NARRATIVE SU tNtY OF MCt m!LY 0. 6.33 EXPERIFNCE UNIT I SEPTENLER 1988 Sqterber 1     The Unit operated at a ncnimi value of 100% output.
NARRATIVE SU tNtY OF MCt m!LY 0. 6.33 EXPERIFNCE UNIT I SEPTENLER 1988 Sqterber 1 The Unit operated at a ncnimi value of 100% output.
thruxf1 Septerter 3 Septatnr 4     At 0015, the Unit's outp2t was rodtxxd to 50% to load follcu.
thruxf1 Septerter 3 Septatnr 4 At 0015, the Unit's outp2t was rodtxxd to 50% to load follcu.
Septater 5     The Unit zumined at 50%.
Septater 5 The Unit zumined at 50%.
September 6     At 0500 hours, the Unit's outp2t was escalated to a nceimi value of 100% ctJtpat.
September 6 At 0500 hours, the Unit's outp2t was escalated to a nceimi value of 100% ctJtpat.
Scotator 7     The Unit operated at a ro:timl value of 100% cutput.
Scotator 7 The Unit operated at a ro:timl value of 100% cutput.
: t. M Septater 9 Septeter 10   At 0001 hours, the Unit's output was ratuccd to 50% to load folicw.
: t. M Septater 9 Septeter 10 At 0001 hours, the Unit's output was ratuccd to 50% to load folicw.
Septeter 11     The Unit's outp2t rcrained at 50%.
Septeter 11 The Unit's outp2t rcrained at 50%.
Septater 12   At 0445 bcurs, the Unit's output was increasal to a ncrtiral value of 100% output.
Septater 12 At 0445 bcurs, the Unit's output was increasal to a ncrtiral value of 100% output.
Septeter 13     The Unit cporattd at a ncnimi value ot' 100% cutput.
Septeter 13 The Unit cporattd at a ncnimi value ot' 100% cutput.
th m #1 Septator 16 Septenbar 17   At 0002 hours, the Unit's cu+ pat has reduced tr. 50% to 1 cad follcu.
th m #1 Septator 16 Septenbar 17 At 0002 hours, the Unit's cu+ pat has reduced tr. 50% to 1 cad follcu.
Septeter 18   The Unit cporated at 50% cutp2t.
Septeter 18 The Unit cporated at 50% cutp2t.
September 19   At 0430 hours, the Unit's cutput was increased to 100%.
September 19 At 0430 hours, the Unit's cutput was increased to 100%.
Septetor 20   The Unit operated at a ncnimi value of 100% cutput, th m rfi Septembct 23 Septater 24   At 002C lyun3, the Unit's cutput was ro+vwi to 50% for load follcuirg.
Septetor 20 The Unit operated at a ncnimi value of 100% cutput, th m rfi Septembct 23 Septater 24 At 002C lyun3, the Unit's cutput was ro+vwi to 50% for load follcuirg.
Septcier 25   '1ho Unit cporated at 50% output.
Septcier 25
Septenber 26   At 0430 bcurs, the Unit's output was escalated to a ncnimi value of 100% outpat.
'1ho Unit cporated at 50% output.
Scptember 27   The Unit cperatad at a natimi value of 100% output.
Septenber 26 At 0430 bcurs, the Unit's output was escalated to a ncnimi value of 100% outpat.
thrurJh Septeter 30 hbf   b0bY ' ' , }#
Scptember 27 The Unit cperatad at a natimi value of 100% output.
s y e:v/ -
thrurJh Septeter 30 hbf b0bY
' ', }#
y e:v/
s


