ML20209H895: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:~#? | {{#Wiki_filter:~#? | ||
In Reply Refer To: | APR 2 91987 i | ||
Docket: | In Reply Refer To: | ||
Omaha Public Power District ATTN: | ) | ||
Docket: | |||
50-285 i | |||
Omaha Public Power District ATTN: | |||
R. L. Andrews, Division Manager-Nuclear Production 1623 Harney Street Omaha, Nebraska 68102 Gentlemen: | |||
This is to acknowledge receipt of changes to the Fort Calhoun Station Radiological Emergency Response Plan transmitted to this office by your {{letter dated|date=April 10, 1987|text=letter dated April 10, 1987}}, in accordance with the requirements of 10 CFR 50.54(q) and Appendix E to 10 CFR Part 50. | This is to acknowledge receipt of changes to the Fort Calhoun Station Radiological Emergency Response Plan transmitted to this office by your {{letter dated|date=April 10, 1987|text=letter dated April 10, 1987}}, in accordance with the requirements of 10 CFR 50.54(q) and Appendix E to 10 CFR Part 50. | ||
The changes have been forwarded to the staff for review to ensure that they do not decrease the effectiveness of the plan. | The changes have been forwarded to the staff for review to ensure that they do not decrease the effectiveness of the plan. | ||
If you have any questions in regard to your transmittal, please contact Mr. N. M. Terc at (817) 860-8129 . | The review findings will be forwarded to you under separate letter. | ||
If you have any questions in regard to your transmittal, please contact Mr. N. M. Terc at (817) 860-8129. | |||
~ | |||
Sincerely, ORIGINAL SIGNED BY: | Sincerely, ORIGINAL SIGNED BY: | ||
J. E. Gagliardo, Chief Reactor Projects Branch cc: | J. E. Gagliardo, Chief Reactor Projects Branch cc: | ||
W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska | W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Esq. | ||
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D. C. | LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D. C. | ||
NRCardner/Jt | 20036 Kansas Rudiation Control Program Director Nebraska Radiation Control Program Director RIV: EPA EP&SPs C:EP&SP C:R&SPN RP, C:RPB | ||
AI 87-135 | / | ||
NRCardner/Jt NMTerc LAYandell WLFisher DR gter JEGagl o | |||
L{ /S/87 y /4fo/87 t{/16/87 | |||
%/M/87 4/ti/87 4/ / | |||
tJ AI 87-135 h | |||
fa' 'J#R 'o"effg= | |||
,y | ce | ||
Omaha Public Power District | ,y Omaha Public Power District bec to DMB (A045) bcc distrib. by RIV: | ||
RPB Resident Inspector R. D. Martin, RA D. Weiss, RM/ALF R&SPB Section Chief (RPB/B) | RPB Resident Inspector R. D. Martin, RA D. Weiss, RM/ALF R&SPB Section Chief (RPB/B) | ||
RIV File DRSP RSB Inspector Section Chief W. L. Fi sher R. L. Bangart R. E. Hall Project Inspector, RPB D. B. Matthews, NRR N. R. Gardner}} | RIV File DRSP RSB Inspector Section Chief W. L. Fi sher R. L. Bangart R. E. Hall Project Inspector, RPB D. B. Matthews, NRR N. R. Gardner}} | ||
Latest revision as of 17:32, 6 December 2024
| ML20209H895 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 04/29/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Andrews R OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20209H900 | List: |
| References | |
| NUDOCS 8705040146 | |
| Download: ML20209H895 (2) | |
Text
~#?
APR 2 91987 i
In Reply Refer To:
)
Docket:
50-285 i
Omaha Public Power District ATTN:
R. L. Andrews, Division Manager-Nuclear Production 1623 Harney Street Omaha, Nebraska 68102 Gentlemen:
This is to acknowledge receipt of changes to the Fort Calhoun Station Radiological Emergency Response Plan transmitted to this office by your letter dated April 10, 1987, in accordance with the requirements of 10 CFR 50.54(q) and Appendix E to 10 CFR Part 50.
The changes have been forwarded to the staff for review to ensure that they do not decrease the effectiveness of the plan.
The review findings will be forwarded to you under separate letter.
If you have any questions in regard to your transmittal, please contact Mr. N. M. Terc at (817) 860-8129.
~
Sincerely, ORIGINAL SIGNED BY:
J. E. Gagliardo, Chief Reactor Projects Branch cc:
W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D. C.
20036 Kansas Rudiation Control Program Director Nebraska Radiation Control Program Director RIV: EPA EP&SPs C:EP&SP C:R&SPN RP, C:RPB
/
NRCardner/Jt NMTerc LAYandell WLFisher DR gter JEGagl o
L{ /S/87 y /4fo/87 t{/16/87
%/M/87 4/ti/87 4/ /
tJ AI 87-135 h
fa' 'J#R 'o"effg=
ce
,y Omaha Public Power District bec to DMB (A045) bcc distrib. by RIV:
RPB Resident Inspector R. D. Martin, RA D. Weiss, RM/ALF R&SPB Section Chief (RPB/B)
RIV File DRSP RSB Inspector Section Chief W. L. Fi sher R. L. Bangart R. E. Hall Project Inspector, RPB D. B. Matthews, NRR N. R. Gardner