W3P86-3331, Application for Amend to License NPF-38,revising Tech Specs Re DNBR Setpoints,Boron Dilution Requirements,Peak Linear Heat Generation Curve,Reactor Protective Instrumentation & Liquid & Gaseous Monitoring Instrumentation.Fee Paid: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:P N
{{#Wiki_filter:P N
                                                          +  P. O. BOX 60340 l 0UISI&ANA POWER      L1GHT/ 317NEW BARONNESTREET ORLEANS, LOUISIANA 70160 *    (504) 595-3100 UtTONlysYN october 1, 1986 W3P86-3331 3-A1.01.04 A4.05 QA Mr. George W. Knighton, Director PWR Project Directorate No. 7 Division of PWR Licensing-B Office of Nuclear Reactor Regulation Washington, D.C. 20555
l 0UISI ANA / 317 BARONNESTREET P. O. BOX 60340
+
POWER & L1GHT NEW ORLEANS, LOUISIANA 70160 (504) 595-3100 UtTONlysYN october 1, 1986 W3P86-3331 3-A1.01.04 A4.05 QA Mr. George W. Knighton, Director PWR Project Directorate No. 7 Division of PWR Licensing-B Office of Nuclear Reactor Regulation Washington, D.C. 20555


==SUBJECT:==
==SUBJECT:==
Line 26: Line 28:


==Dear Mr. Knighton:==
==Dear Mr. Knighton:==
Louisiana Power & Light hereby files an application for eight amendments to the Waterford 3 Technical Specifications. The amendments involve:
Louisiana Power & Light hereby files an application for eight amendments to the Waterford 3 Technical Specifications. The amendments involve:
: 1. A revision to the CPC DNBR setpoint (NPF-38-43),
1.
: 2. Revisions to the COLSS out of service DNBR limit lines (NPF-38-44),
A revision to the CPC DNBR setpoint (NPF-38-43),
: 3. Revisions to the boron dilution requirements in Modes 3-6 with and without one boron dilution alarm inoperable (NPF-38-45),
2.
: 4. A revision to the peak linear heat generation rate curve for COLSS out of service (NPF-38-46),
Revisions to the COLSS out of service DNBR limit lines (NPF-38-44),
: 5. A revision to the reactor protective instrumentation response times (NPF-38-47),
3.
: 6. A revision to the CEA insertion limits (NPF-38-48),
Revisions to the boron dilution requirements in Modes 3-6 with and without one boron dilution alarm inoperable (NPF-38-45),
: 7. A clarification to the required actions for liquid effluent monitoring instrumentation (NPF-38-49), and
4.
: 8. A clarification to the required actions for gaseous ef fluent monitoring instrumentation (NPF-38-50).
A revision to the peak linear heat generation rate curve for COLSS out of service (NPF-38-46),
LP&L has previously provided a summary of the Technical Specification change             t requests expected to be submitted prior to the first refueling outage.                 -
5.
8610090444 861001 2                                                            CO DR   ADOCK 0500 "AN EQUAL OPPORTUNITY EMPLOYER" p [,) 01/dd # M C
A revision to the reactor protective instrumentation response times (NPF-38-47),
6.
A revision to the CEA insertion limits (NPF-38-48),
7.
A clarification to the required actions for liquid effluent monitoring instrumentation (NPF-38-49), and 8.
A clarification to the required actions for gaseous ef fluent monitoring instrumentation (NPF-38-50).
LP&L has previously provided a summary of the Technical Specification change t requests expected to be submitted prior to the first refueling outage.
8610090444 861001 CO DR ADOCK 0500 2
"AN EQUAL OPPORTUNITY EMPLOYER" p [,) 01/dd # M C