LL OPERATING DATA REPORT DOCKET NO.:     50 334 REPORT DATE:   10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE:     (412) 393 7621 OPERATING STATUS
LL OPERATING DATA REPORT DOCKET NO.:
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1         Notes
50 334 REPORT DATE:
10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE:
(412) 393 7621 OPERATING STATUS
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
: 2. REPORTING PERIOD: dEPTEMBER 1988
: 2. REPORTING PERIOD: dEPTEMBER 1988
: 3. LICENSED THERMAL POWER (MVt):               2660
: 3. LICENSED THERMAL POWER (MVt):
: 4. NAMEPLATE RATING (Gross MVe):                 923
2660
: 5. DESIGN ELECTRICAL RATING (Net MVe):           835
: 4. NAMEPLATE RATING (Gross MVe):
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe):         860
923
: 7. haX. DEPENDABLE CAPACITY (Net MVe):           810
: 5. DESIGN ELECTRICAL RATING (Net MVe):
835
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
: 7. haX. DEPENDABLE CAPACITY (Net MVe):
810
: 8. 1F CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
: 8. 1F CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net We):               None
: 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net We):
: 10. REASONS FOR RESTKICTIONS. IF ANY:                               N/A THIS MONTH     YEAR TO DATE       CUMUIATIVE
None
: 11. HOURS IN REPORTING PERIOD:                     720.0           6575.0         108863.0
: 10. REASONS FOR RESTKICTIONS. IF ANY:
: 12. NO. OF RRS. REACTOR WAS CRITICAL:               720.0           5053.1           64237.3
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
: 13. REACTOR RESERVE SKUTDOWN HOURS:                   0.0             0.0           4482.8
: 11. HOURS IN REPORTING PERIOD:
: 14. HOURS GENERATOR WAS ON LINE:                   720.0           4982.3           62636.5
720.0 6575.0 108863.0
: 15. UNIT RESERVE SHUTDOWN HOURS:                     0.0             0.0               0.0
: 12. NO. OF RRS. REACTOR WAS CRITICAL:
: 16. CROSS THERMAL ENERGY GEN. (MVH):           1615227.0       12441744.0       149359063.5
720.0 5053.1 64237.3
: 17. CROSS ELECT. ENERGY GEN. (MWH):             518970.0       4024769.0       47S90489.0
: 13. REACTOR RESERVE SKUTDOWN HOURS:
: 18. NET ELECTRICAL ENERGY GEN. (MVH):           485500,0       37/0677.0       4'   6370.0
0.0 0.0 4482.8
: 19. UNIT SERVICE FACTOR: (PERCENT)                 100.0             75.8             59.8
: 14. HOURS GENERATOR WAS ON LINE:
: 20. UNIT AVAILABILITY FACTOR:(PERCENT)             100.0             75.8             59.8
720.0 4982.3 62636.5
: 21. UNIT CAPACITY FACTOR (HDC): PCT                 83.2             70.8             53.9
: 15. UNIT RESERVE SHUTDOWN HOURS:
: 22. UNIT CAPACITY FACTOR (DER): PCT                 80.8             68.7             52.3 23 UNIT FORCED OUTAGE RATE: (PERCENT)                 0.0             2.4             18.5 24 SHUTDOVNS SCHEDULED OVER NEXT SIX MohTHS (TYPE,DATE,AND DURATION OF EACH):
0.0 0.0 0.0
: 16. CROSS THERMAL ENERGY GEN. (MVH):
1615227.0 12441744.0 149359063.5
: 17. CROSS ELECT. ENERGY GEN. (MWH):
518970.0 4024769.0 47S90489.0
: 18. NET ELECTRICAL ENERGY GEN. (MVH):
485500,0 37/0677.0 4'
6370.0
: 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 75.8 59.8
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 75.8 59.8
: 21. UNIT CAPACITY FACTOR (HDC): PCT 83.2 70.8 53.9
: 22. UNIT CAPACITY FACTOR (DER): PCT 80.8 68.7 52.3 23 UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 2.4 18.5 24 SHUTDOVNS SCHEDULED OVER NEXT SIX MohTHS (TYPE,DATE,AND DURATION OF EACH):
: 25. IF SHUT ECWN AT L.'iD OF REPCRT PERIOD, ESTIMATED DaTE OF STARTUP:
: 25. IF SHUT ECWN AT L.'iD OF REPCRT PERIOD, ESTIMATED DaTE OF STARTUP:
: 26. UNITS IN TEST STATJS (PRIOR TO COMMERCIAL OPERATION):
: 26. UNITS IN TEST STATJS (PRIOR TO COMMERCIAL OPERATION):
FORECAST       ACHIEVED INITIAL CRITICALITY                   N/A           N/A INITIAL ELECTRICITY                   N/A           N/A COMMERCIAL OPERATION                 N/A           N/A
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A


UNil 5HUIDOWN5 AND F0WER REDUCTIONS                                 DUCKEi NO.         50-314           .- .
UNil 5HUIDOWN5 AND F0WER REDUCTIONS DUCKEi NO.
UNII MAME       avr5 usest #1 3DATE     10/10/85 REFOR T t00NIH September 1988                             004rt E1Elt ey     _M.A. winger         -
50-314 UNII MAME avr5 usest #1 3DATE 10/10/85 REFOR T t00NIH September 1988 004rt E1Elt ey
IER.EF990NE       (412)-393-7621 "s.
_M.A. winger IER.EF990NE (412)-393-7621 "s.
ca                       w ** o                                         "
ca w ** o O C. O Licensee e
                                          * *            **        O                                             "*
o Cause & Corrective No.
e          C. O Licensee                       o                     Cause & Corrective No.         Date     %        %$                      3UE 2                        Event               !e     o4 Action to R
Date 2
H
3UE Event
                                          ** D s$ .                I     s* .$   " Report #                     eE                       Prevent Recurrence sw         *a gu     g a
!e o4 Action to R
17       880904       S       0               H         5                 N/A               ZZ       ZZZZZZ   Unit's output was reduced to 50% for load following.
** D I
18       880910       S         O               H         5                 N/A               ZZ       ZZZZZZ   Unit's output was reduced to 50% for load following.
s.$ "
19       889017       5       0                 H         5                 N/A               ZZ       ZZZZZZ   Unit's output was reduced to 50% for Ioad following.
Report #
20       880924       S       0                 H         5                 N/A               ZZ       ZZZZZZ Unit's output was reduced to 50% for load following.
eE s$.
n 1                     2 I I "=eJ             Rra*=e                                                     3                                          4 se,e s,.g :                                 3.Mes G. an semies.ms 5 Llerdis seJ        A f.g.mpaise e y       l. ,gl .pl,4,,3                       g _g       ,g                             g   recy,,,e,= ..e p,e, 3 he e e Tess                                                 2-es       at scram                         I seen Sawess som f a rm<c f Ref%                                                       3-A.te.eeic Scree                           3 wee R<g*=e eI i R s I alc Nt tRI G I) E'F'el8'ae) Revoke **                                     4-Cent leased Freur Prewf ous 'losette     UIC*I l I 8I wesene t    leelseeng A Isienesc I nasessaasiesse             5.g     ,,c g g I A h emene                                                   9-Otteer                               5
Prevent Recurrence H
: t. Ogwesee.mst i . e Il spla 3                                                                           Isi 4.w I-Tsun.%= c t*'/ F FI                 18 Helers iI igdsmi1 e
sw
* *a gu g
a 17 880904 S
0 H
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.
18 880910 S
O H
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.
19 889017 5
0 H
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for Ioad following.
20 880924 S
0 H
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.
n 1
2 3
4 I I "=eJ Rra*=e se,e s,.g :
3.Mes G. an semies.ms 5 Llerdis eJ A f.g.mpaise e y
: l.,gl.pl,4,,3 s
g _g
, g g
recy,,,e,=..e p,e, 3 he e e Tess 2-es at scram I seen Sawess som f a rm<c f Ref%
3-A.te.eeic Scree 3 wee R<g*=e eI i R s I alc Nt tRI G I) E'F'el8'ae) Revoke **
4-Cent leased Freur Prewf ous 'losette UIC*I l I 8I wesene leelseeng A Isienesc I nasessaasiesse t
5.g
,,c g g I A h emene 9-Otteer 5
: t. Ogwesee.mst i. e Il spla 3 Isi 4.w I-Tsun.%= c t*'/ F FI 18 Helers iI igdsmi1 e


