor 20 The Unit operated at a ncnimi value of 100% cutput, th m rfi Septembct 23 Septater 24 At 002C lyun3, the Unit's cutput was ro+vwi to 50% for load follcuirg. | ||
Septcier 25 | Septcier 25 | ||
Septenber 26 | '1ho Unit cporated at 50% output. | ||
Scptember 27 | Septenber 26 At 0430 bcurs, the Unit's output was escalated to a ncnimi value of 100% outpat. | ||
thrurJh Septeter 30 hbf | Scptember 27 The Unit cperatad at a natimi value of 100% output. | ||
thrurJh Septeter 30 hbf b0bY | |||
' ', }# | |||
y e:v/ | |||
s | |||
LL OPERATING DATA REPORT DOCKET NO.: | LL OPERATING DATA REPORT DOCKET NO.: | ||
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 | 50 334 REPORT DATE: | ||
10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE: | |||
(412) 393 7621 OPERATING STATUS | |||
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes | |||
: 2. REPORTING PERIOD: dEPTEMBER 1988 | : 2. REPORTING PERIOD: dEPTEMBER 1988 | ||
: 3. LICENSED THERMAL POWER (MVt): | : 3. LICENSED THERMAL POWER (MVt): | ||
: 4. NAMEPLATE RATING (Gross MVe): | 2660 | ||
: 5. DESIGN ELECTRICAL RATING (Net MVe): | : 4. NAMEPLATE RATING (Gross MVe): | ||
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe): | 923 | ||
: 7. haX. DEPENDABLE CAPACITY (Net MVe): | : 5. DESIGN ELECTRICAL RATING (Net MVe): | ||
835 | |||
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe): | |||
860 | |||
: 7. haX. DEPENDABLE CAPACITY (Net MVe): | |||
810 | |||
: 8. 1F CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS: | : 8. 1F CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS: | ||
: 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net We): | : 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net We): | ||
: 10. REASONS FOR RESTKICTIONS. IF ANY: | None | ||
: 11. HOURS IN REPORTING PERIOD: | : 10. REASONS FOR RESTKICTIONS. IF ANY: | ||
: 12. NO. OF RRS. REACTOR WAS CRITICAL: | N/A THIS MONTH YEAR TO DATE CUMUIATIVE | ||
: 13. REACTOR RESERVE SKUTDOWN HOURS: | : 11. HOURS IN REPORTING PERIOD: | ||
: 14. HOURS GENERATOR WAS ON LINE: | 720.0 6575.0 108863.0 | ||
: 15. UNIT RESERVE SHUTDOWN HOURS: | : 12. NO. OF RRS. REACTOR WAS CRITICAL: | ||
: 16. CROSS THERMAL ENERGY GEN. (MVH): | 720.0 5053.1 64237.3 | ||
: 17. CROSS ELECT. ENERGY GEN. (MWH): | : 13. REACTOR RESERVE SKUTDOWN HOURS: | ||
: 18. NET ELECTRICAL ENERGY GEN. (MVH): | 0.0 0.0 4482.8 | ||
: 19. UNIT SERVICE FACTOR: (PERCENT) | : 14. HOURS GENERATOR WAS ON LINE: | ||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) | 720.0 4982.3 62636.5 | ||
: 21. UNIT CAPACITY FACTOR (HDC): PCT | : 15. UNIT RESERVE SHUTDOWN HOURS: | ||
: 22. UNIT CAPACITY FACTOR (DER): PCT | 0.0 0.0 0.0 | ||
: 16. CROSS THERMAL ENERGY GEN. (MVH): | |||
1615227.0 12441744.0 149359063.5 | |||
: 17. CROSS ELECT. ENERGY GEN. (MWH): | |||
518970.0 4024769.0 47S90489.0 | |||
: 18. NET ELECTRICAL ENERGY GEN. (MVH): | |||
485500,0 37/0677.0 4' | |||
6370.0 | |||
