r AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-245.
AVERAGE DAILY UNIT POWER LEVEL                                                                 ,
UNIT Millstone 1 DATE 870102 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 MONTH DECEMBER, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO. 50-245.
(MWe-Net) 1 N/A 17 624 i
UNIT Millstone 1 DATE 870102 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 MONTH DECEMBER, 1986 DAY     AVERAGE DAILY POWER LEVEL           DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                           (MWe-Net) 1                 N/A                     17             624 i           2                 N/A                     18             658 3                 N/A-                     19             654 4                 N/A                     20             656 5                 N/A                     21             656 4
2 N/A 18 658 3
6                 N/A                     22             655 7                 N/A                     23             655 8                 N/A                     24             655 9                 N/A                     25             654 l           10                 N/A                     26             650 11                 N/A                     27             654 12                 N/A                     28             654 13                 N/A                     29             655 14                 N/A                     30             651 15                   12                     31             655 16                 365 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
N/A-19 654 4
                                                                                                                                  <kg1 SER12ggggggggggj4, R                   PDR                                                                                         ( (
N/A 20 656 5
N/A 21 656 4
6 N/A 22 655 7
N/A 23 655 8
N/A 24 655 9
N/A 25 654 l
10 N/A 26 650 11 N/A 27 654 12 N/A 28 654 13 N/A 29 655 14 N/A 30 651 15 12 31 655 16 365 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
<kg1 SER12ggggggggggj4, R
PDR
(
(


OPERATING DATA REPORT DOCKET NO. 50-245 DATE B75T57 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO. 50-245 DATE B75T57 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS
    '1. Unit Name: MILLSTONE 1                                                 Notes
'1.
: 2. Reporting Period: DECEMBER 1986
Unit Name: MILLSTONE 1 Notes 2.
: 3. Licensed Thermal Power (MWt): 2011 4.. Nameplate Rating (Gross MWe): EKE-
Reporting Period: DECEMBER 1986 3.
: 5. Design Electrical Rating (Net Wi): 660
Licensed Thermal Power (MWt): 2011 4..
: 6. MaximumDependableCapacity(Gross,MWil: 684
Nameplate Rating (Gross MWe): EKE-5.
: 7. Maximum Dependable Capacity (Net MWe): 654
Design Electrical Rating (Net Wi): 660 6.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
MaximumDependableCapacity(Gross,MWil: 684 7.
,          Since Last Report, Give Reasons:
Maximum Dependable Capacity (Net MWe): 654 8.
N/A
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
: 9. Power Level To Which Restricted, If Any (Net MWe): N/A
Since Last Report, Give Reasons:
: 10. Reasons For Restrictions, If Any:
N/A 9.
N/A This Month         Yr.-to-Date             Cumulative
Power Level To Which Restricted, If Any (Net MWe): N/A 10.
: 11. Hours In Reporting Period                                         744                       8760               141048
Reasons For Restrictions, If Any:
: 12. Number Of Hours Reactor Was Critical                           446.3                     8276.5             109355.3
N/A This Month Yr.-to-Date Cumulative 11.
: 13. Reactor Reserve Shutdown Hours                                 297.7                       44F 8               3283.3
Hours In Reporting Period 744 8760 141048 12.
: 14. Hours Generator On-Line                                         387.4                     8200.2             106365.4
Number Of Hours Reactor Was Critical 446.3 8276.5 109355.3 13.
: 15. Unit Reserve Shutdown Hours                                           0                           0               93.7
Reactor Reserve Shutdown Hours 297.7 44F 8 3283.3 14.
: 16. Gross Thermal Energy Generated (MWH)                           746060                   16143875           19675HD71
Hours Generator On-Line 387.4 8200.2 106365.4 15.
: 17. Gross Elec. Energy Generated (MWH)                               255000                     5490700             66191996
Unit Reserve Shutdown Hours 0
: 18. Net Electrical Energy Generated (MWH)                             241508                     5247940             63137712
0 93.7 16.
: 19. Unit Service Factor                                               52.1                       93.6                 75.4
Gross Thermal Energy Generated (MWH) 746060 16143875 19675HD71
: 20. Unit Availability Factor                                         52.1                       93.6                 75.5
: 17. Gross Elec. Energy Generated (MWH) 255000 5490700 66191996 18.
: 21. Unit Capacity Factor (Using MDC Net)                             49.6                       91.6                 68.4
Net Electrical Energy Generated (MWH) 241508 5247940 63137712 19.
: 22. Unit Capacity Factor (Using DER Net)                             49.2                       90.8                 67.8
Unit Service Factor 52.1 93.6 75.4 20.
: 23. Unit Forced Outage Rate                                           47.9                         4.7               11.8
Unit Availability Factor 52.1 93.6 75.5 21.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Unit Capacity Factor (Using MDC Net) 49.6 91.6 68.4 22.
R fueling Outage, June 1987, 3 Honth duration
Unit Capacity Factor (Using DER Net) 49.2 90.8 67.8 23.
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
Unit Forced Outage Rate 47.9 4.7 11.8 24.
: 26. Units In Test Status (Prior to Commercial Operation):                                       Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY                                                                   N/A COMMERCIAL OPERATION
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
R fueling Outage, June 1987, 3 Honth duration 25.
If Shut Down At End Of Report Period, Estimated Date of Startup: N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION


DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS         UNIT NAME Millstone 1 DATE 870102 COMPLETED BY G. Newburgh REPORT MONTH DECEMBER 1986       TELEPHONE       (203) 447-1791 Ext. 4400 l                     2 No.               Date   Type   Duration     Reason     Method of   Licensee       Systeg   Compogent         Cause & Corrective (Hours)                   Shutting 3 Event           Code     Code                 Action to Down Reactor Report #                                   Prevent Recurrence 8a             861130     F         356.6     A               4         86-027         EL         XFMR         Replacement of main Transformer continued from previous month.
DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 DATE 870102 COMPLETED BY G. Newburgh REPORT MONTH DECEMBER 1986 TELEPHONE (203) 447-1791 Ext. 4400 l
1                         2                                                     3                       4 F:         Forced   Reason:                                               Method:                   Exhibit G - Instructions 5:         Scheduled A-Equipment Failure (Explain)                         1-Manual                 for Preparation of Data B-Maintenance or Test                                 2-Manual Scram           Entry Sheets for Licensee C-Refueling                                           3-Automatic Scram         Event Report (LER) File D-Regulatory Restriction                             4-Continued from         (NUREG-0161)
2 No.
E-Operator Training & License Examination               previous month F-Administrative                                     5-Power Reduction       5 G-Operational Error (Explain)                           (Duration = 0)         Exhibit 1 - Same Source H-Other (Explain)                                     6-Other (Explain) l l
Date Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective (Hours)
Shutting Event Code Code Action to 3
Down Reactor Report #
Prevent Recurrence 8a 861130 F
356.6 A
4 86-027 EL XFMR Replacement of main Transformer continued from previous month.
1 2
3 4
F:
Forced Reason:
Method:
Exhibit G - Instructions 5:
Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)
E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5
G-Operational Error (Explain)
(Duration = 0)
Exhibit 1 - Same Source H-Other (Explain) 6-Other (Explain) l l
O
O


REFUELING INFORMATION REQUEST
REFUELING INFORMATION REQUEST 1.
: 1. Name of facility:   Millstone 1
Name of facility:
: 2. Scheduled date for next refueling shutdown: June 1987
Millstone 1 2.
: 3. Schedule date for restart following refueling: September 1987
Scheduled date for next refueling shutdown: June 1987 3.
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Schedule date for restart following refueling: September 1987 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes, Technical Specification Changes Recarding:
Yes, Technical Specification Changes Recarding:
(1) Maximum Average Planar Linear l-eat Generating Rate (2) Maximum Critical Power Ratio
(1) Maximum Average Planar Linear l-eat Generating Rate (2) Maximum Critical Power Ratio 5.
: 5. Scheduled date(s) for submitting licensing action and supporting information:
Scheduled date(s) for submitting licensing action and supporting information:
Spring 1987
Spring 1987 6.
: 6. Important licensing considerations associated with refueling, e.g.,
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
200 GE8B Fuel Assemblies
200 GE8B Fuel Assemblies 7.
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core: (a) 580                   (b) 1536
(a) In Core: (a) 580 (b) 1536 8.
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage ca)acity that has been requested or is planned, in number of fuel assem)11es:
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage ca)acity that has been requested or is planned, in number of fuel assem)11es:
2184 Assemblies
2184 Assemblies 9.
: 9. Theprojecteddateofthelastrefuelingthatcanbedischargedto the spent fuel pool assuming the present licensed capacity:
Theprojecteddateofthelastrefuelingthatcanbedischargedto the spent fuel pool assuming the present licensed capacity:
1987, Spent Fuel Pool Full Core Off Load Capability is Reached.
1987, Spent Fuel Pool Full Core Off Load Capability is Reached.
1991, Core Full, Spent Fuel Pool Contains 2146 Bundles.
1991, Core Full, Spent Fuel Pool Contains 2146 Bundles.


l OPERATING DATA REPORT DOCKET NO. 50-245 DATE E 6669 COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO. 50-245 DATE E 6669 COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.
: 1. Unit Name: Millstone 1                                   Notes
Unit Name: Millstone 1 Notes
* Revised
* Revised 2.
: 2. Reporting Period: May, 1986
Reporting Period: May, 1986 3.
: 3. Licensed Thermal Power '(MTt): 2011
Licensed Thermal Power '(MTt): 2011 4.
: 4. Nameplate Rating (Gross MWe): El-
Nameplate Rating (Gross MWe): El-5.
: 5. Design Electrical Rating (Net Fi): 660
Design Electrical Rating (Net Fi): 660 6.
: 6. Maximum Dependable Capacity (Gross MWil: 684
Maximum Dependable Capacity (Gross MWil: 684 7.
: 7. Maximum Dependable Capacity (Net MWe): 654
Maximum Dependable Capacity (Net MWe): 654 8.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe): N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative
: 11. Hours In Reporting Period 744 3623 135911 12.
Number Of Hours Reactor Was Critical 595.1 3439.4 104518.2 13.
Reactor Reserve Shutdown Hours 148.9 148.9 2983.4
: 14. Hours Generator On-Line 560.3 33T5 101587.2
: 15. Unit Reserve Shutdown Hours 183.7 "O
"93.7
: 16. Gross Thermal Energy Generated (MWH) 1103120 6739773 187353971
: 17. Gross Elec. Energy Generated (MWH) 375400 2307900 63009196 18.
Net Electrical Energy Generated (MWH) 359801 2208820 60098597 19.
Unit Service Factor 75.3 93.8 74.7
: 20. Unit Availability Factor 100.0 "93.8 "74.8
: 21. Unit Capacity Factor (Using MDC Net) 73.9 93.2 67.6
: 22. Unit Capacity Factor (Using DER Net) 73.3 92.3 67.0 23.
Unit Forced Outage Rate 0
1.2 12.0 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A
N/A
: 9. Power Level To Which Restricted, If Any (Net MWe): N/A
: 26. Units In Test Status (Prior to Commercial Operation):
: 10. Reasons For Restrictions, If Any:
Forecast Achieved i
N/A This Month          Yr.-to-Date          Cumulative
INITIAL CRITICALITY l
: 11. Hours In Reporting Period                                744          3623              135911
INITIAL ELECTRICITY N/A l
: 12. Number Of Hours Reactor Was Critical              595.1            3439.4            104518.2
COMMERCIAL OPERATION l
: 13. Reactor Reserve Shutdown Hours                  148.9              148.9              2983.4
: 14. Hours Generator On-Line                            560.3              33T5            101587.2
: 15. Unit Reserve Shutdown Hours                        183.7                "O                "93.7
: 16. Gross Thermal Energy Generated (MWH)              1103120            6739773          187353971
: 17. Gross Elec. Energy Generated (MWH)                375400            2307900            63009196
: 18. Net Electrical Energy Generated (MWH)              359801            2208820            60098597
: 19. Unit Service Factor                                  75.3              93.8                74.7
: 20. Unit Availability Factor                            100.0              "93.8                "74.8
: 21. Unit Capacity Factor (Using MDC Net)                  73.9              93.2                67.6
: 22. Unit Capacity Factor (Using DER Net)                73.3              92.3                67.0
: 23. Unit Forced Outage Rate                                  0            1.2                12.0
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:              N/A
: 26. Units In Test Status (Prior to Commercial Operation):                       Forecast Achieved i                       INITIAL CRITICALITY l                       INITIAL ELECTRICITY                                               N/A l                       COMMERCIAL OPERATION l


