W3P86-3331, Application for Amend to License NPF-38,revising Tech Specs Re DNBR Setpoints,Boron Dilution Requirements,Peak Linear Heat Generation Curve,Reactor Protective Instrumentation & Liquid & Gaseous Monitoring Instrumentation.Fee Paid: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:P N | {{#Wiki_filter:P N | ||
l 0UISI ANA / 317 BARONNESTREET P. O. BOX 60340 | |||
+ | |||
POWER & L1GHT NEW ORLEANS, LOUISIANA 70160 (504) 595-3100 UtTONlysYN october 1, 1986 W3P86-3331 3-A1.01.04 A4.05 QA Mr. George W. Knighton, Director PWR Project Directorate No. 7 Division of PWR Licensing-B Office of Nuclear Reactor Regulation Washington, D.C. 20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 26: | Line 28: | ||
==Dear Mr. Knighton:== | ==Dear Mr. Knighton:== | ||
Louisiana Power & Light hereby files an application for eight amendments to the Waterford 3 Technical Specifications. The amendments involve: | Louisiana Power & Light hereby files an application for eight amendments to the Waterford 3 Technical Specifications. The amendments involve: | ||
1. | |||
A revision to the CPC DNBR setpoint (NPF-38-43), | |||
2. | |||
Revisions to the COLSS out of service DNBR limit lines (NPF-38-44), | |||
3. | |||
Revisions to the boron dilution requirements in Modes 3-6 with and without one boron dilution alarm inoperable (NPF-38-45), | |||
4. | |||
A revision to the peak linear heat generation rate curve for COLSS out of service (NPF-38-46), | |||
LP&L has previously provided a summary of the Technical Specification change | 5. | ||
8610090444 861001 | A revision to the reactor protective instrumentation response times (NPF-38-47), | ||
6. | |||
A revision to the CEA insertion limits (NPF-38-48), | |||
7. | |||
A clarification to the required actions for liquid effluent monitoring instrumentation (NPF-38-49), and 8. | |||
A clarification to the required actions for gaseous ef fluent monitoring instrumentation (NPF-38-50). | |||
LP&L has previously provided a summary of the Technical Specification change t requests expected to be submitted prior to the first refueling outage. | |||
8610090444 861001 CO DR ADOCK 0500 2 | |||
"AN EQUAL OPPORTUNITY EMPLOYER" p [,) 01/dd # M C | |||
Page 2' W3P86-3331 Attached for your information is an updated schedule of the proposed changes. | Page 2' W3P86-3331 Attached for your information is an updated schedule of the proposed changes. | ||
Items 1-6 above constitute the Group D changes. Items 7-8 complete the Group H changes. With this. submittal all scheduled changes are complete. | Items 1-6 above constitute the Group D changes. | ||
The proposed changes do not involve an unreviewed safety question nor a significant hazards consideration. Should you have any questions or require additional information concerning the requested changes, please contact Mike Meisner at (504) 595-2832. | Items 7-8 complete the Group H changes. With this. submittal all scheduled changes are complete. | ||
Yours very truly, G. Dewease | The proposed changes do not involve an unreviewed safety question nor a significant hazards consideration. | ||
nior Vice President Nuclear Operations JGD/MJM/plm | Should you have any questions or require additional information concerning the requested changes, please contact Mike Meisner at (504) 595-2832. | ||
Yours very truly, d | |||
G. Dewease nior Vice President Nuclear Operations JGD/MJM/plm | |||
==Enclosures:== | ==Enclosures:== | ||
Listing of Potential Technical Specification Changes (Revision 6) | Listing of Potential Technical Specification Changes (Revision 6) | ||
NPF-38-43 NPF-38-44 NPF-38-45 NPF-38-46 NPF-38-47 NPF-38-48 NPF-38-49 NPF-38-50 Filing Fee, LP&L check #09-5442 cc: | NPF-38-43 NPF-38-44 NPF-38-45 NPF-38-46 NPF-38-47 NPF-38-48 NPF-38-49 NPF-38-50 Filing Fee, LP&L check #09-5442 cc: | ||
B.W. Churchill, W.M. Stevenson, R.D. Martin, J.H. Wilson,. | |||
Administrator Nuclear Energy Division (State of Louisiana), | Administrator Nuclear Energy Division (State of Louisiana), | ||
American Nuc1 car Insurers, NRC Resident Inspector's Office (W3) | American Nuc1 car Insurers, NRC Resident Inspector's Office (W3) | ||
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the matter of | UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the matter of | ||
) | |||
Louisiana Power & Light Company | ) | ||
Louisiana Power & Light Company | |||
Requests; that he is familiar with the content thereof; and that the matters set forth herein are true and correct to the best of his knowledge, information and belief. | ) Docket No. 50-382 Waterford 3 Steam Electric Station | ||