: 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 75.8 59.8 | |||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 75.8 59.8 | |||
: 21. UNIT CAPACITY FACTOR (HDC): PCT 83.2 70.8 53.9 | |||
: 22. UNIT CAPACITY FACTOR (DER): PCT 80.8 68.7 52.3 23 UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 2.4 18.5 24 SHUTDOVNS SCHEDULED OVER NEXT SIX MohTHS (TYPE,DATE,AND DURATION OF EACH): | |||
: 25. IF SHUT ECWN AT L.'iD OF REPCRT PERIOD, ESTIMATED DaTE OF STARTUP: | : 25. IF SHUT ECWN AT L.'iD OF REPCRT PERIOD, ESTIMATED DaTE OF STARTUP: | ||
: 26. UNITS IN TEST STATJS (PRIOR TO COMMERCIAL OPERATION): | : 26. UNITS IN TEST STATJS (PRIOR TO COMMERCIAL OPERATION): | ||
FORECAST | FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A | ||
UNil 5HUIDOWN5 AND F0WER REDUCTIONS | UNil 5HUIDOWN5 AND F0WER REDUCTIONS DUCKEi NO. | ||
UNII MAME | 50-314 UNII MAME avr5 usest #1 3DATE 10/10/85 REFOR T t00NIH September 1988 004rt E1Elt ey | ||
IER.EF990NE | _M.A. winger IER.EF990NE (412)-393-7621 "s. | ||
ca | ca w ** o O C. O Licensee e | ||
o Cause & Corrective No. | |||
Date 2 | |||
3UE Event | |||
!e o4 Action to R | |||
17 | ** D I | ||
18 | s.$ " | ||
19 | Report # | ||
20 | eE s$. | ||
n 1 | Prevent Recurrence H | ||
: t. Ogwesee.mst i . e Il spla 3 | sw | ||
* *a gu g | |||
a 17 880904 S | |||
0 H | |||
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following. | |||
18 880910 S | |||
O H | |||
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following. | |||
19 889017 5 | |||
0 H | |||
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for Ioad following. | |||
20 880924 S | |||
0 H | |||
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following. | |||
n 1 | |||
2 3 | |||
4 I I "=eJ Rra*=e se,e s,.g : | |||
3.Mes G. an semies.ms 5 Llerdis eJ A f.g.mpaise e y | |||
: l.,gl.pl,4,,3 s | |||
g _g | |||
, g g | |||
recy,,,e,=..e p,e, 3 he e e Tess 2-es at scram I seen Sawess som f a rm<c f Ref% | |||
3-A.te.eeic Scree 3 wee R<g*=e eI i R s I alc Nt tRI G I) E'F'el8'ae) Revoke ** | |||
4-Cent leased Freur Prewf ous 'losette UIC*I l I 8I wesene leelseeng A Isienesc I nasessaasiesse t | |||
5.g | |||
,,c g g I A h emene 9-Otteer 5 | |||
: t. Ogwesee.mst i. e Il spla 3 Isi 4.w I-Tsun.%= c t*'/ F FI 18 Helers iI igdsmi1 e | |||
AN ERAGE DAILV UNIT POWER LIVEL DOCKET NO. - 30"33' UNIT - 3??S 731: dl 10/1'0/88 DATE COMPLIMD SY M.A. Winger TILIPHONg (412) 393-7621 September 1988 gg DAY AVERACE DAILY POWER LIVEL DAY AVIRAGE DAILY POWER LIVEL IMWe, Net) | |||
(MW,. Net ) | |||
806 | 806 404 37 796 371 g | ||
gg 3 | |||
808 | 796 658 g, | ||
g2 | 4 417 788 3 | ||
5 375 21 | |||
_804 3 | |||
800 6 | |||
688 y | |||
813 790 3 | |||
8 808 408 3 | |||
9 813 388 3 | |||
10 388 688 3 | |||
375 799 gg 3 | |||
798 g2 671 3 | |||
788 795 g3 800 796 14 g | |||
33 808 N/A 3g 804 16 LMSTRUCTIONS On this forraat.!sst the netage dadv unit ;smer inei:n MWe. Net for each day in the rep.ating nk.nih. C.. nnute vis the nearett whO mepwatt. | |||
(13 ( 7 7 ) | (13 ( 7 7 ) | ||
L | L D | ||
