ML20211N897: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:*
{{#Wiki_filter:*
* nitro g               't UNITED OTATES NUCLEAR REGULATORY COMMISSION I f-                         WASHINGTON, D.C. 20066 4001
nitro g
      %            #                              September 7, 1999 The Honorable Paul Sarbanes United States Senate Washington, DC 20510 Daar Senator Sarbanes:
't UNITED OTATES NUCLEAR REGULATORY COMMISSION I f-WASHINGTON, D.C. 20066 4001 September 7, 1999 The Honorable Paul Sarbanes United States Senate Washington, DC 20510 Daar Senator Sarbanes:
I am responding to your letter to Mr. Dennis Rathbun of the U.S. Nuclear Regulatory Commission (NRC) Office of Congressional Affairs dated July 20,1999, in which you refer to a letter from William C. Batton, President of the New 7* Democratic Civic Club, Inc. In his letter, Mr. Batton expressed support of the renewal application of Baltimore Gas and Electric Company for the Calvert Cliffs plants, as well as concerns about the lack of specificity related to the regulatory specifications for license renewal and the length of time set aside for public comment.
I am responding to your letter to Mr. Dennis Rathbun of the U.S. Nuclear Regulatory Commission (NRC) Office of Congressional Affairs dated July 20,1999, in which you refer to a letter from William C. Batton, President of the New 7* Democratic Civic Club, Inc. In his letter, Mr. Batton expressed support of the renewal application of Baltimore Gas and Electric Company for the Calvert Cliffs plants, as well as concerns about the lack of specificity related to the regulatory specifications for license renewal and the length of time set aside for public comment.
In your July 20 letter, you also asked Mr. Rathbun to review the matter and respond.
In your July 20 letter, you also asked Mr. Rathbun to review the matter and respond.
In the enclosed copy of the NRC staff response to Mr. Batton, we have addressed these issues.
In the enclosed copy of the NRC staff response to Mr. Batton, we have addressed these issues.
If you have any questions, please do not hesitate to contact me.
If you have any questions, please do not hesitate to contact me.
Sincerely, h           ,M William D. Travers l
Sincerely, h
Executive Director                                       '
,M William D. Travers Executive Director for Operations
for Operations


==Enclosure:==
==Enclosure:==
As stated e
As stated e
CA".k Gyw':
CA".k Gyw':
g c   di h
c di g
9909130102 990907 PDR       ADOCK 05000317 H                         PDR
h 9909130102 990907 PDR ADOCK 05000317 H
PDR


n
n aseg Y
#              aseg g              Y         '
UNITED STATES g
UNITED STATES s                               NUCLEAR REGULATORY COMMISSION                                           ,
s NUCLEAR REGULATORY COMMISSION
    'k                                           WASHINGTON, D.c. asse6 coot
'k WASHINGTON, D.c. asse6 coot
                                                                                                              )
)
      '\*****                                                 July 20, 1999 Mr. William C. Batton, President The New 7* Democratic Civic Club, Inc.
'\\*****
        -1936 Merritt Boulevard Baltimore, MD 21222 4628
July 20, 1999 Mr. William C. Batton, President The New 7* Democratic Civic Club, Inc.
-1936 Merritt Boulevard Baltimore, MD 21222 4628


