ML20210A934: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:__                            _ _ _ .
{{#Wiki_filter:( _._ - _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _.
( _ ._ - _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ .
1' lowa Electric Light and Power Company September 15, 1986 OAEC-86-0681 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Coenission 4
1' lowa Electric Light and Power Company September 15, 1986 OAEC-86-0681                                         ;
Washington, D. C.
Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Coenission                                             4 Washington, D. C.                 20555                                                                               l Attn: Document Control Desk                                                                                           ;
20555 l
r
Attn: Document Control Desk r


==Subject:==
==Subject:==
Duane Arnold Energy Center                                       !
Duane Arnold Energy Center Docket No. 50-331 Op. License DPR-49 August, 1986 Monthly Operating Report
Docket No. 50-331 Op. License DPR-49 August, 1986 Monthly Operating Report


==Dear Sirs:==
==Dear Sirs:==
 
Please find enclosed 12 copies of the Ouane Arnold Energy Center Monthly l
Please find enclosed 12 copies of the Ouane Arnold Energy Center Monthly                                     l Operating Report for August, 1986. The report has been prepared in accordance with the guidelines of Regulatory Guide 1.16 and distribution has been made in accordance with DAEC Technical Specifications, Appendix A, Section 6.11.1.c and Regulatory Guide 10.1. Also enclosed are copies of page one of the June and July Operating Report which have been revised due to mathematical errors.                                                 l Very truly yours, p1w!
Operating Report for August, 1986. The report has been prepared in accordance with the guidelines of Regulatory Guide 1.16 and distribution has been made in accordance with DAEC Technical Specifications, Appendix A, Section 6.11.1.c and Regulatory Guide 10.1. Also enclosed are copies of page one of the June and July Operating Report which have been revised due to mathematical errors.
Daniel L. Mineck Plant Superintendent - Nuclear Duane Arnold Energy Center                         .
l Very truly yours, p1w!
Enclosures                                                                                                           t File A-118d cc: Director, Office of Inspection                                           Mr. Phillip Ross and Enforcement                                               U. S. Nuclear Regulatory Connission U. S. Nuclear Regulatory Connission                                 Maryland National Bank Building Region 111                                                         Washington, D. C. 20555                 t 799 Roosevelt Road                                                                                         l Glen Ellyn, IL 60137                   (1)                         NRC Resident inspector                 l Director, Office of Management and                                 Mr. Dennis Murdock                     :
Daniel L. Mineck Plant Superintendent - Nuclear Duane Arnold Energy Center Enclosures t
Program Analysis                                             Central lowa Power Cooperative U. S. Nuclear Regulatory Connission                                 Box 2517 Washington, D. C. 20555 (1)                                         Cedar Rapids, IA 52406                 :
File A-118d cc: Director, Office of Inspection Mr. Phillip Ross and Enforcement U. S. Nuclear Regulatory Connission U. S. Nuclear Regulatory Connission Maryland National Bank Building Region 111 Washington, D. C.
U. S. Nuclear Regulatory Comnission                                 Mr. Russ Gamble ATTN: Mr. M. Thadant                                               Corn Belt Power Cooperative Phillips Building                                       1300 13th Street North                 :
20555 t
Washington, D. C. 20555                                             Humboldt, IA 50548 l
799 Roosevelt Road l
INPO Records Center                                   gg9gg4gg g 99g 1100 Circle 15 Parkway                                 PDR         ADOCK 05000331 Suite 1500 Atlanta, GA 30339 R                        PDR                  rE AY 1 on.one .unnta 1:nvrn,- o cuarr . 32.~r suw n<uad . naa, <nsa stau
Glen Ellyn, IL 60137 (1)
* a m e s..~n s a tQ}}
NRC Resident inspector l
Director, Office of Management and Mr. Dennis Murdock Program Analysis Central lowa Power Cooperative U. S. Nuclear Regulatory Connission Box 2517 Washington, D. C. 20555 (1)
Cedar Rapids, IA 52406 U. S. Nuclear Regulatory Comnission Mr. Russ Gamble ATTN: Mr. M. Thadant Corn Belt Power Cooperative Phillips Building 1300 13th Street North Washington, D. C. 20555 Humboldt, IA 50548 INPO Records Center gg9gg4gg g 99g 1100 Circle 15 Parkway PDR ADOCK 05000331 rE AY Suite 1500 R
PDR 1
Atlanta, GA 30339 tQ on.one.unnta 1:nvrn,- o cuarr. 32.~r suw n<uad. naa, <nsa stau
* a m e s..~n s a}}

Latest revision as of 17:09, 6 December 2024

Forwards Monthly Operating Rept for Aug 1986 & Revised Page 1 for Monthly Operating Repts for June & Jul 1986.Page Revised Due to Mathematical Errors
ML20210A934
Person / Time
Site: Duane Arnold 
Issue date: 09/15/1986
From: Mineck D
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20210A941 List:
References
DEAC-86-0681, DEAC-86-681, NUDOCS 8609170400
Download: ML20210A934 (1)


Text

( _._ - _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _.

1' lowa Electric Light and Power Company September 15, 1986 OAEC-86-0681 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Coenission 4

Washington, D. C.

20555 l

Attn: Document Control Desk r

Subject:

Duane Arnold Energy Center Docket No. 50-331 Op. License DPR-49 August, 1986 Monthly Operating Report

Dear Sirs:

Please find enclosed 12 copies of the Ouane Arnold Energy Center Monthly l

Operating Report for August, 1986. The report has been prepared in accordance with the guidelines of Regulatory Guide 1.16 and distribution has been made in accordance with DAEC Technical Specifications, Appendix A, Section 6.11.1.c and Regulatory Guide 10.1. Also enclosed are copies of page one of the June and July Operating Report which have been revised due to mathematical errors.

l Very truly yours, p1w!

Daniel L. Mineck Plant Superintendent - Nuclear Duane Arnold Energy Center Enclosures t

File A-118d cc: Director, Office of Inspection Mr. Phillip Ross and Enforcement U. S. Nuclear Regulatory Connission U. S. Nuclear Regulatory Connission Maryland National Bank Building Region 111 Washington, D. C.

20555 t

799 Roosevelt Road l

Glen Ellyn, IL 60137 (1)

NRC Resident inspector l

Director, Office of Management and Mr. Dennis Murdock Program Analysis Central lowa Power Cooperative U. S. Nuclear Regulatory Connission Box 2517 Washington, D. C. 20555 (1)

Cedar Rapids, IA 52406 U. S. Nuclear Regulatory Comnission Mr. Russ Gamble ATTN: Mr. M. Thadant Corn Belt Power Cooperative Phillips Building 1300 13th Street North Washington, D. C. 20555 Humboldt, IA 50548 INPO Records Center gg9gg4gg g 99g 1100 Circle 15 Parkway PDR ADOCK 05000331 rE AY Suite 1500 R

PDR 1

Atlanta, GA 30339 tQ on.one.unnta 1:nvrn,- o cuarr. 32.~r suw n<uad. naa, <nsa stau

  • a m e s..~n s a