NARRATIVE SGMARY OF | |||
)CtmEX OEERATING EXPERIINCE UNIT II SEPIEMBER 1988 1 | |||
The Unit operated at a ncainal value of 100% output. | |||
Seg#anhar 19 Seltsehar 20 At 0306 laars, the Unit inadvertently tripped on 2 out of 3 OP aT aignals while perfornirq an operating surveillance test on the Unit's power range rua. lear instnmentaticn. At 1950 hours, the Unit was taken critical. | Seg#anhar 19 Seltsehar 20 At 0306 laars, the Unit inadvertently tripped on 2 out of 3 OP aT aignals while perfornirq an operating surveillance test on the Unit's power range rua. lear instnmentaticn. At 1950 hours, the Unit was taken critical. | ||
Septerter 21 At 0513 hours, the Unit was synchronized and output was escalated to a ncninal value of 100) cxat;xat. | Septerter 21 At 0513 hours, the Unit was synchronized and output was escalated to a ncninal value of 100) cxat;xat. | ||
amhar 22 The Unit operatal at a ncutinal value of 100% output. | amhar 22 The Unit operatal at a ncutinal value of 100% output. | ||
Seg#anhar 29 Seg$amhar 30 At 2200 hours, the Unit's cutpt?. was reduced to 15% to | Seg#anhar 29 Seg$amhar 30 At 2200 hours, the Unit's cutpt?. was reduced to 15% to | ||
%' watertex of the Unit's main condeneer. repairs to the condeneer tube cleaning t | |||
B L | |||
AVERACE DAILY UNIT 70wta LEYtt J | |||
l | l DOCKET NO. | ||
DOCKET NO. | 50-412 UNly bVPS Unit 2 10/10/88 g47g COMPLETED SY M.A. Winner TTLIPHONg (412) 393-7621 t | ||
COMPLETED SY | |||
1 i | 1 i | ||
September 1988 g | |||
DAY AVERACE DAILY power LIVIL DAY AVERACE DAILY power LIvtL tMWe, Net s i M h Nets 777 798 l | |||
769 | gy 1 | ||
769 gg | |||
],98 781 790 3 | |||
g, 781 | |||
786 | , 75 a | ||
l | 4 g | ||
790 375 g | |||
I y | 11 4 | ||
4 790 798 m | |||
LNSTRL'CTIONS on this formal.!st the acrap saily unie ',mer sset :n Ntwe.Nei far each day in the revueting its.atn. i'...nnuie | 7 744 y | ||
thG Seafell *hN ffWpwall. | 794 3 | ||
i I | 785 4 | ||
798 786 798 l | |||
9 18 l | |||
781 802 le 3 | |||
l gg g | |||
786 798 790 798 g; | |||
g 19s 79. | |||
,3 I | |||
778 y | |||
807 3g 802 N/A gg g | |||
802 le i | |||
LNSTRL'CTIONS on this formal.!st the acrap saily unie ',mer sset :n Ntwe.Nei far each day in the revueting its.atn. i'...nnuie eu thG Seafell *hN ffWpwall. | |||
i i | |||
I j | |||
44f77) i i | |||
l l | l l | ||
F | F | ||
~ | |||
UNII SHtJIDOWN$ AND FOWER REEMET10NS | i I | ||
REPORTA00NIN September 1988 | UNII SHtJIDOWN$ AND FOWER REEMET10NS DOCRE T NO. 50-412 UNIT NAmet avPs ts-It 2 DATE 10/10/88 REPORTA00NIN September 1988 CORWLETEle gy M.A. Winzer its.treecesE (412 )-393-76ZT | ||
.s le em as o o, l "g | |||
Ct Licensee Csuse & Corrective 0 | |||
18 | No. | ||
instrumentation. | Date E | ||
19 | 3%I Ev'ent S$ | ||
20 | Actton to R | ||
I | $5 3 | ||
f$" | |||
: f. figwease. isi I se.w Il ar Imul | Report # | ||
Isbsene1 Ssner %.eu.< | .I s$ | ||
l'8/ F F) | Prevent Recurrence H | ||
a u | |||
ym CU 0 | |||
a 18 880920 F | |||
26.1 C | |||