    ,        .                                      AN ERAGE DAILV UNIT POWER LIVEL DOCKET NO. - 30"33' UNIT - 3??S 731: dl             .
AN ERAGE DAILV UNIT POWER LIVEL DOCKET NO. - 30"33' UNIT - 3??S 731: dl 10/1'0/88 DATE COMPLIMD SY M.A. Winger TILIPHONg (412) 393-7621 September 1988 gg DAY AVERACE DAILY POWER LIVEL DAY AVIRAGE DAILY POWER LIVEL IMWe, Net)
DATE      10/1'0/88 COMPLIMD SY         M.A. Winger TILIPHONg         (412) 393-7621 gg            September 1988 DAY       AVERACE DAILY POWER LIVEL                         DAY         AVIRAGE DAILY POWER LIVEL IMWe, Net)                                                 (MW,. Net )
(MW,. Net )
806                                                         404 37       ,
806 404 37 796 371 g
g                      796                                  gg                     371 3                     796                                 g,                     658 4                     417                                 3                     788 5                     375                                 21                   _804 6                     688               ,                3                      800 y                     813                                                         790 3
gg 3
808                                                         408 8                                                          3 813                                                         388 9                                                          3 10                       388 3                       688 gg                      375                                                         799 3       _
796 658 g,
g2                       671                                 3                       798 g3                        788                                                         795 14 800                                g                       796 33                       808                                 3g                      N/A 804 16 LMSTRUCTIONS On this forraat.!sst the netage dadv unit ;smer inei:n MWe. Net for each day in the rep.ating nk.nih. C.. nnute vis the nearett whO mepwatt.
4 417 788 3
5 375 21
_804 3
800 6
688 y
813 790 3
8 808 408 3
9 813 388 3
10 388 688 3
375 799 gg 3
798 g2 671 3
788 795 g3 800 796 14 g
33 808 N/A 3g 804 16 LMSTRUCTIONS On this forraat.!sst the netage dadv unit ;smer inei:n MWe. Net for each day in the rep.ating nk.nih. C.. nnute vis the nearett whO mepwatt.
(13 ( 7 7 )
(13 ( 7 7 )
L                                                                                           D
L D


                      .          .                      NARRATIVE SGMARY OF
NARRATIVE SGMARY OF
                                                      )CtmEX OEERATING EXPERIINCE UNIT II SEPIEMBER 1988 1 The Unit operated at a ncainal value of 100% output.
)CtmEX OEERATING EXPERIINCE UNIT II SEPIEMBER 1988 1
The Unit operated at a ncainal value of 100% output.
Seg#anhar 19 Seltsehar 20 At 0306 laars, the Unit inadvertently tripped on 2 out of 3 OP aT aignals while perfornirq an operating surveillance test on the Unit's power range rua. lear instnmentaticn. At 1950 hours, the Unit was taken critical.
Seg#anhar 19 Seltsehar 20 At 0306 laars, the Unit inadvertently tripped on 2 out of 3 OP aT aignals while perfornirq an operating surveillance test on the Unit's power range rua. lear instnmentaticn. At 1950 hours, the Unit was taken critical.
Septerter 21 At 0513 hours, the Unit was synchronized and output was escalated to a ncninal value of 100) cxat;xat.
Septerter 21 At 0513 hours, the Unit was synchronized and output was escalated to a ncninal value of 100) cxat;xat.
amhar 22 The Unit operatal at a ncutinal value of 100% output.
amhar 22 The Unit operatal at a ncutinal value of 100% output.
Seg#anhar 29 Seg$amhar 30 At 2200 hours, the Unit's cutpt?. was reduced to 15% to t
Seg#anhar 29 Seg$amhar 30 At 2200 hours, the Unit's cutpt?. was reduced to 15% to
B watertex of the Unit's main condeneer. repairs to the condeneer tube cleaning L
%' watertex of the Unit's main condeneer. repairs to the condeneer tube cleaning t
B L


J AVERACE DAILY UNIT 70wta LEYtt                                                 .
AVERACE DAILY UNIT 70wta LEYtt J
l l
l DOCKET NO.
DOCKET NO.         50-412 UNly       bVPS Unit 2     l g47g        10/10/88       ;
50-412 UNly bVPS Unit 2 10/10/88 g47g COMPLETED SY M.A. Winner TTLIPHONg (412) 393-7621 t
COMPLETED SY           M.A. Winner
.'                                                                                                TTLIPHONg         (412) 393-7621 t
1 i
1 i
g          September 1988 DAY       AVERACE DAILY power LIVIL                         DAY       AVERACE DAILY power LIvtL tMWe, Net s                                               i M h Nets
September 1988 g
;                l 777                                  gy                     798 1
DAY AVERACE DAILY power LIVIL DAY AVERACE DAILY power LIvtL tMWe, Net s i M h Nets 777 798 l
769                                   gg                   ],98 781                                 g,                      790 3
gy 1
a 4
769 gg
781                                  g                    , 75 g                   790                                                         375 4
],98 781 790 3
11 4                   790                                 m                       798 7                   744                                 y                       794 3                   785                                   4                     798 9
g, 781
786                                                         798 l                                                       -                  18 l             le                      781                                                         802 3
, 75 a
l             gg                       786                                 g                      798 g;                       790                                  g                       798
4 g
              ,3                      19s                                 :,                      79.
790 375 g
I y                       807                                 3g                     778 gg                      802
11 4
                                                          ,                g                      N/A 802 le i
4 790 798 m
LNSTRL'CTIONS on this formal.!st the acrap saily unie ',mer sset :n Ntwe.Nei far each day in the revueting its.atn. i'...nnuie e u i
7 744 y
thG Seafell *hN ffWpwall.
794 3
i I
785 4
j                                                                                                                              44f77) i i
798 786 798 l
9 18 l
781 802 le 3
l gg g
786 798 790 798 g;
g 19s 79.
,3 I
778 y
807 3g 802 N/A gg g
802 le i
LNSTRL'CTIONS on this formal.!st the acrap saily unie ',mer sset :n Ntwe.Nei far each day in the revueting its.atn. i'...nnuie eu thG Seafell *hN ffWpwall.
i i
I j
44f77) i i
l l
l l


F
F
                                                                                                                                                                        ~
~
UNII SHtJIDOWN$ AND FOWER REEMET10NS                       DOCRE T NO. 50-412 UNIT NAmet avPs ts-It 2 DATE 10/10/88                       .
i I
REPORTA00NIN September 1988                   CORWLETEle gy M.A. Winzer its.treecesE (412 )-393- 76ZT
UNII SHtJIDOWN$ AND FOWER REEMET10NS DOCRE T NO. 50-412 UNIT NAmet avPs ts-It 2 DATE 10/10/88 REPORTA00NIN September 1988 CORWLETEle gy M.A. Winzer its.treecesE (412 )-393-76ZT
                                                                .s le em                       as o o, l       "g       0 Ct       Licensee             .,                  Csuse & Corrective No.         Date   ".        %$          E     3%I             Ev'ent           !,    S$                   Actton to R     a
.s le em as o o, l "g
                                      $5           3     f$"           Report #           .I   s$               Prevent Recurrence H                   u       ym                               CU   0 a
Ct Licensee Csuse & Corrective 0
18       880920   F         26.1       C         3           88-13             IA   INSTRU . Unit inadvertently tripped on 2 out of 3 OPAT Signals, while performing an operating eurveillance test on the l                                                                                          Unit's power range nuclear 9
No.
instrumentation.
Date E
19         880921   F           0         H         5           N/A             ZZ   ZZZZZZ   Power rampup after Unit shutdown.
3%I Ev'ent S$
20         880930   S           0         B         5           N/A             IIF   HTEXCII Unit's output reduced to 757. to permit repairs to the condenser tube cleaning system for the 'B' waterbox of the Unit's main condenser.
Actton to R
I                     2 l~  f wieJ        Reas.                                              3 ,,,, g,.4 :                         4 5 5. hrJu8eJ                                                                                                    1. sluties C - Inde== !6.=es A f.g ep r.: reel.,eg1 ,gd,6 I                       g _,,,,,,, g                           g., r,cya,,,,m, ..e Ipm3 3 u%, .., g,,8                                                                               I aseg sheces s. I a rence 2-seam eI serem C Refe.cli"E                                         3-herm etc Scree                       I '<=e It.3%.s e I I It 4 I eBr t Ni titl 6
$5 3
                          *) Repdaew) Stessekseen 4-Centtes-d Fres'Prewto=* feenth       hit.Il I tlyrsae.= Isaisieng A I sicase i ssesammi en 5-see csiess I Ad"*"esses"                                         9-Other                           5
f$"
: f. figwease. isi I se.w Il ar Imul                                                                             .
Report #
Isbsene1 Ssner %.eu.<
.I s$
l'8/ F F)               It Ospice il 3g.14 )                     -
Prevent Recurrence H
a u
ym CU 0
a 18 880920 F
26.1 C
3 88-13 IA INSTRU
. Unit inadvertently tripped on 2 out of 3 OPAT Signals, while performing an l
operating eurveillance test on the 9
Unit's power range nuclear instrumentation.
19 880921 F
0 H
5 N/A ZZ ZZZZZZ Power rampup after Unit shutdown.
20 880930 S
0 B
5 N/A IIF HTEXCII Unit's output reduced to 757. to permit repairs to the condenser tube cleaning system for the
'B' waterbox of the Unit's main condenser.
I 2
3,,,, g,.4 :
4 l~
f wieJ Reas.
: 1. sluties C - Inde== !6.=es 5 5. hrJu8eJ A f.g ep r.: reel.,eg1,gd,6 I g _,,,,,,, g g., r,cya,,,,m,..e Ipm3 3 u%,.., g,,8 2-seam eI serem I aseg sheces s. I a rence C Refe.cli"E 3-herm etc Scree I '<=e It.3%.s e I I It 4 I eBr t Ni titl 6
*) Repdaew) Stessekseen 4-Centtes-d Fres'Prewto=* feenth hit.Il I tlyrsae.= Isaisieng A I sicase i ssesammi en 5-se csiess e
I Ad"*"esses" 9-Other 5
: f. figwease. isi I se.w Il ar Imul Isbsene1 Ssner %.eu.<
l'8/ F F)
It Ospice il 3g.14 )
e
e
\                                                                                                             _
\\