OPERATING DATA REPORT DOCKET NO. 50-245 DATE ElRi761 COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO. 50-245 DATE ElRi761 COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.
: 1. Unit Name: Millstone 1                               Notes
Unit Name: Millstone 1 Notes
* Revised
* Revised 2.
: 2. Reporting Period: June, 1986
Reporting Period: June, 1986 3.
: 3. Licensed Thermal Power (MWt): 2011
Licensed Thermal Power (MWt): 2011 4.
: 4. Nameplate Rating (Gross MWe): F
Nameplate Rating (Gross MWe): F 5.
: 5. Design Electrical Rating (Net RRi): 660
Design Electrical Rating (Net RRi): 660 6.
: 6. Maximum Dependable Capacity (Gross MWiT: 684
Maximum Dependable Capacity (Gross MWiT: 684 7.
: 7. Maximum Dependable Capacity (Net MWe): 654
Maximum Dependable Capacity (Net MWe): 654 8.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
Since Last Report, Give Reasons:
N/A
N/A 9.
: 9. Power Level To Which Restricted, If Any (Net MWe): N/A
Power Level To Which Restricted, If Any (Net MWe): N/A 10.
: 10. Reasons For Restrictions, If Any:
Reasons For Restrictions, If Any:
N/A This Month       Yr.-to-Date         Cumulative
N/A This Month Yr.-to-Date Cumulative 11.
: 11. Hours In Reporting Period                           720           4343                     136631
Hours In Reporting Period 720 4343 136631 12.
: 12. Number Of Hours Reactor Was Critical               720         4159.4                 105238.2
Number Of Hours Reactor Was Critical 720 4159.4 105238.2 13.
: 13. Reactor Reserve Shutdown Hours                       0         148.9                     2983.4
Reactor Reserve Shutdown Hours 0
: 14. Hours Generator On-Line                             720           4119                 102307.2
148.9 2983.4 14.
: 15. Unit Reserve Shutdown Hours                           0             "O                         "93.7
Hours Generator On-Line 720 4119 102307.2 15.
: 16. Gross Thermal Energy Generated (MWH)           1419403         8159176             188773374
Unit Reserve Shutdown Hours 0
: 17. Gross Elec. Energy Generated (MWH)             481700         2789600                 63490896
"O "93.7 16.
: 18. Net Electrical Energy Generated (MWH)           458740         2667560                 60557332
Gross Thermal Energy Generated (MWH) 1419403 8159176 188773374 17.
: 19. Unit Service Factor                                 100           94.8                           74.9
Gross Elec. Energy Generated (MWH) 481700 2789600 63490896 18.
  '20. Unit Availability Factor                           100         "94.8                         874.9
Net Electrical Energy Generated (MWH) 458740 2667560 60557332 19.
: 21. Unit Capacity Factor (Using MDC Net)             97.4           93.9                           67.8
Unit Service Factor 100 94.8 74.9
: 22. Unit Capacity Factor (Using DER Net)             96.5           93.0                           67.2
'20.
: 23. Unit Forced Outage Rate                               0           0.9                           12.0
Unit Availability Factor 100 "94.8 874.9 21.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Unit Capacity Factor (Using MDC Net) 97.4 93.9 67.8 22.
N/A
Unit Capacity Factor (Using DER Net) 96.5 93.0 67.2 23.
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:         N/A
Unit Forced Outage Rate 0
: 26. Units In Test Status (Prior to Commercial Operation):                   Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY                                               N/A COMMERCIAL OPERATION
0.9 12.0 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION


    ~w       -
~w OPERATING DATA REPORT; DOCKET NO. 50-245 DATE HEU665
OPERATING DATA REPORT; DOCKET NO. 50-245 DATE HEU665
. COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.
                                                                                          . COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS
Unit Name: Millstone 1 Notes
: 1.     Unit Name: Millstone 1                                                       Notes
* Revised 2.
* Revised
Reporting Period: July 1986 3.
: 2.     Reporting Period: July 1986
-Licensed Thermal Power (MWt): 2011 4.
: 3.   -Licensed Thermal Power (MWt): 2011
Nameplate. Rating (Gross MWe): E 5.
: 4.     Nameplate. Rating (Gross MWe): E
Design Electrical Rating (Net RWe): 660 6.
: 5.     Design Electrical Rating (Net RWe): 660
Maximum Dependable Capacity (Gross HWil: 684 7.
: 6.     Maximum Dependable Capacity (Gross HWil: 684
Maximum Dependable Capacity.(Net MWe): 654 8.
: 7.     Maximum Dependable Capacity.(Net MWe): 654
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
: 8.     If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give. Reasons:
Since Last Report, Give. Reasons:
N/A-
N/A-9.
: 9.     Power Level To Which Restricted, If Any (Net MWe): N/A
Power Level To Which Restricted, If Any (Net MWe): N/A 10.
: 10. Reasons For Restrictions, If Any:
Reasons For Restrictions, If Any:
N/A This Month             Yr.-to-Date                                 Cumulative 4
N/A This Month Yr.-to-Date Cumulative 4
: 11. Hours In Reporting Period                                                 744                                   5087                   137375 i     12. Number Of Hours Reactor Was Critical                                       744                           4903.4                       105982.2
11.
: 13. Reactor Reserve Shutdown Hours                                               0                               148.9                       2983.4
Hours In Reporting Period 744 5087 137375 i
: 14. Hours Generator On-Line                                                   744                                 4862                   103051.2
12.
: 15. Unit Reserve Shutdown Hours                                                 0                                         "O               "93.7
Number Of Hours Reactor Was Critical 744 4903.4 105982.2 13.
: 16. Gross Thermal Energy Generated (MWH)                                 1471518                         9630694                         190244892
Reactor Reserve Shutdown Hours 0
: 17. Gross Elec. Energy Generated (MWH)                                         496000                         32856UU                         63986896
148.9 2983.4 14.
: 18. . Net Electrical Energy Generated (MWH)                                   474229                         3141789                         61031561
Hours Generator On-Line 744 4862 103051.2 15.
: 19. Unit Service Factor                                                       100                                 95.6                       75.0
Unit Reserve Shutdown Hours 0
: 20. Unit Availability Factor                                                   100                               "95.6                       ^75.1
"O "93.7 16.
: 21. Unit Capacity Factor (Using MDC Net)                                     97.5                                   94.4                       67.9
Gross Thermal Energy Generated (MWH) 1471518 9630694 190244892
: 22. Unit Capacity Factor (Using DER Net)                                     96.6                                   93.6                       67.3
: 17. Gross Elec. Energy Generated (MWH) 496000 32856UU 63986896
: 23. Unit Forced Outage Rate                                                     0                                     0.8                   11.9
: 18.. Net Electrical Energy Generated (MWH) 474229 3141789 61031561 19.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Unit Service Factor 100 95.6 75.0 20.
N/A
Unit Availability Factor 100 "95.6
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:                                                               N/A
^75.1 21.
: 6. Units In Test Status (Prior to Commercial Operation):                                                                       Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY                                                                                           N/A i                                     COMMERCIAL OPERATION I
Unit Capacity Factor (Using MDC Net) 97.5 94.4 67.9 22.
Unit Capacity Factor (Using DER Net) 96.6 93.6 67.3 23.
Unit Forced Outage Rate 0
0.8 11.9 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A 6.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A i
COMMERCIAL OPERATION I


w     .
w T
T i
i OPERATING DATA REPORT-
OPERATING DATA REPORT-
. DOCKET NO. 50-245 DATE ElRPEB COMPLETED BY UllEEurgh
                                                                      . DOCKET NO. 50-245 DATE ElRPEB COMPLETED BY UllEEurgh
-TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS-1.
                                                                        -TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS-
Unit Name: Millstone'l Notes
: 1. Unit Name: Millstone'l                                 Notes
* Revised L 2.-
* Revised L 2.-   Reporting Period: August, 1986
Reporting Period: August, 1986
      = 3. Licensed Thermal Power (MWt): 2011
= 3.
:4.-   Nameplate Rating (Gross MWe): EET
Licensed Thermal Power (MWt): 2011
    ~
:4.-
5'. Design Electrical Rating (Net Ne): ~ 660
Nameplate Rating (Gross MWe): EET 5'
: 6. Maximum Dependable Capacity (Gross WeJ: 684
Design Electrical Rating (Net Ne): ~ 660
      ..7. Maximum Dependable-Capacity-(Net MWe): 654         .
~
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
6.
Maximum Dependable Capacity (Gross WeJ: 684
..7.
Maximum Dependable-Capacity-(Net MWe): 654 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
Since Last Report, Give Reasons:
N/A
N/A 9.
: 9. Power Level To Which Restricted, If Any (Net MWe): N/A
Power Level To Which Restricted, If Any (Net MWe): N/A
: 10. -Reasons For Restrictions,.If Any:
: 10. -Reasons For Restrictions,.If Any:
N/A This Month     Yr.-to-Date         Cumulative
N/A This Month Yr.-to-Date Cumulative
: 11. . Hours In Reporting Period       .
: 11.. Hours In Reporting Period 744 5647.4 106726.2 744 5831 138119 12.
744           5831             138119
Number Of Hours Reactor Was Critical 13.
: 12. Number Of Hours Reactor Was Critical                     744        5647.4            106726.2
Reactor Reserve Shutdown Hours 0
: 13. Reactor Reserve Shutdown Hours                         0         148.9             2983.4
148.9 2983.4
      -14. Hours Generator On-Line                               744           5606           103795.2
-14.
: 15. Unit Reserve Shutdown Hours           .                0   >
Hours Generator On-Line 744 5606 103795.2 15.
                                                                                    "O               "93.7
Unit Reserve Shutdown Hours 0
: 16. Gross Thermal. Energy Generated (MWH)               1459207       11089901           191704099 117. Gross Elec. Energy Generated (MWH)                   487600       3773200           64474496
"O "93.7
: 18. Net Electrical Energy Generated (MWH)               465892       3607681           61497453
: 16. Gross Thermal. Energy Generated (MWH) 1459207 11089901 191704099 117.
: 19. Unit Service Factor                                   100           96.1               75.1
Gross Elec. Energy Generated (MWH) 487600 3773200 64474496 18.
: 20. Unit Availability Factor                             100         " 96.1               "75.2
Net Electrical Energy Generated (MWH) 465892 3607681 61497453 19.
: 21. Unit Capacity Factor (Using MDC Net)                 95.7           94.6               68.1
Unit Service Factor 100 96.1 75.1 20.
: 22. Unit Capacity Factor (Using DER Net)                 94.9           93.7               67.5
Unit Availability Factor 100
: 23. Unit Forced Outage Rate                                 0           0.7               11.8
" 96.1 "75.2 21.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Unit Capacity Factor (Using MDC Net) 95.7 94.6 68.1 22.
N/A
Unit Capacity Factor (Using DER Net) 94.9 93.7 67.5 23.
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:           N/A
Unit Forced Outage Rate 0
: 26. Units In Test Status (Prior to Commercial Operation):                   Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY                                           N/A COMMERCIAL OPERATION
0.7 11.8 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION


OPERATING DATA REPORT DOCKET NO. 50-245 DATE B61TIDI COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO. 50-245 DATE B61TIDI COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.
: 1. Unit Name: Millstone 1                                     Notes
Unit Name: Millstone 1 Notes 2.
: 2. Reporting Period: September,-1986
Reporting Period: September,-1986
: 3. . Licensed Thermal Power (MWt): 2011
: 3..
* REVISED
Licensed Thermal Power (MWt): 2011
: 4. Nameplate. Rating (Gross MWe): EF
* REVISED 4.
: 5. Design Electrical Rating (Net F5Te): 660
Nameplate. Rating (Gross MWe): EF 5.
: 6. MaximumDependableCapacity(GrossMWe'T: 684
Design Electrical Rating (Net F5Te): 660 6.
: 7. Maximum Dependable Capacity (Net MWe): 654
MaximumDependableCapacity(GrossMWe'T: 684 7.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Maximum Dependable Capacity (Net MWe): 654 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted, If Any (Net MWe): N/A
9.
: 10. Reasons For Restrictions, If Any:
Power Level To Which Restricted, If Any (Net MWe): N/A 10.
N/A This Month         Yr.-to-Date       Cumulative
Reasons For Restrictions, If Any:
: 11. Hours In Reporting Period                             720             6551                         138839
N/A This Month Yr.-to-Date Cumulative 11.
  .12.'   Number Of Hours Reactor Was Critical                   720           6367.4                 107446.2
Hours In Reporting Period 720 6551 138839
: 13. Reactor Reserve Shutdown Hours                             0         148.9                         2983.4
.12.'
: 14. Hours Generator On-Line                               720             6350                 104.515.2
Number Of Hours Reactor Was Critical 720 6367.4 107446.2 13.
  - 15. Unit Reserve Shutdown Hours                                 0             "O                           " 93.7
Reactor Reserve Shutdown Hours 0
: 16. Gross Thermal Energy Generated (MWH)             1426321         12516222             193130420
148.9 2983.4 14.
: 17. Gross Elec. Energy Generated (MWH)                 479700           4252900                 64954196
Hours Generator On-Line 720 6350 104.515.2
: 18. Net Electrical Energy Generated (MWH)             458571           4066252                 61956024
- 15.
: 19. Unit Service Factor                                   100             96.9                               75.3
Unit Reserve Shutdown Hours 0
: 20. Unit Availability Factor                               100           M96.9                           ^ 75.3
"O
: 21. Unit Capacity Factor (Using MDC Net)                 97.4               94.9                               68.2
" 93.7 16.
: 22. Unit Capacity Factor (Using DER Net)                 96.5               94.0                               67.6
Gross Thermal Energy Generated (MWH) 1426321 12516222 193130420 17.
: 23. Unit Forced Outage Rate                                     0           0.6                               11.7
Gross Elec. Energy Generated (MWH) 479700 4252900 64954196 18.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Net Electrical Energy Generated (MWH) 458571 4066252 61956024 19.
N/A
Unit Service Factor 100 96.9 75.3 20.
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:N/A
Unit Availability Factor 100 M96.9
: 26. Units In Test Status (Prior to Commercial Operation):                         Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY                                                     N/A COMMERCIAL OPERATION                                                                           ,
^ 75.3 21.
Unit Capacity Factor (Using MDC Net) 97.4 94.9 68.2 22.
Unit Capacity Factor (Using DER Net) 96.5 94.0 67.6 23.
Unit Forced Outage Rate 0
0.6 11.7 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION


..    ~
~
OPERATING DATA REPORT DOCKET NO. 50-245 DATE 861103 COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO. 50-245 DATE 861103 COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.
: 1. Unit Name: Millstone 1                               Notes
Unit Name: Millstone 1 Notes
* Revised
* Revised 2.
: 2. Reporting Period: October, 1986
Reporting Period: October, 1986 3.
: 3. Licensed Thermal Power (MWt): 2011
Licensed Thermal Power (MWt): 2011 4.
: 4. Nameplate Rating (Gross MWe): EE2-
Nameplate Rating (Gross MWe): EE2-5.
: 5. Design Electrical Rating (Net RRi): 660
Design Electrical Rating (Net RRi): 660 6.
: 6. Maximum Dependable Capacity (Gross MWiT: 684
Maximum Dependable Capacity (Gross MWiT: 684 7.
: 7. Maximum Dependable Capacity (Net MWe): 654
Maximum Dependable Capacity (Net MWe): 654 8.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
Since Last Report, Give Reasons:
N/A
N/A 9.
: 9. Power Level To Which Restricted, If Any (Net MWe): N/A
Power Level To Which Restricted, If Any (Net MWe): N/A 10.
: 10. Reasons For Restrictions, If Any:
Reasons For Restrictions, If Any:
N/A This Month       Yr. -to-Date         Cumulative
N/A This Month Yr. -to-Date Cumulative 11.
: 11. Hours In Reporting Period                           745           7296             139584
Hours In Reporting Period 745 7296 139584 12.
: 12. Number Of Hours Reactor Was Critical               745         7112.4           108191.2
Number Of Hours Reactor Was Critical 745 7112.4 108191.2 13.
: 13. Reactor Reserve Shutdown Hours                       0           148.9             2983.4
Reactor Reserve Shutdown Hours 0
: 14. Hours Generator On-Line                             745           7095           105260.2
148.9 2983.4 14.
: 15. Unit Reserve Shutdown Hours                           0             "O               893.7
Hours Generator On-Line 745 7095 105260.2 15.
: 16. Gross Thermal Energy Generated (MWH)           1460136       13976358           194590556
Unit Reserve Shutdown Hours 0
: 17. Gross Elec. Energy Generated (MWH)             496700         4749600           654508V6
"O 893.7 16.
: 18. Net Electrical Energy Generated (MWH)           475081         4541333           62431105
Gross Thermal Energy Generated (MWH) 1460136 13976358 194590556 17.
: 19. Unit Service Factor                                 100           97.2               75.4
Gross Elec. Energy Generated (MWH) 496700 4749600 654508V6 18.
: 20. Unit Availability Factor                           100         ^97.2               875._5
Net Electrical Energy Generated (MWH) 475081 4541333 62431105 19.
: 21. Unit Capacity Factor (Using MDC Net)             97.5             95.2               68.4
Unit Service Factor 100 97.2 75.4 20.
: 22. Unit Capacity Factor (Using DER Net)             96.6             94.3               67.8
Unit Availability Factor 100
: 23. Unit Forced Outage Rate                               0             0.6               11.7
^97.2 875._5 21.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Unit Capacity Factor (Using MDC Net) 97.5 95.2 68.4 22.
N/A
Unit Capacity Factor (Using DER Net) 96.6 94.3 67.8 23.
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:           N/A
Unit Forced Outage Rate 0
: 26. Units In Test Status (Prior to Commercial Operation):                   Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY                                             N/A COMMERCIAL OPERATION
0.6 11.7 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION


, - .o General Offices
, -.o General Offices
* Selden Street. Berlin, Connecticut d.Cb     e'IiNwa=                                   P.O. BOX 270 e on **'ema ***                                     HARTFORD CONNECTICUT 061410270 k   k J 2((2 ((EY'[*'                                       (203) 665-5000 January 12, 1987 MP-9904 Re:   10CFR50.71(a)
* Selden Street. Berlin, Connecticut d.Cb e'IiNwa=
P.O. BOX 270 e on **'ema ***
HARTFORD CONNECTICUT 061410270 k
k J 2((2 ((EY'[*'
(203) 665-5000 January 12, 1987 MP-9904 Re:
10CFR50.71(a)
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555


Line 292: Line 377:


==Dear Sir:==
==Dear Sir:==
In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed. One additional copy of the report is enclosed.
In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed. One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 4$ da, Ste hen E.       cace Station Superintendent Millstone Nuclear Power Station SES/GSN:rg
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 4$ da, Ste hen E.
cace Station Superintendent Millstone Nuclear Power Station SES/GSN:rg


==Enclosures:==
==Enclosures:==
( )
(
cc:   Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D. C. (10)
)
cc:
Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D. C. (10)
Ofrector, Office of Resource Management T. Rebelowski, Res. Insp.
Ofrector, Office of Resource Management T. Rebelowski, Res. Insp.
fM q}}
fM q}}

Latest revision as of 20:00, 6 December 2024

Monthly Operating Rept for Dec 1986
ML20207P915
Person / Time
Site: Millstone 
Issue date: 12/31/1986
From: Newburgh G, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
MP-9904, NUDOCS 8701200402
Download: ML20207P915 (11)


Text

. _ _ - - - _ - - _ _ _ _ _ _ - _. _ _ _

r AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-245.

UNIT Millstone 1 DATE 870102 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 MONTH DECEMBER, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 N/A 17 624 i

2 N/A 18 658 3

N/A-19 654 4

N/A 20 656 5

N/A 21 656 4

6 N/A 22 655 7

N/A 23 655 8

N/A 24 655 9

N/A 25 654 l

10 N/A 26 650 11 N/A 27 654 12 N/A 28 654 13 N/A 29 655 14 N/A 30 651 15 12 31 655 16 365 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

<kg1 SER12ggggggggggj4, R

PDR

(

(

OPERATING DATA REPORT DOCKET NO. 50-245 DATE B75T57 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS

'1.

Unit Name: MILLSTONE 1 Notes 2.

Reporting Period: DECEMBER 1986 3.

Licensed Thermal Power (MWt): 2011 4..

Nameplate Rating (Gross MWe): EKE-5.

Design Electrical Rating (Net Wi): 660 6.

MaximumDependableCapacity(Gross,MWil: 684 7.

Maximum Dependable Capacity (Net MWe): 654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe): N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 744 8760 141048 12.

Number Of Hours Reactor Was Critical 446.3 8276.5 109355.3 13.

Reactor Reserve Shutdown Hours 297.7 44F 8 3283.3 14.

Hours Generator On-Line 387.4 8200.2 106365.4 15.

Unit Reserve Shutdown Hours 0

0 93.7 16.

Gross Thermal Energy Generated (MWH) 746060 16143875 19675HD71

17. Gross Elec. Energy Generated (MWH) 255000 5490700 66191996 18.

Net Electrical Energy Generated (MWH) 241508 5247940 63137712 19.

Unit Service Factor 52.1 93.6 75.4 20.

Unit Availability Factor 52.1 93.6 75.5 21.

Unit Capacity Factor (Using MDC Net) 49.6 91.6 68.4 22.

Unit Capacity Factor (Using DER Net) 49.2 90.8 67.8 23.