3 88-13 IA INSTRU | |||
. Unit inadvertently tripped on 2 out of 3 OPAT Signals, while performing an l | |||
operating eurveillance test on the 9 | |||
Unit's power range nuclear instrumentation. | |||
19 880921 F | |||
0 H | |||
5 N/A ZZ ZZZZZZ Power rampup after Unit shutdown. | |||
20 880930 S | |||
0 B | |||
5 N/A IIF HTEXCII Unit's output reduced to 757. to permit repairs to the condenser tube cleaning system for the | |||
'B' waterbox of the Unit's main condenser. | |||
I 2 | |||
3,,,, g,.4 : | |||
4 l~ | |||
f wieJ Reas. | |||
: 1. sluties C - Inde== !6.=es 5 5. hrJu8eJ A f.g ep r.: reel.,eg1,gd,6 I g _,,,,,,, g g., r,cya,,,,m,..e Ipm3 3 u%,.., g,,8 2-seam eI serem I aseg sheces s. I a rence C Refe.cli"E 3-herm etc Scree I '<=e It.3%.s e I I It 4 I eBr t Ni titl 6 | |||
*) Repdaew) Stessekseen 4-Centtes-d Fres'Prewto=* feenth hit.Il I tlyrsae.= Isaisieng A I sicase i ssesammi en 5-se csiess e | |||
I Ad"*"esses" 9-Other 5 | |||
: f. figwease. isi I se.w Il ar Imul Isbsene1 Ssner %.eu.< | |||
l'8/ F F) | |||
It Ospice il 3g.14 ) | |||
e | e | ||
\ | \\ | ||
OPERATING DATA REPORT DOCKET NO : | OPERATING DATA REPORT DOCKET NO : | ||
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 | 50 412 REPORT DATE: | ||
10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE: | |||
(412) 393 7621 OPERATING STATUS | |||
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes | |||
: 2. REPORTING PERIOD: SEPTEMBER 1988 | : 2. REPORTING PERIOD: SEPTEMBER 1988 | ||
: 3. LICENSED THERMAL POWER (MVt): | : 3. LICENSED THERMAL POWER (MVt): | ||
: 4. NAMEPLATE RATING (Gross MVe): | 2660 | ||
: 5. DESIGN ELECTRICAL RATING (Net MWe): | : 4. NAMEPLATE RATING (Gross MVe): | ||
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe): | 523 | ||
: 7. MAX. DEPENDABLE CAPACITY (Net MVe): | : 5. DESIGN ELECTRICAL RATING (Net MWe): | ||
836 | |||
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe): | |||
885 | |||
: 7. MAX. DEPENDABLE CAPACITY (Net MVe): | |||
833 | |||
: 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS: | : 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS: | ||
: 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe): | : 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe): | ||
: 10. REASONS FOR RESTRICTIONS. IF ANY: | None | ||
: 11. HOURS IN REPORTING PERIOD: | : 10. REASONS FOR RESTRICTIONS. IF ANY: | ||
: 12. NO. OF HRS. REACTOR VAS CRITICAL: | N/A THIS MONTH YEAR TO DATE CUMULATIVE | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS: | : 11. HOURS IN REPORTING PERIOD: | ||
: 14. HOURS GENERATOR VAS ON LINE: | 720.0 6575.0 7646.0 | ||
: 15. UNIT REFERVE SHUTDOWN HOURS: | : 12. NO. OF HRS. REACTOR VAS CRITICAL: | ||
: 16. CROSS THERMAL ENERGY GEN. (MWH): | 703.3 6074.8 7040.3 | ||
: 17. CROSS ELECT. ENERGY GEN. (MVH): | : 13. REACTOR RESERVE SHUTDOWN HOURS: | ||
: 18. NET ELECTRICAL ENERGY GEN. (MVH): | 0.0 0.0 0.0 | ||
: 19. UNIT SERVICE FACTOR: (PERCENT) | : 14. HOURS GENERATOR VAS ON LINE: | ||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) | 693.9 6020.5 6970.3 | ||