==Dear Mr. Batton:==
==Dear Mr. Batton:==
 
I am responding to your letter to Chairman Jackson of the U.S. Nuclear Regulatory Commission (NRC), of June 24,1999, in which you express your support for the renewal of the operating licenses for Battimore Gas and Electric Company's (BG&E) Calvert Cliffs plants. In your letter, you also voice your belief that the Commission's regulations for license renewal lack specificity and state your concem about the length of time set aside for public comment.
I am responding to your letter to Chairman Jackson of the U.S. Nuclear Regulatory Commission (NRC), of June 24,1999, in which you express your support for the renewal of the operating licenses for Battimore Gas and Electric Company's (BG&E) Calvert Cliffs plants. In your letter, you also voice your belief that the Commission's regulations for license renewal lack specificity   .
BG&E submitted a lic.anbe renen! application for its two Calvert Cliffs plants, which is the first such application, in Apri! 1996. The NRC staff issued a safety evaluation report on the application in March 1999. The safety evaluation report contained a number of open and j
and state your concem about the length of time set aside for public comment.                       l BG&E submitted a lic.anbe renen! application for its two Calvert Cliffs plants, which is the first !
confirmatory items that BG&E responded to in a letter to the NRC dated July 2,1999. The staff is reviewing BG&E's response and plans to issue a final safety evaluation in November 1999.
such application, in Apri! 1996. The NRC staff issued a safety evaluation report on the application in March 1999. The safety evaluation report contained a number of open and             j confirmatory items that BG&E responded to in a letter to the NRC dated July 2,1999. The staff is reviewing BG&E's response and plans to issue a final safety evaluation in November 1999.       )'
)
On February 24,1999, the 4taff also losued a draft plant-specific supplement to NUREG-1437,
On February 24,1999, the 4taff also losued a draft plant-specific supplement to NUREG-1437,
          " Generic Environmental impact Statement for License Renewal of Nuclear Plants (GEIS) for the     ;
" Generic Environmental impact Statement for License Renewal of Nuclear Plants (GEIS) for the
        - Calvert Cliffs Nuclear Power Plant.' The staff is now considering public comments received by May 20,1999, and plans to issue a final supplemental environmental impact statement in mid-November 1999.
- Calvert Cliffs Nuclear Power Plant.' The staff is now considering public comments received by May 20,1999, and plans to issue a final supplemental environmental impact statement in mid-November 1999.
Regarding your belief that the Commission's regulations for license renewat lack specificity, Part ;
Regarding your belief that the Commission's regulations for license renewat lack specificity, Part S4, " Requirements for Renewal of Operating Licenses for Nuclear Power Plants," of Title 10 of
S4, " Requirements for Renewal of Operating Licenses for Nuclear Power Plants," of Title 10 of
. the Code of Federal Regulations (10 CFR Part 54) sets forth the requirements applicants for j
          . the Code of Federal Regulations (10 CFR Part 54) sets forth the requirements applicants for       j license renewal must meet and the standards by which the NRC evaluates their applications.
license renewal must meet and the standards by which the NRC evaluates their applications.
Part 54 defines what types of plant structures and equipment fall within the scope of license renewal. The regulations next set forth the criteria for determining which structures and components within the scope of license renewal require aging management. The applicant must demonstrate that it will manage the aging of these structures and components so that they will continue to function as intended for the license renewal period.
Part 54 defines what types of plant structures and equipment fall within the scope of license renewal. The regulations next set forth the criteria for determining which structures and components within the scope of license renewal require aging management. The applicant must demonstrate that it will manage the aging of these structures and components so that they will continue to function as intended for the license renewal period.
In reviewing the applications, the NRC staff follows Part 54 and the guidance provided in a draft standard review plan (SRP), " Standard Review Plan for the Review of License Renewal Applications for Nuclear Power Plants," and a draft environmental standard review plan, NUREG-1555," Environmental Standard Review Plan," both of which provide sufficiently clear, specific, and measurable review criteria. The license renewal SRP is available to the public on Enclosure il O   sr S(f
In reviewing the applications, the NRC staff follows Part 54 and the guidance provided in a draft standard review plan (SRP), " Standard Review Plan for the Review of License Renewal Applications for Nuclear Power Plants," and a draft environmental standard review plan, NUREG-1555," Environmental Standard Review Plan," both of which provide sufficiently clear, specific, and measurable review criteria. The license renewal SRP is available to the public on Enclosure il S(
O sr f


