ML20211M056: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_     _ _ _ _ _ _ _                   .___ - .
{{#Wiki_filter:_
                                                      _ _ _ _ _ _ _ _ _ _ _ _ _ , - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _
l -     .4
.___ - .
(                                                                                                               DEC 2                 1986
_ _ _ _ _ _ _ _ _ _ _ _ _ , - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
l -
.4
(
DEC 2
1986
/
1
1
I
I
                                                                                                                                                                    /
Docket No. 50-424
            Docket No. 50-424
License No. CPPR-108
          License No. CPPR-108
l
l
          Gporgia Power Company
Gporgia Power Company
          MTTH: Mr. J. H. Miller, Jr.
MTTH: Mr. J. H. Miller, Jr.
                                      President                                                                                                                                 l
President
            P. O. Box 4545
l
          Atlanta, GA 30302
P. O. Box 4545
          Centlemen:
Atlanta, GA 30302
            SUBJECT: NRC INSPECTION REPORT N0. 50-42f/36-88
Centlemen:
          This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
SUBJECT: NRC INSPECTION REPORT N0. 50-42f/36-88
            W. H. Miller, Jr., on October 6-10, 1986.                                                                                 The inspection included a review of
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
            activities authorized for your Vogtle facility.                                                                                   At the conclusion of the
W. H. Miller, Jr., on October 6-10, 1986.
            inspection, the findings were discussed with those members of your staff
The inspection included a review of
            identified in the enclosed inspection report.
activities authorized for your Vogtle facility.
          Areas examined during the inspection are identified in the report. Within these
At the conclusion of the
            areas, the inspection consisted of selective examinations of procedures and
inspection, the findings were discussed with those members of your staff
            representative records, interviews with personnel, and observation of activities
identified in the enclosed inspection report.
            in progress.
Areas examined during the inspection are identified in the report. Within these
            Within the scope of the inspection, no violations or deviations were identified.
areas, the inspection consisted of selective examinations of procedures and
            The enclosed Inspection Report documents an oral commitment (see report paragraph
representative records, interviews with personnel, and observation of activities
            Section 2) made by a licensee representative and discussed in the exit interview.
in progress.
            If your understanding of this conunitment differs from the report statements,
Within the scope of the inspection, no violations or deviations were identified.
            please inform this office promptly.
The enclosed Inspection Report documents an oral commitment (see report paragraph
            Should you have any questions concerning this letter, please contact us.
Section 2) made by a licensee representative and discussed in the exit interview.
                                                                                                                      Sincerely,
If your understanding of this conunitment differs from the report statements,
                                                                                                                      Virgil L. Brownlee, Chief
please inform this office promptly.
                                                                                                                      Reactor Projects Branch 3
Should you have any questions concerning this letter, please contact us.
                                                                                                                      Division of Reactor Projects
Sincerely,
            Enclosure:
Virgil L. Brownlee, Chief
            NRC Inspection Report
Reactor Projects Branch 3
            cc w/ encl:                 (See page 2)
Division of Reactor Projects
                          8612160233 861202 4
Enclosure:
                                    ADOCK 050
NRC Inspection Report
                          {DR
cc w/ encl:
                                                                                                                                                                      8
(See page 2)
                                                                                                                                                                    I   \
8612160233 861202
                                                                                                                                                                          zee !
ADOCK 050
    ..
4
                              .. . -                                 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
{DR
8
I \\
zee !
..
.. . -
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .


    4
4
.
.
.
Georgia Power Company
2
DEC 2
15
cp w/ encl:
14. P. O'Reilly, Senior Vice President
Nuclear Operations
J.E.Conway,SeniorVicePresident&
Project Director
Of 0. Foster, Vice President, Project
Support
#. D. Rice, Vice President, Project
Engineering
# H. Pinson, Vice President, Project
Construction
/ T. Beckham, Vice President &
General Manager - Operations
(Jt'. A. Thomas, Vice President,
Licensing
I,0. S. Read, General Manager,
Quality Assurance
(/l W. Hayes, Vogtle Quality
Assurance Menager
tZ C. Ramsey, Manager -
Readiness Feview
$( B. Bockho'.d, General Manager,
Nuclear Outrations
/
(L. Gucwa, Harlager, Nuclear Safety
dnd Lice.13}ng
g H. Googe, Project
Construction Manager
GrD. Groover, Quality'
Assurance Site Manager -
Construction
k A. Bailey, Project Licensing -
Manager
(VF. Trowbridge, Esq. , Shaw,
Pittman, Potts and Trowbridge
[prW. Churchill, Esq. , Shaw,
fittman,PottsandTrowbridge
E. L. Blake, Jr. , Esq. , Shaw,
, fittman, Potts and Trowbridge
W. E. Joiner, Troutman, Sanders,
J.ockerman and Ashmore
L(. G. Ledbetter, Commissioner,
,)epartmentofHumanResources
LC. H. Badger, Office of Planning
6(andBudget
Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
(cc w/ encl cont'd - see page 3)
.
_
-
.
.
-
-
.
-
.-
.
.
            .
  .
      Georgia Power Company                  2
                                                  DEC 2 15
      cp w/ encl:
    14. P. O'Reilly, Senior Vice President
          Nuclear Operations
    J.E.Conway,SeniorVicePresident&
          Project Director
      Of 0. Foster, Vice President, Project
          Support
    #. D. Rice, Vice President, Project
          Engineering
    # H. Pinson, Vice President, Project
          Construction
      / T. Beckham, Vice President &
          General Manager - Operations
    (Jt'. A. Thomas, Vice President,
          Licensing
    I,0. S. Read, General Manager,
          Quality Assurance
      (/l W. Hayes, Vogtle Quality
          Assurance Menager
    tZ C. Ramsey, Manager -
          Readiness Feview
      $( B. Bockho'.d, General Manager,
          Nuclear Outrations
    (L./ Gucwa, Harlager, Nuclear Safety
          dnd Lice.13}ng
    g H. Googe, Project
          Construction Manager
      GrD. Groover, Quality'
          Assurance Site Manager -
          Construction
      k A. Bailey, Project Licensing -
          Manager
    (VF. Trowbridge, Esq. , Shaw,
          Pittman, Potts and Trowbridge
    [prW. Churchill, Esq. , Shaw,
        fittman,PottsandTrowbridge
      E. L. Blake, Jr. , Esq. , Shaw,
      , fittman, Potts and Trowbridge
      W. E. Joiner, Troutman, Sanders,
        J.ockerman and Ashmore
    L(. G. Ledbetter, Commissioner,
    ,)epartmentofHumanResources
    LC. H. Badger, Office of Planning
      6(andBudget
            Kirkland, III, Counsel,
          Office of the Consumer's Utility
          Council
      (cc w/ encl cont'd - see page 3)
                                    _      .  -


    6
6
a
a
        .
.
  .
.
                                                          2 M
2
    Georgia Power Company                     3
M
    cc w/enci - cont'd
Georgia Power Company
    B/Feig, Georgians Against
3
      JiuclearEnergy
cc w/enci - cont'd
    tr. B. Margulies, Esq. , Chairman,
B/Feig, Georgians Against
        Atomic Safety and Licensing Board
JiuclearEnergy
        Ppnel
tr. B. Margulies, Esq. , Chairman,
    pf. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
        Atomic Safety and Licensing Board
Ppnel
      fanel
pf. O. H. Paris, Administrative Judge
    F. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
        Atomic Safety and Licensing Board
fanel
    M. P.PanelGarde, Citizens Clinic, Director
F. A. Linenberger, Jr., Administrative Judge
        Government Accountability Project
Atomic Safety and Licensing Board
    b c w/ encl:
M. Panel
        Reis, GS0
P. Garde, Citizens Clinic, Director
      . M. Hill, IE
Government Accountability Project
          iller, NRR
b c w/ encl:
        Brach, GS0
Reis, GS0
    A     ingh, NRR/PWR-A, Mail Stop 416
. M. Hill, IE
        Sinkule, RII
3(tW
        Christnot, RII
iller, NRR
    3(tW
Brach, GS0
    J Hunt, RII
A
    J     illion, RII
ingh, NRR/PWR-A, Mail Stop 416
          icholson, RII
Sinkule, RII
        Wiseman, RII
Christnot, RII
        C Resident Inspector
J Hunt, RII
    Document Control Desk
J
    State of Georgia
illion, RII
                                          hl           /
icholson, RII
    WP 1 ler:lb                     GWisem     TConi n
Wiseman, RII
    if/.p/86                         If/'2d     1   /86
C Resident Inspector
    RII                             RII
Document Control Desk
    AHerdt                           MSjnkule
State of Georgia
      14/f/86                       ,10/j/86
hl
                                      J t' 7
/
                                                              -
WP 1 ler:lb
GWisem
TConi n
if/.p/86
If/'2d
1
/86
RII
RII
AHerdt
MSjnkule
14/f/86
,10/j/86
J t' 7
-
}}
}}