: 21. UNIT CAPACITY FACTOR (KDC): PCT | : 15. UNIT REFERVE SHUTDOWN HOURS: | ||
: 22. UNIT CAPACITY FACTOR (DER): PCT | 0.0 0.0 0.0 | ||
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) | : 16. CROSS THERMAL ENERGY GEN. (MWH): | ||
1802754.0 15598760.0 17984397.4 | |||
: 17. CROSS ELECT. ENERGY GEN. (MVH): | |||
573600.0 5007300.0 5789500.0 | |||
: 18. NET ELECTRICAL ENERGY GEN. (MVH): | |||
542536.0 4732807.0 5470911.0 | |||
: 19. UNIT SERVICE FACTOR: (PERCENT) 96.4 91.6 91.2 | |||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) 96.4 91.6 91.2 | |||
: 21. UNIT CAPACITY FACTOR (KDC): PCT 90.5 86.4 85.9 | |||
: 22. UNIT CAPACITY FACTOR (DER): PCT 90.1 86.1 85 6 | |||
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) 3.6 3.3 4.5 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE. AND DURATION OF EACH): | : 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE. AND DURATION OF EACH): | ||
UNIT IS SCHEDUtrn FOR FIRST REFUELING OUTAGE BEGINNING MARCH 17.1989 TO HAY 26.1989 | UNIT IS SCHEDUtrn FOR FIRST REFUELING OUTAGE BEGINNING MARCH 17.1989 TO HAY 26.1989 | ||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | : 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | ||
FORECAST | FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A L | ||
/' | |||
'Af DuquesneUEht 1.,. so,. m m l | |||
Nucket Group P.O. Don 4 October 10, 1988 Shippingport, PA IM77 0004 1 | |||
Nucket Group | |||
Shippingport, PA IM77 0004 1 | |||
Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. D m-66 Unit 2 - Docket No. 50 412, License No. NPF-73 Monthly Ooeratim Reoort 1 | Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. D m-66 Unit 2 - Docket No. 50 412, License No. NPF-73 Monthly Ooeratim Reoort 1 | ||
I. | I. | ||
l U. S. Nuclear Regulatory Comuission | l U. S. Nuclear Regulatory Comuission Document Control Desk 1 | ||
Document Control Desk Washington, D.C. 20555 ij | Washington, D.C. | ||
In accordance with | 20555 ij Gentlanen: | ||
Operating Report is subnit | In accordance with ix A Technical Specifications, the Monthly Operating Report is subnit for Unkt 1 ard Unit 2 for the month of September, i | ||
1988. | |||
t i | t i | ||
1 | 1 Very truly yours, i | ||
4 0 | 4 0 | ||
( | ( | ||
dl., | |||
. D. Sieber Nice President Nuclear GruIp l | |||
Imd Enclosures l | |||
ocs NRC Rajional Office KilvJ of Prussia, PA i | |||
l I | l I | ||
i | i | ||
,I L_}} | |||
Latest revision as of 20:10, 6 December 2024
| ML20207N638 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 09/30/1988 |
| From: | Sieber J, Winger M DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8810190269 | |
| Download: ML20207N638 (9) | |
Text
V 3
NARRATIVE SU tNtY OF MCt m!LY 0. 6.33 EXPERIFNCE UNIT I SEPTENLER 1988 Sqterber 1 The Unit operated at a ncnimi value of 100% output.
thruxf1 Septerter 3 Septatnr 4 At 0015, the Unit's outp2t was rodtxxd to 50% to load follcu.