OPERATING DATA REPORT DOCKET NO :     50 412 REPORT DATE:   10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE:       (412) 393 7621 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO :
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2       Notes
50 412 REPORT DATE:
10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE:
(412) 393 7621 OPERATING STATUS
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
: 2. REPORTING PERIOD: SEPTEMBER 1988
: 2. REPORTING PERIOD: SEPTEMBER 1988
: 3. LICENSED THERMAL POWER (MVt):               2660
: 3. LICENSED THERMAL POWER (MVt):
: 4. NAMEPLATE RATING (Gross MVe):               523
2660
: 5. DESIGN ELECTRICAL RATING (Net MWe):         836
: 4. NAMEPLATE RATING (Gross MVe):
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe):       885
523
: 7. MAX. DEPENDABLE CAPACITY (Net MVe):         833
: 5. DESIGN ELECTRICAL RATING (Net MWe):
836
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
: 7. MAX. DEPENDABLE CAPACITY (Net MVe):
833
: 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
: 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe):           None
: 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe):
: 10. REASONS FOR RESTRICTIONS. IF ANY:                             N/A THIS MONTH   YEAR TO DATE         CUMULATIVE
None
: 11. HOURS IN REPORTING PERIOD:                   720.0         6575.0           7646.0
: 10. REASONS FOR RESTRICTIONS. IF ANY:
: 12. NO. OF HRS. REACTOR VAS CRITICAL:             703.3         6074.8           7040.3
N/A THIS MONTH YEAR TO DATE CUMULATIVE
: 13. REACTOR RESERVE SHUTDOWN HOURS:                 0.0             0.0             0.0
: 11. HOURS IN REPORTING PERIOD:
: 14. HOURS GENERATOR VAS ON LINE:                 693.9         6020.5           6970.3
720.0 6575.0 7646.0
: 15. UNIT REFERVE SHUTDOWN HOURS:                   0.0             0.0             0.0
: 12. NO. OF HRS. REACTOR VAS CRITICAL:
: 16. CROSS THERMAL ENERGY GEN. (MWH):         1802754.0       15598760.0       17984397.4
703.3 6074.8 7040.3
: 17. CROSS ELECT. ENERGY GEN. (MVH):           573600.0       5007300.0         5789500.0
: 13. REACTOR RESERVE SHUTDOWN HOURS:
: 18. NET ELECTRICAL ENERGY GEN. (MVH):         542536.0       4732807.0         5470911.0
0.0 0.0 0.0
: 19. UNIT SERVICE FACTOR: (PERCENT)                 96.4             91.6             91.2
: 14. HOURS GENERATOR VAS ON LINE:
: 20. UNIT AVAILABILITY FACTOR:(PERCENT)             96.4             91.6             91.2
693.9 6020.5 6970.3
: 21. UNIT CAPACITY FACTOR (KDC): PCT               90.5             86.4             85.9
: 15. UNIT REFERVE SHUTDOWN HOURS:
: 22. UNIT CAPACITY FACTOR (DER): PCT               90.1             86.1             85 6
0.0 0.0 0.0
: 23. UNIT FORCED OUTAGE RATE: (PERCENT)             3.6             3.3             4.5
: 16. CROSS THERMAL ENERGY GEN. (MWH):
1802754.0 15598760.0 17984397.4
: 17. CROSS ELECT. ENERGY GEN. (MVH):
573600.0 5007300.0 5789500.0
: 18. NET ELECTRICAL ENERGY GEN. (MVH):
542536.0 4732807.0 5470911.0
: 19. UNIT SERVICE FACTOR: (PERCENT) 96.4 91.6 91.2
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) 96.4 91.6 91.2
: 21. UNIT CAPACITY FACTOR (KDC): PCT 90.5 86.4 85.9
: 22. UNIT CAPACITY FACTOR (DER): PCT 90.1 86.1 85 6
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) 3.6 3.3 4.5
: 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE. AND DURATION OF EACH):
: 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE. AND DURATION OF EACH):
UNIT IS SCHEDUtrn FOR FIRST REFUELING OUTAGE BEGINNING MARCH 17.1989 TO HAY 26.1989
UNIT IS SCHEDUtrn FOR FIRST REFUELING OUTAGE BEGINNING MARCH 17.1989 TO HAY 26.1989
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST       ACHIEVED INITIAL CRITICALITY                 N/A             N/A INITIAL ELECTRICITY                 N/A             N/A COMMERCIAL OPERATION                 N/A             N/A L                                 .                                                                        /'
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A L
/'