s    Mr. William C. Batton                             -2                     July 20,1999 the NRC's web site (http://www.nrc. gov), and both SRPs can be obtained from the NRC Public Document Room (2120 L Street, NW, Washington, DC 20555) and the local public document               I rooms located near each plant site. The staff is confident that the standards set forth in Part 54 and the SRPs, and which the staff applies in its review, are specific and objective.
Mr. William C. Batton
-2 July 20,1999 s
the NRC's web site (http://www.nrc. gov), and both SRPs can be obtained from the NRC Public Document Room (2120 L Street, NW, Washington, DC 20555) and the local public document I
rooms located near each plant site. The staff is confident that the standards set forth in Part 54 and the SRPs, and which the staff applies in its review, are specific and objective.
Regarding your concem about the length of time (30 days) set aside for public comments, this period, specified in the Federal Register notice that provided the opportunity for a hearing regarding the renewal of the Calvert Cliffs operating licenses, was not a public comment period.
Regarding your concem about the length of time (30 days) set aside for public comments, this period, specified in the Federal Register notice that provided the opportunity for a hearing regarding the renewal of the Calvert Cliffs operating licenses, was not a public comment period.
Rather, it is a time limit generally provided in connection with licensing actions, within which an interested member of the public may request a formal hearing pursuant to 10 CFR Section 2.714 of the Commission's regulations. After this period, the regulations afford a petitioner an additional period in which to identify the technical issues he or she wishes to litigate. The Commission's objectives are to provide a fair hearing process, to avoid unnecessary delays in the NRC's review and hearing processes, and to produce a complete record that supports agency decision making on matters related to the NRC's responsibilities for protecting public health and safety. We believe the current process achieves these goals.
Rather, it is a time limit generally provided in connection with licensing actions, within which an interested member of the public may request a formal hearing pursuant to 10 CFR Section 2.714 of the Commission's regulations. After this period, the regulations afford a petitioner an additional period in which to identify the technical issues he or she wishes to litigate. The Commission's objectives are to provide a fair hearing process, to avoid unnecessary delays in the NRC's review and hearing processes, and to produce a complete record that supports agency decision making on matters related to the NRC's responsibilities for protecting public health and safety. We believe the current process achieves these goals.
There is also a formal process for providing input into the staffs environmental review of a license renewal application. The Commission's regulations in 10 CFR Part 51 allow for an opportunity to provide comments on the scope of the environmental review, and in 10 CFR Section 51.73, require a minimum 45-day period for an opportunity to comment on the staffs preliminary environmental conclusions, set forth in the plant-specific supplement to the GEIS Sixty and seventy five day periods were provided, respectively, for these purposes with respect to Calvert Cliffs.
There is also a formal process for providing input into the staffs environmental review of a license renewal application. The Commission's regulations in 10 CFR Part 51 allow for an opportunity to provide comments on the scope of the environmental review, and in 10 CFR Section 51.73, require a minimum 45-day period for an opportunity to comment on the staffs preliminary environmental conclusions, set forth in the plant-specific supplement to the GEIS Sixty and seventy five day periods were provided, respectively, for these purposes with respect to Calvert Cliffs.
Finally, there are opportunities to raise questions on individual license renewal applications at public meetings, which are held in the NRC offices in Rockville, Maryland and in the vicinity of the facility applying for license renewal. Information provided by the license renewal applicants, as well as NRC evaluations, findings, and recommendations, are made available to the public in such meetings. The purpose of these meetings is to discuss questions which arise during the         :
Finally, there are opportunities to raise questions on individual license renewal applications at public meetings, which are held in the NRC offices in Rockville, Maryland and in the vicinity of the facility applying for license renewal. Information provided by the license renewal applicants, as well as NRC evaluations, findings, and recommendations, are made available to the public in such meetings. The purpose of these meetings is to discuss questions which arise during the staffs review of the application and an applicant's responses to these questions. And, of course, members of the public are free to correspond with the staff in writing.
staffs review of the application and an applicant's responses to these questions. And, of course, members of the public are free to correspond with the staff in writing.
Because the license renewal process is new, the staff expects to make improvements in the effectiveness and efficiency of reviews and will take your request as encouragement to look for 1
Because the license renewal process is new, the staff expects to make improvements in the effectiveness and efficiency of reviews and will take your request as encouragement to look for     ,
I J
1 I
l
J l