Unit Forced Outage Rate 47.9 4.7 11.8 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

R fueling Outage, June 1987, 3 Honth duration 25.

If Shut Down At End Of Report Period, Estimated Date of Startup: N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION

DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 DATE 870102 COMPLETED BY G. Newburgh REPORT MONTH DECEMBER 1986 TELEPHONE (203) 447-1791 Ext. 4400 l

2 No.

Date Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective (Hours)

Shutting Event Code Code Action to 3

Down Reactor Report #

Prevent Recurrence 8a 861130 F

356.6 A

4 86-027 EL XFMR Replacement of main Transformer continued from previous month.

1 2

3 4

F:

Forced Reason:

Method:

Exhibit G - Instructions 5:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)

E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5

G-Operational Error (Explain)

(Duration = 0)

Exhibit 1 - Same Source H-Other (Explain) 6-Other (Explain) l l

O

REFUELING INFORMATION REQUEST 1.

Name of facility:

Millstone 1 2.

Scheduled date for next refueling shutdown: June 1987 3.

Schedule date for restart following refueling: September 1987 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes, Technical Specification Changes Recarding:

(1) Maximum Average Planar Linear l-eat Generating Rate (2) Maximum Critical Power Ratio 5.

Scheduled date(s) for submitting licensing action and supporting information:

Spring 1987 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

200 GE8B Fuel Assemblies 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) In Core: (a) 580 (b) 1536 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage ca)acity that has been requested or is planned, in number of fuel assem)11es:

2184 Assemblies 9.

Theprojecteddateofthelastrefuelingthatcanbedischargedto the spent fuel pool assuming the present licensed capacity:

1987, Spent Fuel Pool Full Core Off Load Capability is Reached.

1991, Core Full, Spent Fuel Pool Contains 2146 Bundles.

OPERATING DATA REPORT DOCKET NO. 50-245 DATE E 6669 COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.

Unit Name: Millstone 1 Notes

  • Revised 2.

Reporting Period: May, 1986 3.

Licensed Thermal Power '(MTt): 2011 4.

Nameplate Rating (Gross MWe): El-5.

Design Electrical Rating (Net Fi): 660 6.

Maximum Dependable Capacity (Gross MWil: 684 7.

Maximum Dependable Capacity (Net MWe): 654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe): N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744 3623 135911 12.

Number Of Hours Reactor Was Critical 595.1 3439.4 104518.2 13.

Reactor Reserve Shutdown Hours 148.9 148.9 2983.4

14. Hours Generator On-Line 560.3 33T5 101587.2
15. Unit Reserve Shutdown Hours 183.7 "O

"93.7

16. Gross Thermal Energy Generated (MWH) 1103120 6739773 187353971
17. Gross Elec. Energy Generated (MWH) 375400 2307900 63009196 18.

Net Electrical Energy Generated (MWH) 359801 2208820 60098597 19.

Unit Service Factor 75.3 93.8 74.7

20. Unit Availability Factor 100.0 "93.8 "74.8
21. Unit Capacity Factor (Using MDC Net) 73.9 93.2 67.6
22. Unit Capacity Factor (Using DER Net) 73.3 92.3 67.0 23.

Unit Forced Outage Rate 0

1.2 12.0 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved i

INITIAL CRITICALITY l

INITIAL ELECTRICITY N/A l

COMMERCIAL OPERATION l

OPERATING DATA REPORT DOCKET NO. 50-245 DATE ElRi761 COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.

Unit Name: Millstone 1 Notes

  • Revised 2.

Reporting Period: June, 1986 3.

Licensed Thermal Power (MWt): 2011 4.

Nameplate Rating (Gross MWe): F 5.

Design Electrical Rating (Net RRi): 660 6.

Maximum Dependable Capacity (Gross MWiT: 684 7.

Maximum Dependable Capacity (Net MWe): 654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe): N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 720 4343 136631 12.

Number Of Hours Reactor Was Critical 720 4159.4 105238.2 13.

Reactor Reserve Shutdown Hours 0

148.9 2983.4 14.

Hours Generator On-Line 720 4119 102307.2 15.

Unit Reserve Shutdown Hours 0

"O "93.7 16.

Gross Thermal Energy Generated (MWH) 1419403 8159176 188773374 17.

Gross Elec. Energy Generated (MWH) 481700 2789600 63490896 18.

Net Electrical Energy Generated (MWH) 458740 2667560 60557332 19.

Unit Service Factor 100 94.8 74.9

'20.

Unit Availability Factor 100 "94.8 874.9 21.

Unit Capacity Factor (Using MDC Net) 97.4 93.9 67.8 22.

Unit Capacity Factor (Using DER Net) 96.5 93.0 67.2 23.

Unit Forced Outage Rate 0

0.9 12.0 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION

~w OPERATING DATA REPORT; DOCKET NO. 50-245 DATE HEU665

. COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.

Unit Name: Millstone 1 Notes

  • Revised 2.

Reporting Period: July 1986 3.

-Licensed Thermal Power (MWt): 2011 4.

Nameplate. Rating (Gross MWe): E 5.

Design Electrical Rating (Net RWe): 660 6.

Maximum Dependable Capacity (Gross HWil: 684 7.

Maximum Dependable Capacity.(Net MWe): 654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give. Reasons:

N/A-9.

Power Level To Which Restricted, If Any (Net MWe): N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 4

11.

Hours In Reporting Period 744 5087 137375 i

12.

Number Of Hours Reactor Was Critical 744 4903.4 105982.2 13.

Reactor Reserve Shutdown Hours 0

148.9 2983.4 14.

Hours Generator On-Line 744 4862 103051.2 15.

Unit Reserve Shutdown Hours 0

"O "93.7 16.