                                      'Af                                                                                                                       l
'Af DuquesneUEht 1.,. so,. m m l
  ,                                DuquesneUEht                                                                                                   1.,. so,. m m l
Nucket Group P.O. Don 4 October 10, 1988 Shippingport, PA IM77 0004 1
Nucket Group                                                                                                           l P.O. Don 4                                                                             October 10, 1988             !
Shippingport, PA IM77 0004 1
Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. D m-66 Unit 2 - Docket No. 50 412, License No. NPF-73 Monthly Ooeratim Reoort 1
Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. D m-66 Unit 2 - Docket No. 50 412, License No. NPF-73 Monthly Ooeratim Reoort 1
I.
I.
l U. S. Nuclear Regulatory Comuission 1
l U. S. Nuclear Regulatory Comuission Document Control Desk 1
Document Control Desk Washington, D.C. 20555 ij                                   Gentlanen:
Washington, D.C.
In accordance with                                           ix A       Technical Specifications, the Monthly i
20555 ij Gentlanen:
Operating Report is subnit                                         for Unkt 1 ard Unit 2 for the month of September, 1988.
In accordance with ix A Technical Specifications, the Monthly Operating Report is subnit for Unkt 1 ard Unit 2 for the month of September, i
1988.
t i
t i
1                                                                                                                                 Very truly yours, i
1 Very truly yours, i
4 0
4 0
(   dl. ,   -
(
                                                                                                                                  . D. Sieber Nice President Nuclear GruIp l                                     Imd Enclosures l                                     ocs NRC Rajional Office KilvJ of Prussia, PA i
dl.,
. D. Sieber Nice President Nuclear GruIp l
Imd Enclosures l
ocs NRC Rajional Office KilvJ of Prussia, PA i
l I
l I
i
i
                                                                                                                                              ,I L_}}
,I L_}}

Latest revision as of 20:10, 6 December 2024

Monthly Operating Repts for Sept 1988 for Beaver Valley Power Station Units 1 & 2
ML20207N638
Person / Time
Site: Beaver Valley
Issue date: 09/30/1988
From: Sieber J, Winger M
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810190269
Download: ML20207N638 (9)


Text

V 3

NARRATIVE SU tNtY OF MCt m!LY 0. 6.33 EXPERIFNCE UNIT I SEPTENLER 1988 Sqterber 1 The Unit operated at a ncnimi value of 100% output.

thruxf1 Septerter 3 Septatnr 4 At 0015, the Unit's outp2t was rodtxxd to 50% to load follcu.

Septater 5 The Unit zumined at 50%.

September 6 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, the Unit's outp2t was escalated to a nceimi value of 100% ctJtpat.

Scotator 7 The Unit operated at a ro:timl value of 100% cutput.

t. M Septater 9 Septeter 10 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the Unit's output was ratuccd to 50% to load folicw.

Septeter 11 The Unit's outp2t rcrained at 50%.

Septater 12 At 0445 bcurs, the Unit's output was increasal to a ncrtiral value of 100% output.

Septeter 13 The Unit cporattd at a ncnimi value ot' 100% cutput.

th m #1 Septator 16 Septenbar 17 At 0002 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, the Unit's cu+ pat has reduced tr. 50% to 1 cad follcu.

Septeter 18 The Unit cporated at 50% cutp2t.

September 19 At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />, the Unit's cutput was increased to 100%.

Septetor 20 The Unit operated at a ncnimi value of 100% cutput, th m rfi Septembct 23 Septater 24 At 002C lyun3, the Unit's cutput was ro+vwi to 50% for load follcuirg.

Septcier 25

'1ho Unit cporated at 50% output.

Septenber 26 At 0430 bcurs, the Unit's output was escalated to a ncnimi value of 100% outpat.

Scptember 27 The Unit cperatad at a natimi value of 100% output.

thrurJh Septeter 30 hbf b0bY

' ', }#

y e:v/

s

LL OPERATING DATA REPORT DOCKET NO.:

50 334 REPORT DATE:

10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE:

(412) 393 7621 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: dEPTEMBER 1988
3. LICENSED THERMAL POWER (MVt):

2660

4. NAMEPLATE RATING (Gross MVe):

923

5. DESIGN ELECTRICAL RATING (Net MVe):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860

7. haX. DEPENDABLE CAPACITY (Net MVe):

810

8. 1F CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net We):

None

10. REASONS FOR RESTKICTIONS. IF ANY:

N/A THIS MONTH YEAR TO DATE CUMUIATIVE

11. HOURS IN REPORTING PERIOD:

720.0 6575.0 108863.0

12. NO. OF RRS. REACTOR WAS CRITICAL:

720.0 5053.1 64237.3

13. REACTOR RESERVE SKUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

720.0 4982.3 62636.5

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. CROSS THERMAL ENERGY GEN. (MVH):

1615227.0 12441744.0 149359063.5

17. CROSS ELECT. ENERGY GEN. (MWH):

518970.0 4024769.0 47S90489.0

18. NET ELECTRICAL ENERGY GEN. (MVH):

485500,0 37/0677.0 4'

6370.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 75.8 59.8
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 75.8 59.8
21. UNIT CAPACITY FACTOR (HDC): PCT 83.2 70.8 53.9
22. UNIT CAPACITY FACTOR (DER): PCT 80.8 68.7 52.3 23 UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 2.4 18.5 24 SHUTDOVNS SCHEDULED OVER NEXT SIX MohTHS (TYPE,DATE,AND DURATION OF EACH):
25. IF SHUT ECWN AT L.'iD OF REPCRT PERIOD, ESTIMATED DaTE OF STARTUP:
26. UNITS IN TEST STATJS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

UNil 5HUIDOWN5 AND F0WER REDUCTIONS DUCKEi NO.

50-314 UNII MAME avr5 usest #1 3DATE 10/10/85 REFOR T t00NIH September 1988 004rt E1Elt ey

_M.A. winger IER.EF990NE (412)-393-7621 "s.

ca w ** o O C. O Licensee e

o Cause & Corrective No.

Date 2

3UE Event

!e o4 Action to R

    • D I

s.$ "

Report #

eE s$.

Prevent Recurrence H

sw

  • *a gu g

a 17 880904 S

0 H

5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.

18 880910 S

O H

5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.

19 889017 5

0 H

5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for Ioad following.

20 880924 S

0 H

5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.

n 1

2 3

4 I I "=eJ Rra*=e se,e s,.g :

3.Mes G. an semies.ms 5 Llerdis eJ A f.g.mpaise e y

l.,gl.pl,4,,3 s

g _g

, g g

recy,,,e,=..e p,e, 3 he e e Tess 2-es at scram I seen Sawess som f a rm<c f Ref%

3-A.te.eeic Scree 3 wee R<g*=e eI i R s I alc Nt tRI G I) E'F'el8'ae) Revoke **

4-Cent leased Freur Prewf ous 'losette UIC*I l I 8I wesene leelseeng A Isienesc I nasessaasiesse t

5.g

,,c g g I A h emene 9-Otteer 5

t. Ogwesee.mst i. e Il spla 3 Isi 4.w I-Tsun.%= c t*'/ F FI 18 Helers iI igdsmi1 e

AN ERAGE DAILV UNIT POWER LIVEL DOCKET NO. - 30"33' UNIT - 3??S 731: dl 10/1'0/88 DATE COMPLIMD SY M.A. Winger TILIPHONg (412) 393-7621 September 1988 gg DAY AVERACE DAILY POWER LIVEL DAY AVIRAGE DAILY POWER LIVEL IMWe, Net)

(MW,. Net )

806 404 37 796 371 g

gg 3

796 658 g,

4 417 788 3

5 375 21

_804 3

800 6

688 y

813 790 3

8 808 408 3

9 813 388 3

10 388 688 3

375 799 gg 3

798 g2 671 3

788 795 g3 800 796 14 g

33 808 N/A 3g 804 16 LMSTRUCTIONS On this forraat.!sst the netage dadv unit ;smer inei:n MWe. Net for each day in the rep.ating nk.nih. C.. nnute vis the nearett whO mepwatt.

(13 ( 7 7 )

L D

NARRATIVE SGMARY OF

)CtmEX OEERATING EXPERIINCE UNIT II SEPIEMBER 1988 1

The Unit operated at a ncainal value of 100% output.

Seg#anhar 19 Seltsehar 20 At 0306 laars, the Unit inadvertently tripped on 2 out of 3 OP aT aignals while perfornirq an operating surveillance test on the Unit's power range rua. lear instnmentaticn. At 1950 hours0.0226 days <br />0.542 hours <br />0.00322 weeks <br />7.41975e-4 months <br />, the Unit was taken critical.

Septerter 21 At 0513 hours0.00594 days <br />0.143 hours <br />8.482143e-4 weeks <br />1.951965e-4 months <br />, the Unit was synchronized and output was escalated to a ncninal value of 100) cxat;xat.

amhar 22 The Unit operatal at a ncutinal value of 100% output.

Seg#anhar 29 Seg$amhar 30 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, the Unit's cutpt?. was reduced to 15% to

%' watertex of the Unit's main condeneer. repairs to the condeneer tube cleaning t

B L

AVERACE DAILY UNIT 70wta LEYtt J

l DOCKET NO.