Page 2' W3P86-3331 Attached for your information is an updated schedule of the proposed changes.
Page 2' W3P86-3331 Attached for your information is an updated schedule of the proposed changes.
Items 1-6 above constitute the Group D changes. Items 7-8 complete the Group H changes. With this. submittal all scheduled changes are complete.
Items 1-6 above constitute the Group D changes.
The proposed changes do not involve an unreviewed safety question nor a significant hazards consideration. Should you have any questions or require additional information concerning the requested changes, please contact Mike Meisner at (504) 595-2832.
Items 7-8 complete the Group H changes. With this. submittal all scheduled changes are complete.
Yours very truly, G. Dewease d
The proposed changes do not involve an unreviewed safety question nor a significant hazards consideration.
nior Vice President Nuclear Operations JGD/MJM/plm
Should you have any questions or require additional information concerning the requested changes, please contact Mike Meisner at (504) 595-2832.
Yours very truly, d
G. Dewease nior Vice President Nuclear Operations JGD/MJM/plm


==Enclosures:==
==Enclosures:==
Listing of Potential Technical Specification Changes (Revision 6)
Listing of Potential Technical Specification Changes (Revision 6)
NPF-38-43 NPF-38-44 NPF-38-45 NPF-38-46 NPF-38-47 NPF-38-48 NPF-38-49 NPF-38-50 Filing Fee, LP&L check #09-5442 cc: B.W. Churchill, W.M. Stevenson, R.D. Martin, J.H. Wilson,.
NPF-38-43 NPF-38-44 NPF-38-45 NPF-38-46 NPF-38-47 NPF-38-48 NPF-38-49 NPF-38-50 Filing Fee, LP&L check #09-5442 cc:
B.W. Churchill, W.M. Stevenson, R.D. Martin, J.H. Wilson,.
Administrator Nuclear Energy Division (State of Louisiana),
Administrator Nuclear Energy Division (State of Louisiana),
American Nuc1 car Insurers, NRC Resident Inspector's Office (W3)
American Nuc1 car Insurers, NRC Resident Inspector's Office (W3)


UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the matter of                                   )
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the matter of
                                                    )
)
Louisiana Power & Light Company                     ) Docket No. 50-382 Waterford 3 Steam Electric Station                 )
)
                                . AFFIDAVIT J.G. Dewease, being duly sworn, hereby deposes and says that he is Senior Vice President, Nuclear Operations of Louisiana Power & Light Company; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Technical Specification Change i
Louisiana Power & Light Company
Requests; that he is familiar with the content thereof; and that the matters set forth herein are true and correct to the best of his knowledge, information and belief.
) Docket No. 50-382 Waterford 3 Steam Electric Station
)
. AFFIDAVIT J.G. Dewease, being duly sworn, hereby deposes and says that he is Senior Vice President, Nuclear Operations of Louisiana Power & Light Company; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Technical Specification Change Requests; that he is familiar with the content thereof; and that the i
matters set forth herein are true and correct to the best of his knowledge, information and belief.
WM
WM
                                        .G. Dewcase enior Vice President Nuclear Operations STATE OF LOUISIANA)
.G. Dewcase enior Vice President Nuclear Operations STATE OF LOUISIANA)
                    ) ss PARISH OF ORLEANS )
) ss PARISH OF ORLEANS )
Subscribed and sworn to before me a Notary Publi       nad or       e Parish and State above named this   Idh         day of                             ,
Subscribed and sworn to before me a Notary Publi nad or e Parish and State above named this Idh day of 1986.
1986.
0 UhLD f
0 UhLD             f Notary Public lst
lst Notary Public
(.
(.
My Commission expires   (         /' dLJ                   .
My Commission expires
l
(
/' dLJ l
{
{
t}}
t}}

Latest revision as of 00:58, 6 December 2024

Application for Amend to License NPF-38,revising Tech Specs Re DNBR Setpoints,Boron Dilution Requirements,Peak Linear Heat Generation Curve,Reactor Protective Instrumentation & Liquid & Gaseous Monitoring Instrumentation.Fee Paid
ML20210U190
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/01/1986
From: Dewease J
LOUISIANA POWER & LIGHT CO.
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML20210U193 List:
References
W3P86-3331, NUDOCS 8610090444
Download: ML20210U190 (3)


