ML20211K757: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
  % .
%
                                              JUN 251986
.
        Docket No. 50-254
JUN 251986
        Docket No. 50-265
Docket No. 50-254
        Corrmonwealth Edison Company
Docket No. 50-265
        ATTN: Mr. Cordell Reed
Corrmonwealth Edison Company
                Vice President
ATTN: Mr. Cordell Reed
        Post Office Box 767
Vice President
        Chicago, IL 60690
Post Office Box 767
        Gentlemen:
Chicago, IL 60690
        This refers to the routine safety inspection conducted by Mr. R. N. Sutphin
Gentlemen:
        of this office on May 28-30 and June 2-5, 1986, of activities at Quad Cities
This refers to the routine safety inspection conducted by Mr. R. N. Sutphin
        Nuclear Power Station Units 1 and 2 authorized by NRC License Nos. DPR-29 and
of this office on May 28-30 and June 2-5, 1986, of activities at Quad Cities
        DPR-30. It also refers to the discussion of our findings with Mr. T. Tamlyn
Nuclear Power Station Units 1 and 2 authorized by NRC License Nos. DPR-29 and
        and others of your staff at the conclusion of the inspection.
DPR-30. It also refers to the discussion of our findings with Mr. T. Tamlyn
        The enclosed copy of our inspection report identifies areas examined during
and others of your staff at the conclusion of the inspection.
        the inspection. Within these areas, the inspection consisted of a selective
The enclosed copy of our inspection report identifies areas examined during
        examination of procedures and representative records, observations, and
the inspection. Within these areas, the inspection consisted of a selective
        interviews with personnel.
examination of procedures and representative records, observations, and
        No violations of NRC requirements were identified during this inspection.
interviews with personnel.
        In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
No violations of NRC requirements were identified during this inspection.
        this letter and the enclosed inspection report will be placed in the NRC
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
        Public Document Room.
this letter and the enclosed inspection report will be placed in the NRC
        We will gladly discuss any questions you have concerning this inspection.
Public Document Room.
                                                  Sincerely,
We will gladly discuss any questions you have concerning this inspection.
                49 0eg%54                           ~
Sincerely,
                                                      - .i  by-A L'l 0,'O. DrriG *
49 eg%54
      egd%oc6
~
      P
by-A L'l 0,'O. DrriG *
                          PDR
- .i
                                                  J. J. Harrison, Chief
egd%oc6 0
      g
PDR
                                                  Engineering Branch
P
        Enclosures: Inspection Report
J. J. Harrison, Chief
          No.50-254/86010(DRS),
g
          No.50-265/86009(DRS)
Engineering Branch
        See Attached Distribution
Enclosures:
          I
Inspection Report
        / 4
No.50-254/86010(DRS),
                                II
No.50-265/86009(DRS)
                                    h        RIII             RII
See Attached Distribution
        Suphin/jlk           Hawkins       Boyd 30         H ripon               gh
I
        6/ /86                               p 20
II h
                                                              dto                  )
RIII
                                                                                    pCcol
RII
/ 4
Suphin/jlk
Hawkins
Boyd 30
H ripon
gh
20
dto
)
6/ /86
p
pCcol


  -
-
      .
.. .
        . .
,
    ,
JUN E 51986
            Commonwealth Edison Company       2 JUN E 51986
Commonwealth Edison Company
            cc w/ enclosure:
2
            D. L. Farrar, Director
cc w/ enclosure:
              of Nuclear Licensing
D. L. Farrar, Director
            R. L. Bax, Plant Manager
of Nuclear Licensing
            DCS/RSB (RIDS)
R. L. Bax, Plant Manager
            Licensing Fee Management Branch
DCS/RSB (RIDS)
            Resident Inspector, RIII
Licensing Fee Management Branch
            Phyllis Dunton, Attorney
Resident Inspector, RIII
              General's Office, Environmental
Phyllis Dunton, Attorney
              Control Division
General's Office, Environmental
Control Division
l
l
i
i

Latest revision as of 22:02, 5 December 2024

Forwards Safety Insp Repts 50-254/86-10 & 50-265/86-09 on 860528-30 & 0602-05.No Violations Noted
ML20211K757
Person / Time
Site: Quad Cities  
Issue date: 06/25/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20211K762 List:
References
NUDOCS 8606300249
Download: ML20211K757 (2)


See also: IR 05000254/1986010

Text

-

%

.

JUN 251986

Docket No. 50-254

Docket No. 50-265

Corrmonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. N. Sutphin

of this office on May 28-30 and June 2-5, 1986, of activities at Quad Cities

Nuclear Power Station Units 1 and 2 authorized by NRC License Nos. DPR-29 and

DPR-30. It also refers to the discussion of our findings with Mr. T. Tamlyn

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

49 eg%54

~

by-A L'l 0,'O. DrriG *

- .i

egd%oc6 0

PDR

P

J. J. Harrison, Chief

g

Engineering Branch

Enclosures:

Inspection Report

No.50-254/86010(DRS),

No.50-265/86009(DRS)

See Attached Distribution

I

II h

RIII

RII

/ 4

Suphin/jlk

Hawkins

Boyd 30

H ripon

gh

20

dto

)

6/ /86

p

pCcol

-

.. .

,

JUN E 51986

Commonwealth Edison Company

2

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

R. L. Bax, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

l

i

l

l

1

l

I

1