                    .      e Mr. William C. Batton                                                     J01y 20, 1999 additional ways to provide for even greater public involvement. I trust the information set forth above addresses your concerns. I appreciate your comments, and you may rest assured that the Commission will continue to seek improvements in its license renewal review process.
e Mr. William C. Batton J01y 20, 1999 additional ways to provide for even greater public involvement. I trust the information set forth above addresses your concerns. I appreciate your comments, and you may rest assured that the Commission will continue to seek improvements in its license renewal review process.
Sincerely, I
Sincerely, I
irector Office of Nuclear Reactor Regulation l
irector Office of Nuclear Reactor Regulation l
l l
E E.
E E.


l September 7, 1999
September 7, 1999
    . The Honorable Paul Sarbanes United States Senate Washington, DC 20510
. The Honorable Paul Sarbanes United States Senate Washington, DC 20510


==Dear Senatdr Sarbanes:==
==Dear Senatdr Sarbanes:==
 
I am responding to your letter to Mr. Dennis Rathbun of the U.S. Nuclear Regulatory Commission (NRC) Office of Congressional Affairs dated July 20,1999, in which you refer to a letter from William C. Batton, President of the New 7* Democratic Civic Club, Inc. In his letter, Mr. Batton expressed support of the renewal application of Baltimore Gas and Electric Company for the Calvert Cliffs plants, as well as concerns about the lack of specificity related to the regulatory specifications for license renewal and the length of time set aside for public cornment.
I am responding to your letter to Mr. Dennis Rathbun of the U.S. Nuclear Regulatory                 l Commission (NRC) Office of Congressional Affairs dated July 20,1999, in which you refer to a letter from William C. Batton, President of the New 7* Democratic Civic Club, Inc. In his letter, Mr. Batton expressed support of the renewal application of Baltimore Gas and Electric Company for the Calvert Cliffs plants, as well as concerns about the lack of specificity related to the regulatory specifications for license renewal and the length of time set aside for public cornment.
In your July 20 letter, you also asked Mr. Rathbun to review the matter and respond.
In your July 20 letter, you also asked Mr. Rathbun to review the matter and respond.
In the enclosed copy of the NRC staff response to Mr. Batton, we have addressed these issues.
In the enclosed copy of the NRC staff response to Mr. Batton, we have addressed these issues.
If you have any questions, please do not hesitate to contact me.
If you have any questions, please do not hesitate to contact me.
Sincerely, U lmldSi U
Sincerely, U lmldSi U
Weam o gnedrmyon, by William D. Travers Executive Director for Operations
Weam o gned by
: rmyon, William D. Travers Executive Director for Operations


==Enclosure:==
==Enclosure:==
As stated DISTRIBUTION:
As stated DISTRIBUTION:
See next page A:\ Letter to US Senator Sarbanes.wpd         *See previous concurrence OFFICE       PM:RLSB         TECH EDITOR       LA           OGC               PD:RLSB NAME-         DLSolorio       R. Sanders         S.Little     JMoore           CIGrimes 1
See next page A:\\ Letter to US Senator Sarbanes.wpd
DATE         08/25/99*       08/24/99*         08/25/99*   08/27/99*         08/25/99*
*See previous concurrence OFFICE PM:RLSB TECH EDITOR LA OGC PD:RLSB NAME-DLSolorio R. Sanders S.Little JMoore CIGrimes 1
OFFICE       D: DRIP         ADIP               D:h6        EDO               OCA ,
DATE 08/25/99*
NAME         DBMatthews       WFKane         %SJGdns       hTrMe p           D     kbun DATE         08/27/99*       08/27/99*         08/ )o/99   Of/ L.199         09/7 /99 OFFICIAL RECORD COPY
08/24/99*
                                                            \\Q
08/25/99*
08/27/99*
08/25/99*
D:h6 OFFICE D: DRIP ADIP EDO OCA,
NAME DBMatthews WFKane
%SJGdns hTrMe p kbun D
DATE 08/27/99*
08/27/99*
08/ )o/99 Of/ L.199 09/7 /99 OFFICIAL RECORD COPY
\\\\Q


