TXX-6318, Interim Deficiency Rept CP-86-08 Re Stamps Used to Identify Super Hilti Kwik Bolts (Hkbs).Initially Reported on 860206. Three Cable Tray Supports Had Std HKBs When Design Drawing Required Super Hkbs.Next Rept Anticipated by 870722: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:I         M;+-   _
{{#Wiki_filter:I M;+-
l
~
~
Log # TXX-6318
_                          Log # TXX-6318
 
                                                                  ==                         File # 10110 F9                                 903.9
==
                                                                  ~.--     2
File # 10110 F9 903.9
                                                                  -        C                  Ref # 10CFR50.55(e) s        181 ELECTRIC S
~.--
                      .m.                                                                   March 12, 1987 l
2 C
cnm, na rua,,,     =
Ref # 10CFR50.55(e) 181 ELECTRIC s
S March 12, 1987
.m.
cnm, na rua,,,
=
N i
N i
U. S. Nuclear Regulatory Commission.
U. S. Nuclear Regulatory Commission.
Attn: Document Contral Desk Washington; D.C. 20S55
Attn: Document Contral Desk Washington; D.C.
20S55 COMANdiEPEAKSThAMELECTRICSTATION(CPSES)


==SUBJECT:==
==SUBJECT:==
COMANdiEPEAKSThAMELECTRICSTATION(CPSES) s.
DOCKET NOS. 50-445 AND 50-446 s.
DOCKET NOS. 50-445 AND 50-446 INSTALLATION OF SUPER HILTI KWIK BOLTS SDAR: CP-86-08 (INTERIM REPORT)
INSTALLATION OF SUPER HILTI KWIK BOLTS SDAR: CP-86-08 (INTERIM REPORT)
Gentlemen:
Gentlemen:
* On February 6,1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the control of< stamps used to identify Super Hilti Kwik Bolts (HKB). This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).             Our previous report was logged TXX-6122 dated December 1, 1986.
On February 6,1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the control of< stamps used to identify Super Hilti Kwik Bolts (HKB). This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
Ultrasonic testing has been completed on a random sample of supports in each of the cable tray, conduit and HVAC systems in Units I and II. A total of 360 supports were involved in the analysis. Quality engineering has completed examination of the results and has determined that three (3) cable tray supports had standud HKBs installed where the design drawings specified Super HXFm The standard HKBs were found to be stamped for identification indicating " Super" HKB.     Non-conformance reports have been issued for these supports documenting the installations concurrent.with the evaluation for possible adverse effects on plant safety.
Our previous report was logged TXX-6122 dated December 1, 1986.
A similar program of sampling, testing and evaluation is underway for electrical equipment and structural steel supports which were installed using HKBs. These actions and our evaluations are scheduled for completion on June
Ultrasonic testing has been completed on a random sample of supports in each of the cable tray, conduit and HVAC systems in Units I and II. A total of 360 supports were involved in the analysis.
      ,              30, 1987.
Quality engineering has completed examination of the results and has determined that three (3) cable tray supports had standud HKBs installed where the design drawings specified Super HXFm The standard HKBs were found to be stamped for identification indicating " Super" HKB.
Non-conformance reports have been issued for these supports documenting the installations concurrent.with the evaluation for possible adverse effects on plant safety.
A similar program of sampling, testing and evaluation is underway for electrical equipment and structural steel supports which were installed using HKBs. These actions and our evaluations are scheduled for completion on June 30, 1987.
I t
I t
t-3 G70317010ei S70312                                                                                   ff PDR'     ADOCK' 05000445                                                                               i S                     PDR xx) North Olise Street I_It 81 Dallas. Texa,75201
t-3 G70317010ei S70312 ff PDR' ADOCK 05000445 i
S PDR xx) North Olise Street I_It 81 Dallas. Texa,75201


TXX-6318 March 12, 1987 Page 2 of 2 Corrective Action Reports (CAR) were initiated for ASME installations (CAR-
TXX-6318 March 12, 1987 Page 2 of 2 Corrective Action Reports (CAR) were initiated for ASME installations (CAR-
        -058), which documents the programs outlined above, and for Non-ASME installations (CAR-074). CAR-058 has been completed and indicates that this issue is not reportable. CAR-074 has not been completed.
-058), which documents the programs outlined above, and for Non-ASME installations (CAR-074). CAR-058 has been completed and indicates that this issue is not reportable. CAR-074 has not been completed.
We will submit our next report no later than July 22, 1987.
We will submit our next report no later than July 22, 1987.
Very truly yours, W. G. Counsil GLB/dl l         c - Mr. E. H. Johnson - Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV}}
Very truly yours, W. G. Counsil GLB/dl l
c - Mr. E. H. Johnson - Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV}}

Latest revision as of 19:45, 6 December 2024

Interim Deficiency Rept CP-86-08 Re Stamps Used to Identify Super Hilti Kwik Bolts (Hkbs).Initially Reported on 860206. Three Cable Tray Supports Had Std HKBs When Design Drawing Required Super Hkbs.Next Rept Anticipated by 870722
ML20207R321
Person / Time
Site: Comanche Peak  
Issue date: 03/12/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-86-08, CP-86-8, TXX-6318, NUDOCS 8703170106
Download: ML20207R321 (2)


Text

I M;+-

~

Log # TXX-6318

==

File # 10110 F9 903.9

~.--

2 C

Ref # 10CFR50.55(e) 181 ELECTRIC s

S March 12, 1987

.m.

cnm, na rua,,,

=

N i

U. S. Nuclear Regulatory Commission.

Attn: Document Contral Desk Washington; D.C.

20S55 COMANdiEPEAKSThAMELECTRICSTATION(CPSES)

SUBJECT:

DOCKET NOS. 50-445 AND 50-446 s.

INSTALLATION OF SUPER HILTI KWIK BOLTS SDAR: CP-86-08 (INTERIM REPORT)

Gentlemen:

On February 6,1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the control of< stamps used to identify Super Hilti Kwik Bolts (HKB). This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

Our previous report was logged TXX-6122 dated December 1, 1986.

Ultrasonic testing has been completed on a random sample of supports in each of the cable tray, conduit and HVAC systems in Units I and II. A total of 360 supports were involved in the analysis.

Quality engineering has completed examination of the results and has determined that three (3) cable tray supports had standud HKBs installed where the design drawings specified Super HXFm The standard HKBs were found to be stamped for identification indicating " Super" HKB.

Non-conformance reports have been issued for these supports documenting the installations concurrent.with the evaluation for possible adverse effects on plant safety.

A similar program of sampling, testing and evaluation is underway for electrical equipment and structural steel supports which were installed using HKBs. These actions and our evaluations are scheduled for completion on June 30, 1987.

I t

t-3 G70317010ei S70312 ff PDR' ADOCK 05000445 i

S PDR xx) North Olise Street I_It 81 Dallas. Texa,75201

TXX-6318 March 12, 1987 Page 2 of 2 Corrective Action Reports (CAR) were initiated for ASME installations (CAR-

-058), which documents the programs outlined above, and for Non-ASME installations (CAR-074). CAR-058 has been completed and indicates that this issue is not reportable. CAR-074 has not been completed.

We will submit our next report no later than July 22, 1987.

Very truly yours, W. G. Counsil GLB/dl l

c - Mr. E. H. Johnson - Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV