ML20211G402: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
  . .
.
              *
.
      .
*
                t
.
                                                                                                        l
t
                                                  August 25,1999
August 25,1999
        Mr. Oliver D. Kingsley
Mr. Oliver D. Kingsley
        President, Nuclear Generation Group
President, Nuclear Generation Group
        Commonwealth Edison Company
Commonwealth Edison Company
        ATTN: Regulatory Services
ATTN: Regulatory Services
        Executive Towers West lil                                                                       l
Executive Towers West lil
        1400 Opus Place, Suite 500
1400 Opus Place, Suite 500
        Downers Grove,IL 60515
Downers Grove,IL 60515
        SUBJECT:         BYRON INSPECTION REPORT 50-454/99010(DRP); 50-455/99010(DRP)
SUBJECT:
        Dear Mr. Kingsley:
BYRON INSPECTION REPORT 50-454/99010(DRP); 50-455/99010(DRP)
        On August 2,1999, the NRC completed an inspection at the Byron 1 and 2 reactor facilities.     i
Dear Mr. Kingsley:
        The enclosed report presents the results of that inspection.
On August 2,1999, the NRC completed an inspection at the Byron 1 and 2 reactor facilities.
                                                                                                        l
i
        Dunng this inspection period, control room operations were conducted in a safe, professional,   i
The enclosed report presents the results of that inspection.
        and controlled manner. We observed that operators generally adhered to the station's           l
Dunng this inspection period, control room operations were conducted in a safe, professional,
        standards for control room conduct, procedural adherence, annunciator response, and use of     l
i
        three-way communications. We also noted that observed maintenance activities were
and controlled manner. We observed that operators generally adhered to the station's
        coniucted well. Maintenance personnel were knowledgeable of the tasks and professionally       i
standards for control room conduct, procedural adherence, annunciator response, and use of
        completed tne work. In particular, maintenance associated with the replacement of a degraded
three-way communications. We also noted that observed maintenance activities were
        cell in the Unit 2 train B safety-related 125 volt battery was planned and executed well.
coniucted well. Maintenance personnel were knowledgeable of the tasks and professionally
        We identified that appropriate post maintenance testing requirements were not incorporated
completed tne work. In particular, maintenance associated with the replacement of a degraded
        into maintenance work instructions for the Unit 2 diesel driven auxiliary feedwater pump. The
cell in the Unit 2 train B safety-related 125 volt battery was planned and executed well.
        testing performed fol!owing replacement of control power diodes in the pump's control circuit
We identified that appropriate post maintenance testing requirements were not incorporated
        was not adequate to demonstrate that the control circuit would have performed as designed.
into maintenance work instructions for the Unit 2 diesel driven auxiliary feedwater pump. The
        We, also, noted that your corrective action process was not effective to preclude similar
testing performed fol!owing replacement of control power diodes in the pump's control circuit
        inadequate testing of an essential service water make-up pump 4 weeks later.
was not adequate to demonstrate that the control circuit would have performed as designed.
        We have also observed that station personnel have missed prior opportunities to identify
We, also, noted that your corrective action process was not effective to preclude similar
        multiple rnaterial condition deficiencies in the plant and have failed to enter those material
inadequate testing of an essential service water make-up pump 4 weeks later.
        condition deficiencies into the your corrective maintenance program for repairs. Although the
We have also observed that station personnel have missed prior opportunities to identify
        safety consequences of these deficiencies were minor, if left uncorrected, these problems could
multiple rnaterial condition deficiencies in the plant and have failed to enter those material
        potentially impact the ability of the systems to perform their required function.
condition deficiencies into the your corrective maintenance program for repairs. Although the
      9908310252 990825
safety consequences of these deficiencies were minor, if left uncorrected, these problems could
      PDR
potentially impact the ability of the systems to perform their required function.
      G
9908310252 990825
              ADOCK 05000454
PDR
                                PDR
ADOCK 05000454
G
PDR
L
L


.- ..
.-
              -
..
      .
-
                                                                                                                                    i
.
        O. Kingsley                                                   -2-
i
        Based on the results of this inspection, the NRC has determined that one violation of NRC
O. Kingsley
        requirements occurred. This violation is being treated as a Non-Cited Violation (NCV),
-2-
        consistent with Appendix C of the Enforcement Policy. The NCV is described in the subject
Based on the results of this inspection, the NRC has determined that one violation of NRC
        inspection report. If you contest the violation or severity level of the NCV, you should provide a
requirements occurred. This violation is being treated as a Non-Cited Violation (NCV),
        response within 30 days of the date of this inspection report, with the basis for your denial, to
consistent with Appendix C of the Enforcement Policy. The NCV is described in the subject
        the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC '
inspection report. If you contest the violation or severity level of the NCV, you should provide a
        20555-0001, with copies to the Regional Administrator, Region Ill, and the Director, Office of
response within 30 days of the date of this inspection report, with the basis for your denial, to
        Enforcement, United States Nuclear Re'gulatory Commission, Washington, DC 20555-0001.
the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC '
        In accordance with 10 CFR 2.790 of the NRC's '' Rules of Practice," a copy of this letter, its
20555-0001, with copies to the Regional Administrator, Region Ill, and the Director, Office of
        enclosure, and your response, if you choose to provide one, will be placed in the NRC Public
Enforcement, United States Nuclear Re'gulatory Commission, Washington, DC 20555-0001.
        Document Room.
In accordance with 10 CFR 2.790 of the NRC's '' Rules of Practice," a copy of this letter, its
        We will gladly discuss any questions you have concerning this inspection.
enclosure, and your response, if you choose to provide one, will be placed in the NRC Public
                                                                    Sincerely,
Document Room.
                                                                    /s/ Michael J. Jordan
We will gladly discuss any questions you have concerning this inspection.
                                                                    Michael J. Jordan, Chief
Sincerely,
                                                                    Reactor Projects Branch 3
/s/ Michael J. Jordan
        Docket Nos. 50-454; 50-455
Michael J. Jordan, Chief
        License Nos. NPF-37; NPF-66
Reactor Projects Branch 3
        Enclosure:         Inspection Report 50-454/99010(DRP);
Docket Nos. 50-454; 50-455
                              50-455/99010(DRP)
License Nos. NPF-37; NPF-66
        cc w/ encl:       D. Helwig, Senior Vice President, Nuclear Services
Enclosure:
                          C. Crane, Senior Vice President, Nuclear Operations
Inspection Report 50-454/99010(DRP);
                          H. Stanley, Vice President, Nuclear Operations
50-455/99010(DRP)
                          R. Krich, Vice President, Regulatory Services
cc w/ encl:
                          DCD - Licensing
D. Helwig, Senior Vice President, Nuclear Services
                          W. Levis, Site Vice President
C. Crane, Senior Vice President, Nuclear Operations
                          R. Lopriore, Station Manager
H. Stanley, Vice President, Nuclear Operations
                          B. Adams, Regulatory Assurance Manager
R. Krich, Vice President, Regulatory Services
                          M. Aguilar, Assistant Attomey General
DCD - Licensing
                          State Liaison Officer
W. Levis, Site Vice President
                          State Liaison Officer, State of Wisconsin
R. Lopriore, Station Manager
                          Chairman, Illinois Commerce Commission
B. Adams, Regulatory Assurance Manager
        DOCUMENT NAME: G:\BYRO\BYR99010.DRP
M. Aguilar, Assistant Attomey General
        To receive a copy of this document, Indicate in the box: "C" = Copy w/o attach /enci"E" = Copy w/ attach /enel"N" = No copy
State Liaison Officer
          OFFICE         Rlil:DRP           f         Rill:DRP         nn     lE                       l                       l I
State Liaison Officer, State of Wisconsin
          NAME           Tongue / con"               Jordan P)V!/                                                                   !
Chairman, Illinois Commerce Commission
          DATE           08/24/99                     08/M/99           "
DOCUMENT NAME: G:\\BYRO\\BYR99010.DRP
                                                                                                                                      l
To receive a copy of this document, Indicate in the box: "C" = Copy w/o attach /enci"E" = Copy w/ attach /enel"N" = No copy
                                                      OFFICIAL RECORD COPY                                                         ]
OFFICE
                                                                                                                                    1
Rlil:DRP
f
Rill:DRP
nn
lE
l
l
I
NAME
Tongue / con"
Jordan P)V!/
DATE
08/24/99
08/M/99
"
OFFICIAL RECORD COPY
]
1


... . .-
...
                    .
. .-
          , -
, -
            O, Kingsley '                 -3-
.
              Distribution:
O, Kingsley '
            COT (E-Mail)
-3-
              RPC (E-Mail)
Distribution:
            GFD (Project Mgr.) (E-Mail)
COT (E-Mail)
            J. Caldwell, Rlll w/ encl
RPC (E-Mail)
              B. Clayton, Rlli w/enct
GFD (Project Mgr.) (E-Mail)
              SRI Byron w/enci
J. Caldwell, Rlll w/ encl
              DRP w/ encl
B. Clayton, Rlli w/enct
              DRS w/ encl
SRI Byron w/enci
              Rill PRR w/enci
DRP w/ encl
            ' PUBLIC IE-01 w/ encl
DRS w/ encl
              Docket File w/enci
Rill PRR w/enci
              GREENS
' PUBLIC IE-01 w/ encl
              LEO (E-Mail)
Docket File w/enci
              DOCDESK (E-Mail)
GREENS
                                                l
LEO (E-Mail)
                                              ,
DOCDESK (E-Mail)
                                    310001
,
                                                i
310001
                                              )
)
      9 m
9
                                                4
m
                                                j
4
j
}}
}}

Latest revision as of 23:21, 5 December 2024

Forwards Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted
ML20211G402
Person / Time
Site: Byron  
Issue date: 08/25/1999
From: Jordan M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20211G405 List:
References
50-454-99-10, 50-455-99-10, NUDOCS 9908310252
Download: ML20211G402 (3)


See also: IR 05000454/1999010

Text

-

.

.

.

t

August 25,1999

Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West lil

1400 Opus Place, Suite 500

Downers Grove,IL 60515

SUBJECT:

BYRON INSPECTION REPORT 50-454/99010(DRP); 50-455/99010(DRP)

Dear Mr. Kingsley:

On August 2,1999, the NRC completed an inspection at the Byron 1 and 2 reactor facilities.

i

The enclosed report presents the results of that inspection.

Dunng this inspection period, control room operations were conducted in a safe, professional,

i

and controlled manner. We observed that operators generally adhered to the station's

standards for control room conduct, procedural adherence, annunciator response, and use of

three-way communications. We also noted that observed maintenance activities were

coniucted well. Maintenance personnel were knowledgeable of the tasks and professionally

completed tne work. In particular, maintenance associated with the replacement of a degraded

cell in the Unit 2 train B safety-related 125 volt battery was planned and executed well.

We identified that appropriate post maintenance testing requirements were not incorporated

into maintenance work instructions for the Unit 2 diesel driven auxiliary feedwater pump. The

testing performed fol!owing replacement of control power diodes in the pump's control circuit

was not adequate to demonstrate that the control circuit would have performed as designed.

We, also, noted that your corrective action process was not effective to preclude similar

inadequate testing of an essential service water make-up pump 4 weeks later.

We have also observed that station personnel have missed prior opportunities to identify

multiple rnaterial condition deficiencies in the plant and have failed to enter those material

condition deficiencies into the your corrective maintenance program for repairs. Although the

safety consequences of these deficiencies were minor, if left uncorrected, these problems could

potentially impact the ability of the systems to perform their required function.

9908310252 990825

PDR

ADOCK 05000454

G

PDR

L

.-

..

-

.

i

O. Kingsley

-2-

Based on the results of this inspection, the NRC has determined that one violation of NRC

requirements occurred. This violation is being treated as a Non-Cited Violation (NCV),

consistent with Appendix C of the Enforcement Policy. The NCV is described in the subject

inspection report. If you contest the violation or severity level of the NCV, you should provide a

response within 30 days of the date of this inspection report, with the basis for your denial, to

the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC '

20555-0001, with copies to the Regional Administrator, Region Ill, and the Director, Office of

Enforcement, United States Nuclear Re'gulatory Commission, Washington, DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's Rules of Practice," a copy of this letter, its

enclosure, and your response, if you choose to provide one, will be placed in the NRC Public

Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/s/ Michael J. Jordan

Michael J. Jordan, Chief

Reactor Projects Branch 3

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosure:

Inspection Report 50-454/99010(DRP);

50-455/99010(DRP)

cc w/ encl:

D. Helwig, Senior Vice President, Nuclear Services

C. Crane, Senior Vice President, Nuclear Operations

H. Stanley, Vice President, Nuclear Operations

R. Krich, Vice President, Regulatory Services

DCD - Licensing

W. Levis, Site Vice President

R. Lopriore, Station Manager

B. Adams, Regulatory Assurance Manager

M. Aguilar, Assistant Attomey General

State Liaison Officer

State Liaison Officer, State of Wisconsin

Chairman, Illinois Commerce Commission

DOCUMENT NAME: G:\\BYRO\\BYR99010.DRP

To receive a copy of this document, Indicate in the box: "C" = Copy w/o attach /enci"E" = Copy w/ attach /enel"N" = No copy

OFFICE

Rlil:DRP

f

Rill:DRP

nn

lE

l

l

I

NAME

Tongue / con"

Jordan P)V!/

DATE

08/24/99

08/M/99

"

OFFICIAL RECORD COPY

]

1

...

. .-

, -

.

O, Kingsley '

-3-

Distribution:

COT (E-Mail)

RPC (E-Mail)

GFD (Project Mgr.) (E-Mail)

J. Caldwell, Rlll w/ encl

B. Clayton, Rlli w/enct

SRI Byron w/enci

DRP w/ encl

DRS w/ encl

Rill PRR w/enci

' PUBLIC IE-01 w/ encl

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

,

310001

)

9

m

4

j