7^   . .
7^
l I
I i-*
i-*             1
1
: l. '.
: l. '.
        - The Honorable Paul Sarbanes'.
- The Honorable Paul Sarbanes'.
The United States Senate 309 Hart Senate Office Building l       . Washington, DC 20510-2002                                                                           i
The United States Senate 309 Hart Senate Office Building l
                                                                                    /                         :
. Washington, DC 20510-2002 i
/


==Dear Senator Sarbanes:==
==Dear Senator Sarbanes:==
 
l I am responding to your letter to Mr. Dennis Rathbun of the U S. Nuclear Regulatory j
1 I am responding to your letter to Mr. Dennis Rathbun of the Uj S. Nuclear Regulatory             .
Commission (NRC) Office _ of Congressional Affairs dated Juiy 20,1999, in which you refer to a i
l Commission (NRC) Office _ of Congressional Affairs dated Juiy 20,1999, in which you refer to a       i letter from William C. Batton, President of the New 7* Derylocratic Civic Club, Inc. In his letter, Mr. Batton expressed support of the renewal application 4f Baltimore Gas and Electric Company for the Calvert Cliffs plants, as well as concerns about)h'e lack of specificity related to the regulatory specifications for license renewal and the dngth of time set aside for public comment. j in your July 20 letter, you also asked Mr. Rathbun t review the matter and respond.
letter from William C. Batton, President of the New 7* Derylocratic Civic Club, Inc. In his letter, Mr. Batton expressed support of the renewal application 4f Baltimore Gas and Electric Company for the Calvert Cliffs plants, as well as concerns about)h'e lack of specificity related to the regulatory specifications for license renewal and the dngth of time set aside for public comment.
                                  ..                                                                          l In the enclosed copy of the NRC staff response Mr. Batton, we have addressed these issues.           l If you have'any questions, please do not hesit e to contact me.
j in your July 20 letter, you also asked Mr. Rathbun t review the matter and respond.
l incerely,
l In the enclosed copy of the NRC staff response Mr. Batton, we have addressed these issues.
                                                                                                              ]
If you have'any questions, please do not hesit e to contact me.
1 William D. Travers                               I Executive Director                               j for Operations
: incerely,
]
1 William D. Travers I
Executive Director j
for Operations


==Enclosure:==
==Enclosure:==
As stated:
As stated:
        ' DISTRIBUTION.                                                                     -
' DISTRIBUTION.
See next page                                                 .
See next page
        . G:\RLSB\SOLORIO\ Letter to           Senator Sarbanes.wpd *See previous concurrence OFFICE       PM:RLSB         [ TECH EDITOR LA'-                   OGC , g PD:RLE NAME         DLSolorM         R. Sanders -           S.Uttle     JMoorkMo#'CIGrim DATE         04(f/99       / 08/24/99*     ,
. G:\\RLSB\\SOLORIO\\ Letter to Senator Sarbanes.wpd *See previous concurrence OFFICE PM:RLSB
08/25/99*   08/17/99         08/21999     l OFFICE '    'D:DRM / ADIP               h , d D:NRR .             EDO                           l v     '3         -        e                                                   ;
[ TECH EDITOR LA'-
NAME'         DBMatthews       WFKane O'.s \SJCollins.            WDTravers DATE         08/ N99     I   08/ h/99 ~             08/     /99 09/     /99 OFFICIAL RECORD COPY                                           l i
OGC, g PD:RLE NAME DLSolorM R. Sanders -
S.Uttle JMoorkMo#'CIGrim DATE 04(f/99
/ 08/24/99*
08/25/99*
08/17/99 08/21999
'D:DRM / ADIP h, d D:NRR.
EDO OFFICE '
v
'3 e
NAME' DBMatthews WFKane O'.s \\SJCollins WDTravers DATE 08/ N99 I
08/ h/99 ~
08/
/99 09/
/99 OFFICIAL RECORD COPY i


e The Honorable Paul Sarbanes The United States Senate 309 Hart Senate Office Building Washington, DC 20510-2002
e The Honorable Paul Sarbanes The United States Senate 309 Hart Senate Office Building Washington, DC 20510-2002