Gross Thermal Energy Generated (MWH) 1471518 9630694 190244892

17. Gross Elec. Energy Generated (MWH) 496000 32856UU 63986896
18.. Net Electrical Energy Generated (MWH) 474229 3141789 61031561 19.

Unit Service Factor 100 95.6 75.0 20.

Unit Availability Factor 100 "95.6

^75.1 21.

Unit Capacity Factor (Using MDC Net) 97.5 94.4 67.9 22.

Unit Capacity Factor (Using DER Net) 96.6 93.6 67.3 23.

Unit Forced Outage Rate 0

0.8 11.9 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A 6.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A i

COMMERCIAL OPERATION I

w T

i OPERATING DATA REPORT-

. DOCKET NO. 50-245 DATE ElRPEB COMPLETED BY UllEEurgh

-TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS-1.

Unit Name: Millstone'l Notes

  • Revised L 2.-

Reporting Period: August, 1986

= 3.

Licensed Thermal Power (MWt): 2011

4.-

Nameplate Rating (Gross MWe): EET 5'

Design Electrical Rating (Net Ne): ~ 660

~

6.

Maximum Dependable Capacity (Gross WeJ: 684

..7.

Maximum Dependable-Capacity-(Net MWe): 654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe): N/A

10. -Reasons For Restrictions,.If Any:

N/A This Month Yr.-to-Date Cumulative

11.. Hours In Reporting Period 744 5647.4 106726.2 744 5831 138119 12.

Number Of Hours Reactor Was Critical 13.

Reactor Reserve Shutdown Hours 0

148.9 2983.4

-14.

Hours Generator On-Line 744 5606 103795.2 15.

Unit Reserve Shutdown Hours 0

"O "93.7

16. Gross Thermal. Energy Generated (MWH) 1459207 11089901 191704099 117.

Gross Elec. Energy Generated (MWH) 487600 3773200 64474496 18.

Net Electrical Energy Generated (MWH) 465892 3607681 61497453 19.

Unit Service Factor 100 96.1 75.1 20.

Unit Availability Factor 100

" 96.1 "75.2 21.

Unit Capacity Factor (Using MDC Net) 95.7 94.6 68.1 22.

Unit Capacity Factor (Using DER Net) 94.9 93.7 67.5 23.

Unit Forced Outage Rate 0

0.7 11.8 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION

OPERATING DATA REPORT DOCKET NO. 50-245 DATE B61TIDI COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.

Unit Name: Millstone 1 Notes 2.

Reporting Period: September,-1986

3..

Licensed Thermal Power (MWt): 2011

  • REVISED 4.

Nameplate. Rating (Gross MWe): EF 5.

Design Electrical Rating (Net F5Te): 660 6.

MaximumDependableCapacity(GrossMWe'T: 684 7.

Maximum Dependable Capacity (Net MWe): 654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe): N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 720 6551 138839

.12.'

Number Of Hours Reactor Was Critical 720 6367.4 107446.2 13.

Reactor Reserve Shutdown Hours 0

148.9 2983.4 14.

Hours Generator On-Line 720 6350 104.515.2

- 15.

Unit Reserve Shutdown Hours 0

"O

" 93.7 16.

Gross Thermal Energy Generated (MWH) 1426321 12516222 193130420 17.

Gross Elec. Energy Generated (MWH) 479700 4252900 64954196 18.

Net Electrical Energy Generated (MWH) 458571 4066252 61956024 19.

Unit Service Factor 100 96.9 75.3 20.

Unit Availability Factor 100 M96.9

^ 75.3 21.

Unit Capacity Factor (Using MDC Net) 97.4 94.9 68.2 22.

Unit Capacity Factor (Using DER Net) 96.5 94.0 67.6 23.

Unit Forced Outage Rate 0

0.6 11.7 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION

~

OPERATING DATA REPORT DOCKET NO. 50-245 DATE 861103 COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.

Unit Name: Millstone 1 Notes

  • Revised 2.

Reporting Period: October, 1986 3.

Licensed Thermal Power (MWt): 2011 4.

Nameplate Rating (Gross MWe): EE2-5.

Design Electrical Rating (Net RRi): 660 6.

Maximum Dependable Capacity (Gross MWiT: 684 7.

Maximum Dependable Capacity (Net MWe): 654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe): N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr. -to-Date Cumulative 11.

Hours In Reporting Period 745 7296 139584 12.

Number Of Hours Reactor Was Critical 745 7112.4 108191.2 13.

Reactor Reserve Shutdown Hours 0

148.9 2983.4 14.

Hours Generator On-Line 745 7095 105260.2 15.

Unit Reserve Shutdown Hours 0

"O 893.7 16.

Gross Thermal Energy Generated (MWH) 1460136 13976358 194590556 17.

Gross Elec. Energy Generated (MWH) 496700 4749600 654508V6 18.

Net Electrical Energy Generated (MWH) 475081 4541333 62431105 19.

Unit Service Factor 100 97.2 75.4 20.

Unit Availability Factor 100

^97.2 875._5 21.

Unit Capacity Factor (Using MDC Net) 97.5 95.2 68.4 22.

Unit Capacity Factor (Using DER Net) 96.6 94.3 67.8 23.

Unit Forced Outage Rate 0

0.6 11.7 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION

, -.o General Offices

P.O. BOX 270 e on **'ema ***

HARTFORD CONNECTICUT 061410270 k

k J 2((2 ((EY'[*'

(203) 665-5000 January 12, 1987 MP-9904 Re:

10CFR50.71(a)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Reference:

Provisional License DPR-21 Docket No. 50-245

Dear Sir:

In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed. One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 4$ da, Ste hen E.

cace Station Superintendent Millstone Nuclear Power Station SES/GSN:rg

Enclosures:

(

)

cc:

Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D. C. (10)

Ofrector, Office of Resource Management T. Rebelowski, Res. Insp.