Septater 5 The Unit zumined at 50%.
September 6 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, the Unit's outp2t was escalated to a nceimi value of 100% ctJtpat.
Scotator 7 The Unit operated at a ro:timl value of 100% cutput.
- t. M Septater 9 Septeter 10 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the Unit's output was ratuccd to 50% to load folicw.
Septeter 11 The Unit's outp2t rcrained at 50%.
Septater 12 At 0445 bcurs, the Unit's output was increasal to a ncrtiral value of 100% output.
Septeter 13 The Unit cporattd at a ncnimi value ot' 100% cutput.
th m #1 Septator 16 Septenbar 17 At 0002 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, the Unit's cu+ pat has reduced tr. 50% to 1 cad follcu.
Septeter 18 The Unit cporated at 50% cutp2t.
September 19 At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />, the Unit's cutput was increased to 100%.
Septetor 20 The Unit operated at a ncnimi value of 100% cutput, th m rfi Septembct 23 Septater 24 At 002C lyun3, the Unit's cutput was ro+vwi to 50% for load follcuirg.
Septcier 25
'1ho Unit cporated at 50% output.
Septenber 26 At 0430 bcurs, the Unit's output was escalated to a ncnimi value of 100% outpat.
Scptember 27 The Unit cperatad at a natimi value of 100% output.
thrurJh Septeter 30 hbf b0bY
' ', }#
y e:v/
s
LL OPERATING DATA REPORT DOCKET NO.:
50 334 REPORT DATE:
10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE:
(412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: dEPTEMBER 1988
- 3. LICENSED THERMAL POWER (MVt):
2660
- 4. NAMEPLATE RATING (Gross MVe):
923
- 5. DESIGN ELECTRICAL RATING (Net MVe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. haX. DEPENDABLE CAPACITY (Net MVe):
810
- 8. 1F CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net We):
None
- 10. REASONS FOR RESTKICTIONS. IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 6575.0 108863.0
- 12. NO. OF RRS. REACTOR WAS CRITICAL:
720.0 5053.1 64237.3
- 13. REACTOR RESERVE SKUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
720.0 4982.3 62636.5
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MVH):
1615227.0 12441744.0 149359063.5
- 17. CROSS ELECT. ENERGY GEN. (MWH):
518970.0 4024769.0 47S90489.0
- 18. NET ELECTRICAL ENERGY GEN. (MVH):
485500,0 37/0677.0 4'
6370.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 75.8 59.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 75.8 59.8
- 21. UNIT CAPACITY FACTOR (HDC): PCT 83.2 70.8 53.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 80.8 68.7 52.3 23 UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 2.4 18.5 24 SHUTDOVNS SCHEDULED OVER NEXT SIX MohTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT ECWN AT L.'iD OF REPCRT PERIOD, ESTIMATED DaTE OF STARTUP:
- 26. UNITS IN TEST STATJS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
UNil 5HUIDOWN5 AND F0WER REDUCTIONS DUCKEi NO.
50-314 UNII MAME avr5 usest #1 3DATE 10/10/85 REFOR T t00NIH September 1988 004rt E1Elt ey
_M.A. winger IER.EF990NE (412)-393-7621 "s.
ca w ** o O C. O Licensee e
o Cause & Corrective No.
Date 2
3UE Event
!e o4 Action to R
- D I
s.$ "
Report #
eE s$.
Prevent Recurrence H
sw
- *a gu g
a 17 880904 S
0 H
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.
18 880910 S
O H
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.
19 889017 5
0 H
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for Ioad following.
