ML20210T105: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:(Lgksf | {{#Wiki_filter:(Lgksf | ||
[f DISTRIBUTION: | [f I | ||
Docket File NRR | DISTRIBUTION: | ||
R. C. DeYoung, Assistant Director for Light Water Reactors, Group 1 EL | Docket File NRR Reading DEC 2 41975 CS Reading APCSB Reading Docket Nos. S l | ||
R. C. DeYoung, Assistant Director for Light Water Reactors, Group 1 EL l | |||
t AITIILIARY AND POWER CONVERSION SYSTEMS BRANCH, REQUEST POR J | |||
ADDITIONAL INFORMATION t | |||
Plant Name: WPPSS Nuclear Project No. 3 and No. 5 Licensing Stage: CP Docket Numbers: STN 50-508; STN 50-509 l | |||
Milentone Number: 12-02 Responsible Branch: LWR l-3 Project Manager: | |||
A. Bournia The Auxiliary and Power Conversion Systems Branch has reviewed Amendments 25 and 26 of the PSAR regarding design changes in the WPPSS 3 and 5 plants. | |||
Robert L. Tedesco, Assistant Director for Containment Safety | i Enclosed is our position in rerard to the proposed diesel fuel oil 6 | ||
storage tanks arrangement relative to fire protection of the essential equipment. | |||
Robert L. Tedesco, Assistant Director for Containment Safety Division of Technical Review | |||
==Enclosure:== | ==Enclosure:== | ||
As Stated cc: | |||
S. Hanauer, TA W. Mcdonald, MIPC R. Boyd, RL R. Heinessen, TR r | |||
V. Benaroya, APCSB | O. Parr, RL l | ||
A. Bournia, RL D. Fischer, AFCSB P. Matthews, APCSB | V. Benaroya, APCSB A. Bournia, RL i | ||
O721 751gg4 n C C. Lians, APCSB | D. Fischer, AFCSB l | ||
P. Matthews, APCSB h52l DOCK 05000508 O721 751gg4 n C C. Lians, APCSB F | |||
PDR D. Eisenhut, NRR i | |||
I i | I i | ||
APCS.B:C TR CS: | |||
APCSB:CS:T_R @APCSB:CS:T f._ | |||
APCSB:CS:T_R | o,,,c, | ||
* CLiang:mc g,PMAtth ys D | |||
r rte do | |||
CLiang:mc | .u...,* | ||
c 12/24 /75 12/2y/75 | |||
.l. | |||
/75 12p /75_ | |||
Form AEC.)l3 (Rev. 9 53) AECM 0240 | I Form AEC.)l3 (Rev. 9 53) AECM 0240 W u. s. oovEmmasEMT PalNTING OFFICES l,74 336. tSe | ||
- -}} | |||
Latest revision as of 01:11, 6 December 2024
| ML20210T105 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 12/24/1975 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Deyoung R Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-1661 NUDOCS 8605290721 | |
| Download: ML20210T105 (1) | |
Text
(Lgksf
[f I
DISTRIBUTION:
Docket File NRR Reading DEC 2 41975 CS Reading APCSB Reading Docket Nos. S l
R. C. DeYoung, Assistant Director for Light Water Reactors, Group 1 EL l
t AITIILIARY AND POWER CONVERSION SYSTEMS BRANCH, REQUEST POR J
ADDITIONAL INFORMATION t
Plant Name: WPPSS Nuclear Project No. 3 and No. 5 Licensing Stage: CP Docket Numbers: STN 50-508; STN 50-509 l
Milentone Number: 12-02 Responsible Branch: LWR l-3 Project Manager:
A. Bournia The Auxiliary and Power Conversion Systems Branch has reviewed Amendments 25 and 26 of the PSAR regarding design changes in the WPPSS 3 and 5 plants.
i Enclosed is our position in rerard to the proposed diesel fuel oil 6
storage tanks arrangement relative to fire protection of the essential equipment.
Robert L. Tedesco, Assistant Director for Containment Safety Division of Technical Review
Enclosure:
As Stated cc:
S. Hanauer, TA W. Mcdonald, MIPC R. Boyd, RL R. Heinessen, TR r
O. Parr, RL l
V. Benaroya, APCSB A. Bournia, RL i
D. Fischer, AFCSB l
P. Matthews, APCSB h52l DOCK 05000508 O721 751gg4 n C C. Lians, APCSB F
I i
APCS.B:C TR CS:
APCSB:CS:T_R @APCSB:CS:T f._
o,,,c,
- CLiang:mc g,PMAtth ys D
r rte do
.u...,*
c 12/24 /75 12/2y/75
.l.
/75 12p /75_
I Form AEC.)l3 (Rev. 9 53) AECM 0240 W u. s. oovEmmasEMT PalNTING OFFICES l,74 336. tSe
- -