50-412 UNly bVPS Unit 2 10/10/88 g47g COMPLETED SY M.A. Winner TTLIPHONg (412) 393-7621 t

1 i

September 1988 g

DAY AVERACE DAILY power LIVIL DAY AVERACE DAILY power LIvtL tMWe, Net s i M h Nets 777 798 l

gy 1

769 gg

],98 781 790 3

g, 781

, 75 a

4 g

790 375 g

11 4

4 790 798 m

7 744 y

794 3

785 4

798 786 798 l

9 18 l

781 802 le 3

l gg g

786 798 790 798 g;

g 19s 79.

,3 I

778 y

807 3g 802 N/A gg g

802 le i

LNSTRL'CTIONS on this formal.!st the acrap saily unie ',mer sset :n Ntwe.Nei far each day in the revueting its.atn. i'...nnuie eu thG Seafell *hN ffWpwall.

i i

I j

44f77) i i

l l

F

~

i I

UNII SHtJIDOWN$ AND FOWER REEMET10NS DOCRE T NO. 50-412 UNIT NAmet avPs ts-It 2 DATE 10/10/88 REPORTA00NIN September 1988 CORWLETEle gy M.A. Winzer its.treecesE (412 )-393-76ZT

.s le em as o o, l "g

Ct Licensee Csuse & Corrective 0

No.

Date E

3%I Ev'ent S$

Actton to R

$5 3

f$"

Report #

.I s$

Prevent Recurrence H

a u

ym CU 0

a 18 880920 F

26.1 C

3 88-13 IA INSTRU

. Unit inadvertently tripped on 2 out of 3 OPAT Signals, while performing an l

operating eurveillance test on the 9

Unit's power range nuclear instrumentation.

19 880921 F

0 H

5 N/A ZZ ZZZZZZ Power rampup after Unit shutdown.

20 880930 S

0 B

5 N/A IIF HTEXCII Unit's output reduced to 757. to permit repairs to the condenser tube cleaning system for the

'B' waterbox of the Unit's main condenser.

I 2

3,,,, g,.4 :

4 l~

f wieJ Reas.

1. sluties C - Inde== !6.=es 5 5. hrJu8eJ A f.g ep r.: reel.,eg1,gd,6 I g _,,,,,,, g g., r,cya,,,,m,..e Ipm3 3 u%,.., g,,8 2-seam eI serem I aseg sheces s. I a rence C Refe.cli"E 3-herm etc Scree I '<=e It.3%.s e I I It 4 I eBr t Ni titl 6
  • ) Repdaew) Stessekseen 4-Centtes-d Fres'Prewto=* feenth hit.Il I tlyrsae.= Isaisieng A I sicase i ssesammi en 5-se csiess e

I Ad"*"esses" 9-Other 5

f. figwease. isi I se.w Il ar Imul Isbsene1 Ssner %.eu.<

l'8/ F F)

It Ospice il 3g.14 )

e

\\

OPERATING DATA REPORT DOCKET NO :

50 412 REPORT DATE:

10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE:

(412) 393 7621 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: SEPTEMBER 1988
3. LICENSED THERMAL POWER (MVt):

2660

4. NAMEPLATE RATING (Gross MVe):

523

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

885

7. MAX. DEPENDABLE CAPACITY (Net MVe):

833

8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS. IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720.0 6575.0 7646.0

12. NO. OF HRS. REACTOR VAS CRITICAL:

703.3 6074.8 7040.3

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR VAS ON LINE:

693.9 6020.5 6970.3

15. UNIT REFERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. CROSS THERMAL ENERGY GEN. (MWH):

1802754.0 15598760.0 17984397.4

17. CROSS ELECT. ENERGY GEN. (MVH):

573600.0 5007300.0 5789500.0

18. NET ELECTRICAL ENERGY GEN. (MVH):

542536.0 4732807.0 5470911.0

19. UNIT SERVICE FACTOR: (PERCENT) 96.4 91.6 91.2
20. UNIT AVAILABILITY FACTOR:(PERCENT) 96.4 91.6 91.2
21. UNIT CAPACITY FACTOR (KDC): PCT 90.5 86.4 85.9
22. UNIT CAPACITY FACTOR (DER): PCT 90.1 86.1 85 6
23. UNIT FORCED OUTAGE RATE: (PERCENT) 3.6 3.3 4.5
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE. AND DURATION OF EACH):

UNIT IS SCHEDUtrn FOR FIRST REFUELING OUTAGE BEGINNING MARCH 17.1989 TO HAY 26.1989

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A L

/'

'Af DuquesneUEht 1.,. so,. m m l

Nucket Group P.O. Don 4 October 10, 1988 Shippingport, PA IM77 0004 1

Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. D m-66 Unit 2 - Docket No. 50 412, License No. NPF-73 Monthly Ooeratim Reoort 1

I.

l U. S. Nuclear Regulatory Comuission Document Control Desk 1

Washington, D.C.

20555 ij Gentlanen:

In accordance with ix A Technical Specifications, the Monthly Operating Report is subnit for Unkt 1 ard Unit 2 for the month of September, i

1988.

t i

1 Very truly yours, i

4 0

(

dl.,

. D. Sieber Nice President Nuclear GruIp l