Latest revision as of 21:50, 5 December 2024

Forwards Insp Rept 50-424/86-88 on 861006-10.No Violation or Deviations Noted
ML20211M056
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/02/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20211M060 List:
References
NUDOCS 8612160233
Download: ML20211M056 (3)


See also: IR 05000424/1986088

Text

_

_ _ _ _ _ _ _

.___ - .

_ _ _ _ _ _ _ _ _ _ _ _ _ , - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

l -

.4

(

DEC 2

1986

/

1

I

Docket No. 50-424

License No. CPPR-108

l

Gporgia Power Company

MTTH: Mr. J. H. Miller, Jr.

President

l

P. O. Box 4545

Atlanta, GA 30302

Centlemen:

SUBJECT: NRC INSPECTION REPORT N0. 50-42f/36-88

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. H. Miller, Jr., on October 6-10, 1986.

The inspection included a review of

activities authorized for your Vogtle facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

The enclosed Inspection Report documents an oral commitment (see report paragraph

Section 2) made by a licensee representative and discussed in the exit interview.

If your understanding of this conunitment differs from the report statements,

please inform this office promptly.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/ encl:

(See page 2)

8612160233 861202

ADOCK 050

4

{DR

8

I \\

zee !

..

.. . -

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

4

.

.

.

Georgia Power Company

2

DEC 2

15

cp w/ encl:

14. P. O'Reilly, Senior Vice President

Nuclear Operations

J.E.Conway,SeniorVicePresident&

Project Director

Of 0. Foster, Vice President, Project

Support

  1. . D. Rice, Vice President, Project

Engineering

  1. H. Pinson, Vice President, Project

Construction

/ T. Beckham, Vice President &

General Manager - Operations

(Jt'. A. Thomas, Vice President,

Licensing

I,0. S. Read, General Manager,

Quality Assurance

(/l W. Hayes, Vogtle Quality

Assurance Menager

tZ C. Ramsey, Manager -

Readiness Feview

$( B. Bockho'.d, General Manager,

Nuclear Outrations

/

(L. Gucwa, Harlager, Nuclear Safety

dnd Lice.13}ng

g H. Googe, Project

Construction Manager

GrD. Groover, Quality'

Assurance Site Manager -

Construction

k A. Bailey, Project Licensing -

Manager

(VF. Trowbridge, Esq. , Shaw,

Pittman, Potts and Trowbridge

[prW. Churchill, Esq. , Shaw,

fittman,PottsandTrowbridge

E. L. Blake, Jr. , Esq. , Shaw,

, fittman, Potts and Trowbridge

W. E. Joiner, Troutman, Sanders,

J.ockerman and Ashmore

L(. G. Ledbetter, Commissioner,

,)epartmentofHumanResources

LC. H. Badger, Office of Planning

6(andBudget

Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

(cc w/ encl cont'd - see page 3)

.

_

-

.

.

-

-

.

-

.-

.

6

a

.

.

2

M

Georgia Power Company

3

cc w/enci - cont'd

B/Feig, Georgians Against

JiuclearEnergy

tr. B. Margulies, Esq. , Chairman,

Atomic Safety and Licensing Board

Ppnel

pf. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

fanel

F. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

M. Panel

P. Garde, Citizens Clinic, Director

Government Accountability Project

b c w/ encl:

Reis, GS0

. M. Hill, IE

3(tW

iller, NRR

Brach, GS0

A

ingh, NRR/PWR-A, Mail Stop 416

Sinkule, RII

Christnot, RII

J Hunt, RII

J

illion, RII

icholson, RII

Wiseman, RII

C Resident Inspector

Document Control Desk

State of Georgia

hl

/

WP 1 ler:lb

GWisem

TConi n

if/.p/86

If/'2d

1

/86

RII

RII

AHerdt

MSjnkule

14/f/86

,10/j/86

J t' 7

-