20 880924 S
0 H
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.
n 1
2 3
4 I I "=eJ Rra*=e se,e s,.g :
3.Mes G. an semies.ms 5 Llerdis eJ A f.g.mpaise e y
- l.,gl.pl,4,,3 s
g _g
, g g
recy,,,e,=..e p,e, 3 he e e Tess 2-es at scram I seen Sawess som f a rm<c f Ref%
3-A.te.eeic Scree 3 wee R<g*=e eI i R s I alc Nt tRI G I) E'F'el8'ae) Revoke **
4-Cent leased Freur Prewf ous 'losette UIC*I l I 8I wesene leelseeng A Isienesc I nasessaasiesse t
5.g
,,c g g I A h emene 9-Otteer 5
- t. Ogwesee.mst i. e Il spla 3 Isi 4.w I-Tsun.%= c t*'/ F FI 18 Helers iI igdsmi1 e
AN ERAGE DAILV UNIT POWER LIVEL DOCKET NO. - 30"33' UNIT - 3??S 731: dl 10/1'0/88 DATE COMPLIMD SY M.A. Winger TILIPHONg (412) 393-7621 September 1988 gg DAY AVERACE DAILY POWER LIVEL DAY AVIRAGE DAILY POWER LIVEL IMWe, Net)
(MW,. Net )
806 404 37 796 371 g
gg 3
796 658 g,
4 417 788 3
5 375 21
_804 3
800 6
688 y
813 790 3
8 808 408 3
9 813 388 3
10 388 688 3
375 799 gg 3
798 g2 671 3
788 795 g3 800 796 14 g
33 808 N/A 3g 804 16 LMSTRUCTIONS On this forraat.!sst the netage dadv unit ;smer inei:n MWe. Net for each day in the rep.ating nk.nih. C.. nnute vis the nearett whO mepwatt.
(13 ( 7 7 )
L D
NARRATIVE SGMARY OF
)CtmEX OEERATING EXPERIINCE UNIT II SEPIEMBER 1988 1
The Unit operated at a ncainal value of 100% output.
Seg#anhar 19 Seltsehar 20 At 0306 laars, the Unit inadvertently tripped on 2 out of 3 OP aT aignals while perfornirq an operating surveillance test on the Unit's power range rua. lear instnmentaticn. At 1950 hours0.0226 days <br />0.542 hours <br />0.00322 weeks <br />7.41975e-4 months <br />, the Unit was taken critical.
Septerter 21 At 0513 hours0.00594 days <br />0.143 hours <br />8.482143e-4 weeks <br />1.951965e-4 months <br />, the Unit was synchronized and output was escalated to a ncninal value of 100) cxat;xat.
amhar 22 The Unit operatal at a ncutinal value of 100% output.
Seg#anhar 29 Seg$amhar 30 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, the Unit's cutpt?. was reduced to 15% to
%' watertex of the Unit's main condeneer. repairs to the condeneer tube cleaning t
B L
AVERACE DAILY UNIT 70wta LEYtt J
l DOCKET NO.
50-412 UNly bVPS Unit 2 10/10/88 g47g COMPLETED SY M.A. Winner TTLIPHONg (412) 393-7621 t
1 i
September 1988 g
DAY AVERACE DAILY power LIVIL DAY AVERACE DAILY power LIvtL tMWe, Net s i M h Nets 777 798 l
gy 1
769 gg
],98 781 790 3
g, 781
, 75 a
4 g
790 375 g
11 4
4 790 798 m
7 744 y
794 3
785 4
798 786 798 l
9 18 l
781 802 le 3
l gg g
786 798 790 798 g;
g 19s 79.
,3 I
778 y
807 3g 802 N/A gg g
802 le i
LNSTRL'CTIONS on this formal.!st the acrap saily unie ',mer sset :n Ntwe.Nei far each day in the revueting its.atn. i'...nnuie eu thG Seafell *hN ffWpwall.
i i
I j
44f77) i i
l l
F
~
i I
UNII SHtJIDOWN$ AND FOWER REEMET10NS DOCRE T NO. 50-412 UNIT NAmet avPs ts-It 2 DATE 10/10/88 REPORTA00NIN September 1988 CORWLETEle gy M.A. Winzer its.treecesE (412 )-393-76ZT
.s le em as o o, l "g
Ct Licensee Csuse & Corrective 0
No.