) | |||
. AFFIDAVIT J.G. Dewease, being duly sworn, hereby deposes and says that he is Senior Vice President, Nuclear Operations of Louisiana Power & Light Company; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Technical Specification Change Requests; that he is familiar with the content thereof; and that the i | |||
matters set forth herein are true and correct to the best of his knowledge, information and belief. | |||
WM | WM | ||
.G. Dewcase enior Vice President Nuclear Operations STATE OF LOUISIANA) | |||
) ss PARISH OF ORLEANS ) | |||
Subscribed and sworn to before me a Notary Publi | Subscribed and sworn to before me a Notary Publi nad or e Parish and State above named this Idh day of 1986. | ||
1986. | 0 UhLD f | ||
0 UhLD | lst Notary Public | ||
(. | (. | ||
My Commission expires | My Commission expires | ||
l | ( | ||
/' dLJ l | |||
{ | { | ||
t}} | t}} | ||
Latest revision as of 00:58, 6 December 2024
| ML20210U190 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/01/1986 |
| From: | Dewease J LOUISIANA POWER & LIGHT CO. |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20210U193 | List: |
| References | |
| W3P86-3331, NUDOCS 8610090444 | |
| Download: ML20210U190 (3) | |
Text
P N
l 0UISI ANA / 317 BARONNESTREET P. O. BOX 60340
+
POWER & L1GHT NEW ORLEANS, LOUISIANA 70160 (504) 595-3100 UtTONlysYN october 1, 1986 W3P86-3331 3-A1.01.04 A4.05 QA Mr. George W. Knighton, Director PWR Project Directorate No. 7 Division of PWR Licensing-B Office of Nuclear Reactor Regulation Washington, D.C. 20555
SUBJECT:
Waterford SES Unit 3 Docket No. 50-382 Technical Specification Change Requests NPF-38-43, NPF-38-44, NPF-38-45, NPF-38-46, NPF-38-47, NPF-38-48, NPF-38-49, NPF-38-50
Dear Mr. Knighton:
Louisiana Power & Light hereby files an application for eight amendments to the Waterford 3 Technical Specifications. The amendments involve:
1.
A revision to the CPC DNBR setpoint (NPF-38-43),
2.
Revisions to the COLSS out of service DNBR limit lines (NPF-38-44),
3.
Revisions to the boron dilution requirements in Modes 3-6 with and without one boron dilution alarm inoperable (NPF-38-45),
4.
A revision to the peak linear heat generation rate curve for COLSS out of service (NPF-38-46),
5.
A revision to the reactor protective instrumentation response times (NPF-38-47),
6.
A revision to the CEA insertion limits (NPF-38-48),
7.
A clarification to the required actions for liquid effluent monitoring instrumentation (NPF-38-49), and 8.
A clarification to the required actions for gaseous ef fluent monitoring instrumentation (NPF-38-50).
LP&L has previously provided a summary of the Technical Specification change t requests expected to be submitted prior to the first refueling outage.
8610090444 861001 CO DR ADOCK 0500 2
"AN EQUAL OPPORTUNITY EMPLOYER" p [,) 01/dd # M C
Page 2' W3P86-3331 Attached for your information is an updated schedule of the proposed changes.
Items 1-6 above constitute the Group D changes.
Items 7-8 complete the Group H changes. With this. submittal all scheduled changes are complete.
The proposed changes do not involve an unreviewed safety question nor a significant hazards consideration.
Should you have any questions or require additional information concerning the requested changes, please contact Mike Meisner at (504) 595-2832.
Yours very truly, d
G. Dewease nior Vice President Nuclear Operations JGD/MJM/plm
Enclosures:
Listing of Potential Technical Specification Changes (Revision 6)
NPF-38-43 NPF-38-44 NPF-38-45 NPF-38-46 NPF-38-47 NPF-38-48 NPF-38-49 NPF-38-50 Filing Fee, LP&L check #09-5442 cc:
B.W. Churchill, W.M. Stevenson, R.D. Martin, J.H. Wilson,.
Administrator Nuclear Energy Division (State of Louisiana),
American Nuc1 car Insurers, NRC Resident Inspector's Office (W3)
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the matter of
)
)
Louisiana Power & Light Company
) Docket No. 50-382 Waterford 3 Steam Electric Station
)
. AFFIDAVIT J.G. Dewease, being duly sworn, hereby deposes and says that he is Senior Vice President, Nuclear Operations of Louisiana Power & Light Company; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Technical Specification Change Requests; that he is familiar with the content thereof; and that the i
matters set forth herein are true and correct to the best of his knowledge, information and belief.
WM
.G. Dewcase enior Vice President Nuclear Operations STATE OF LOUISIANA)
) ss PARISH OF ORLEANS )
Subscribed and sworn to before me a Notary Publi nad or e Parish and State above named this Idh day of 1986.
0 UhLD f
lst Notary Public
(.
My Commission expires
(
/' dLJ l
{
t