Text

P N

l 0UISI ANA / 317 BARONNESTREET P. O. BOX 60340

+

POWER & L1GHT NEW ORLEANS, LOUISIANA 70160 (504) 595-3100 UtTONlysYN october 1, 1986 W3P86-3331 3-A1.01.04 A4.05 QA Mr. George W. Knighton, Director PWR Project Directorate No. 7 Division of PWR Licensing-B Office of Nuclear Reactor Regulation Washington, D.C. 20555

SUBJECT:

Waterford SES Unit 3 Docket No. 50-382 Technical Specification Change Requests NPF-38-43, NPF-38-44, NPF-38-45, NPF-38-46, NPF-38-47, NPF-38-48, NPF-38-49, NPF-38-50

Dear Mr. Knighton:

Louisiana Power & Light hereby files an application for eight amendments to the Waterford 3 Technical Specifications. The amendments involve:

1.

A revision to the CPC DNBR setpoint (NPF-38-43),

2.

Revisions to the COLSS out of service DNBR limit lines (NPF-38-44),

3.

Revisions to the boron dilution requirements in Modes 3-6 with and without one boron dilution alarm inoperable (NPF-38-45),

4.

A revision to the peak linear heat generation rate curve for COLSS out of service (NPF-38-46),

5.

A revision to the reactor protective instrumentation response times (NPF-38-47),

6.

A revision to the CEA insertion limits (NPF-38-48),

7.

A clarification to the required actions for liquid effluent monitoring instrumentation (NPF-38-49), and 8.

A clarification to the required actions for gaseous ef fluent monitoring instrumentation (NPF-38-50).

LP&L has previously provided a summary of the Technical Specification change t requests expected to be submitted prior to the first refueling outage.

8610090444 861001 CO DR ADOCK 0500 2

"AN EQUAL OPPORTUNITY EMPLOYER" p [,) 01/dd # M C

Page 2' W3P86-3331 Attached for your information is an updated schedule of the proposed changes.

Items 1-6 above constitute the Group D changes.

Items 7-8 complete the Group H changes. With this. submittal all scheduled changes are complete.

The proposed changes do not involve an unreviewed safety question nor a significant hazards consideration.

Should you have any questions or require additional information concerning the requested changes, please contact Mike Meisner at (504) 595-2832.

Yours very truly, d

G. Dewease nior Vice President Nuclear Operations JGD/MJM/plm

Enclosures:

Listing of Potential Technical Specification Changes (Revision 6)

NPF-38-43 NPF-38-44 NPF-38-45 NPF-38-46 NPF-38-47 NPF-38-48 NPF-38-49 NPF-38-50 Filing Fee, LP&L check #09-5442 cc:

B.W. Churchill, W.M. Stevenson, R.D. Martin, J.H. Wilson,.

Administrator Nuclear Energy Division (State of Louisiana),

American Nuc1 car Insurers, NRC Resident Inspector's Office (W3)

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the matter of

)

)

Louisiana Power & Light Company

) Docket No. 50-382 Waterford 3 Steam Electric Station

)

. AFFIDAVIT J.G. Dewease, being duly sworn, hereby deposes and says that he is Senior Vice President, Nuclear Operations of Louisiana Power & Light Company; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Technical Specification Change Requests; that he is familiar with the content thereof; and that the i

matters set forth herein are true and correct to the best of his knowledge, information and belief.

WM

.G. Dewcase enior Vice President Nuclear Operations STATE OF LOUISIANA)

) ss PARISH OF ORLEANS )

Subscribed and sworn to before me a Notary Publi nad or e Parish and State above named this Idh day of 1986.

0 UhLD f

lst Notary Public

(.

My Commission expires

(

/' dLJ l

{

t