Date E
3%I Ev'ent S$
Actton to R
$5 3
f$"
Report #
.I s$
Prevent Recurrence H
a u
ym CU 0
a 18 880920 F
26.1 C
3 88-13 IA INSTRU
. Unit inadvertently tripped on 2 out of 3 OPAT Signals, while performing an l
operating eurveillance test on the 9
Unit's power range nuclear instrumentation.
19 880921 F
0 H
5 N/A ZZ ZZZZZZ Power rampup after Unit shutdown.
20 880930 S
0 B
5 N/A IIF HTEXCII Unit's output reduced to 757. to permit repairs to the condenser tube cleaning system for the
'B' waterbox of the Unit's main condenser.
I 2
3,,,, g,.4 :
4 l~
f wieJ Reas.
- 1. sluties C - Inde== !6.=es 5 5. hrJu8eJ A f.g ep r.: reel.,eg1,gd,6 I g _,,,,,,, g g., r,cya,,,,m,..e Ipm3 3 u%,.., g,,8 2-seam eI serem I aseg sheces s. I a rence C Refe.cli"E 3-herm etc Scree I '<=e It.3%.s e I I It 4 I eBr t Ni titl 6
- ) Repdaew) Stessekseen 4-Centtes-d Fres'Prewto=* feenth hit.Il I tlyrsae.= Isaisieng A I sicase i ssesammi en 5-se csiess e
I Ad"*"esses" 9-Other 5
- f. figwease. isi I se.w Il ar Imul Isbsene1 Ssner %.eu.<
l'8/ F F)
It Ospice il 3g.14 )
e
\\
OPERATING DATA REPORT DOCKET NO :
50 412 REPORT DATE:
10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE:
(412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: SEPTEMBER 1988
- 3. LICENSED THERMAL POWER (MVt):
2660
- 4. NAMEPLATE RATING (Gross MVe):
523
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
- 7. MAX. DEPENDABLE CAPACITY (Net MVe):
833
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS. IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 6575.0 7646.0
- 12. NO. OF HRS. REACTOR VAS CRITICAL:
703.3 6074.8 7040.3
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR VAS ON LINE:
693.9 6020.5 6970.3
- 15. UNIT REFERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MWH):
1802754.0 15598760.0 17984397.4
- 17. CROSS ELECT. ENERGY GEN. (MVH):
573600.0 5007300.0 5789500.0
- 18. NET ELECTRICAL ENERGY GEN. (MVH):
542536.0 4732807.0 5470911.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 96.4 91.6 91.2
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 96.4 91.6 91.2
- 21. UNIT CAPACITY FACTOR (KDC): PCT 90.5 86.4 85.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 90.1 86.1 85 6
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 3.6 3.3 4.5
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE. AND DURATION OF EACH):
UNIT IS SCHEDUtrn FOR FIRST REFUELING OUTAGE BEGINNING MARCH 17.1989 TO HAY 26.1989
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A L
/'
'Af DuquesneUEht 1.,. so,. m m l
Nucket Group P.O. Don 4 October 10, 1988 Shippingport, PA IM77 0004 1
Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. D m-66 Unit 2 - Docket No. 50 412, License No. NPF-73 Monthly Ooeratim Reoort 1
I.
l U. S. Nuclear Regulatory Comuission Document Control Desk 1
Washington, D.C.
20555 ij Gentlanen:
In accordance with ix A Technical Specifications, the Monthly Operating Report is subnit for Unkt 1 ard Unit 2 for the month of September, i
1988.
t i
1 Very truly yours, i
4 0
(
dl.,
. D. Sieber Nice President Nuclear GruIp l
Imd Enclosures l
ocs NRC Rajional Office KilvJ of Prussia, PA i
l I
i
,I L_