ML20211M633: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:e
{{#Wiki_filter:e
;-     ..                                                                                   f) m0
f) m0
    j 'O
;-
      P
..
  >     e
'O
                                                  ,-
j
                                                    f"EC     129p
P
                                                          .A, 4 c0
>
                                                              _.
e
            Docket No. 50-483
f"EC 129p
            Union Electric Company
.A, 4 c0
            ATTN: Mr. Donald F. Schnell
,-
                    Vice President - Nuclear
_.
            Post Office Box 149 - Mail Code 400
Docket No. 50-483
            St. Louis, MO 63166
Union Electric Company
            Gentlemen:
ATTN: Mr. Donald F. Schnell
            This refers to the routine safety inspection conducted by Messrs. B. H. Little
Vice President - Nuclear
          and C. H. Brown of this office on October 5 through November 30, 1986, of
Post Office Box 149 - Mail Code 400
            activities at Callaway Plant, Unit 1, authorized by NRC Operating License
St. Louis, MO 63166
            No. NPF-30 and to the discussion of our findings with Mr. G. !. Randolph and
Gentlemen:
          others of your staff at the conclusion of the inspection.
This refers to the routine safety inspection conducted by Messrs. B. H. Little
          The enclosed copy of our inspection report identifies areas examined during
and C. H. Brown of this office on October 5 through November 30, 1986, of
            the inspection. Within these areas, the inspection consisted of a selective
activities at Callaway Plant, Unit 1, authorized by NRC Operating License
          examination of procedures and representative records, observations, and
No. NPF-30 and to the discussion of our findings with Mr. G. !. Randolph and
            interviews with personnel.
others of your staff at the conclusion of the inspection.
          No violations of NRC requirements were identified during the course of this
The enclosed copy of our inspection report identifies areas examined during
            inspection.
the inspection. Within these areas, the inspection consisted of a selective
            In accordance with 10 CFR 2.790 of the Conmission's regulations, a copy of
examination of procedures and representative records, observations, and
          this letter and the enclosed inspection report will be placed in the NRC
interviews with personnel.
          Public Document Room.
No violations of NRC requirements were identified during the course of this
          We will gladly discuss any questions you have concerning this inspection.
inspection.
                                                      Sincerely,
In accordance with 10 CFR 2.790 of the Conmission's regulations, a copy of
                                                      _d' Orici:a1 signee q ,!.
this letter and the enclosed inspection report will be placed in the NRC
                                                                                  L, Forneyn
Public Document Room.
                                                      R. F. Warnick, Chief
We will gladly discuss any questions you have concerning this inspection.
                                                      Reactor Projects Branch 1
Sincerely,
          Enclosure:     Inspection Report
d'_ Orici:a1 signee q
              No. 50-483/86020(DRP)
,!. L, Forneyn
                                                  8612180011
R. F. Warnick, Chief
                                                  PDR
Reactor Projects Branch 1
                                                                    861212
Enclosure:
          See Attached Distriubution             G
Inspection Report
                                                          ADOCK 05000483
No. 50-483/86020(DRP)
                                                                        PDR
8612180011 861212
                                            fff
See Attached Distriubution
          RIII             RII           RIII                 II           RIII
PDR
                c.
ADOCK 05000483
          pe,rch/Jp         pney           qWu+
G
                                              id              jlips .          W
PDR
                                                                                arn)g       sa
fff
                                                                                                i t
RIII
RII
RIII
II
RIII
pe,rch/Jp
pney
qWu+
jlips
arn)g
c.
W
sa
id
.
i
t


    r-
r-
    , ..
, ..
        .
p
    p
.
  L
L
...
...
'
'
          Union Electric Company               2
Union Electric Company
                                                DEC
2
                                                    3 2 gggg
DEC 3 2 gggg
          Distribution
Distribution
          cc w/er. closure:
cc w/er. closure:
          A. P. Neuhalfen, Manager Quality
A. P. Neuhalfen, Manager Quality
            Assurance
Assurance
          S. E. Miltenberger, General Manager,
S. E. Miltenberger, General Manager,
            Nuclear Operations
Nuclear Operations
          DCS/RSS (RIDS)
DCS/RSS (RIDS)
          Licensing Fee Management Branch
Licensing Fee Management Branch
          Resident Inspector, RIII
Resident Inspector, RIII
          Region IV
Region IV
          Resident Inspector, Wolf Creek
Resident Inspector, Wolf Creek
          K. Drey
K. Drey
          Chris R. Rogers, P.E.
Chris R. Rogers, P.E.
            Utility Division, Missouri
Utility Division, Missouri
            Public Service Commission
Public Service Commission
          SNUPPS
SNUPPS
          TSS, RIII
TSS, RIII
}}
}}

Latest revision as of 21:46, 5 December 2024

Forwards Safety Insp Rept 50-483/86-20 on 861005-1130.No Violations Noted
ML20211M633
Person / Time
Site: Callaway 
Issue date: 12/12/1986
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20211M636 List:
References
NUDOCS 8612180011
Download: ML20211M633 (2)


See also: IR 05000483/1986020

Text

e

f) m0

-

..

'O

j

P

>

e

f"EC 129p

.A, 4 c0

,-

_.

Docket No. 50-483

Union Electric Company

ATTN: Mr. Donald F. Schnell

Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, MO 63166

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. B. H. Little

and C. H. Brown of this office on October 5 through November 30, 1986, of

activities at Callaway Plant, Unit 1, authorized by NRC Operating License

No. NPF-30 and to the discussion of our findings with Mr. G. !. Randolph and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Conmission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

d'_ Orici:a1 signee q

,!. L, Forneyn

R. F. Warnick, Chief

Reactor Projects Branch 1

Enclosure:

Inspection Report

No. 50-483/86020(DRP)

8612180011 861212

See Attached Distriubution

PDR

ADOCK 05000483

G

PDR

fff

RIII

RII

RIII

II

RIII

pe,rch/Jp

pney

qWu+

jlips

arn)g

c.

W

sa

id

.

i

t

r-

, ..

p

.

L

...

'

Union Electric Company

2

DEC 3 2 gggg

Distribution

cc w/er. closure:

A. P. Neuhalfen, Manager Quality

Assurance

S. E. Miltenberger, General Manager,

Nuclear Operations

DCS/RSS (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Region IV

Resident Inspector, Wolf Creek

K. Drey

Chris R. Rogers, P.E.

Utility Division, Missouri

Public Service Commission

SNUPPS

TSS, RIII