==Dear       ator Sarbanes:==
==Dear ator Sarbanes:==
 
. I am respon g to your letter to Mr. Dennis Rathbun of the U.S. Nuclear Regulatory Commission (
    . I am respon     g to your letter to Mr. Dennis Rathbun of the U.S. Nuclear Regulatory Commission (       C) Office of Congressional Affairs dated July 20,1999, in which you refer to a letter from William . Batton, President of the New 7* Democratic Civic Club, Inc. In his letter, !
C) Office of Congressional Affairs dated July 20,1999, in which you refer to a letter from William. Batton, President of the New 7* Democratic Civic Club, Inc. In his letter, Mr. Batton expresse support of the renewal application of Baltimore Gas and Electric Company
Mr. Batton expresse support of the renewal application of Baltimore Gas and Electric Company     {
{
for the Calvert Cliffs pl ts,' as well as concerns about the lack of specificity related to the
for the Calvert Cliffs pl ts,' as well as concerns about the lack of specificity related to the
                                                                                                        )
)
regulatory specifications rlicense renewal and the length of time set aside for public comment.   !
regulatory specifications rlicense renewal and the length of time set aside for public comment.
In your July 20 letter, you a o asked Mr. Rathbun to review the matter and respond.               I 1
In your July 20 letter, you a o asked Mr. Rathbun to review the matter and respond.
In the enclosed copy of the NR staff response to Mr. Batton, we have addressed these issues.     ;
In the enclosed copy of the NR staff response to Mr. Batton, we have addressed these issues.
If you have any questions, please o not hesitate to contact me.
If you have any questions, please o not hesitate to contact me.
                                                                                                        )
)
Sincerely, Wi m D. Travers Exec tive Director forO rations                                     I
Sincerely, Wi m D. Travers Exec tive Director forO rations


==Enclosure:==
==Enclosure:==
As stated DISTRIBUTION:                                                                                     1 See next page                                                                                     I G:\RLSB\SOLORIO\ Letter to US Senator Sarbanes.wpd *See p vious concurrence OFFICE       PM:RL4           TECH EDITOR     LA ,qQ                         PD:RLSB OGC\
As stated DISTRIBUTION:
NAME         DLSoloh                           MyTon           JMoore k         CIGrimes DATE         08/k/99           08/ /99         08/ 3/99       08/ /99 \       08/ /99 OFFICE       D: DRIP -         ADIP             D:NRR         EDO             \
1 See next page G:\\RLSB\\SOLORIO\\ Letter to US Senator Sarbanes.wpd *See p vious concurrence OFFICE PM:RL4 TECH EDITOR LA,qQ OGC\\
NAME         DBMatthews 08/
PD:RLSB NAME DLSoloh MyTon JMoore k CIGrimes DATE 08/k/99 08/ /99 08/ 3/99 08/ /99 \\ 08/ /99
WFKane           SJCollins     WDTravers           k DATE               /99         08/   /99       08/ ' /99     09/ /99 OFFICIAL RECORD COPY
\\
OFFICE D: DRIP -
ADIP D:NRR EDO k
NAME DBMatthews WFKane SJCollins WDTravers DATE 08/
/99 08/
/99 08/ ' /99 09/
/99 OFFICIAL RECORD COPY


NRC FORM 8 .
NRC FORM 8.
(7-94)
(7-94)
NRCMD 3.57 E-8l INCOMING AND SIGNATURE TAB                                                                                                 h o
NRCMD 3.57 E-8l INCOMING AND SIGNATURE TAB ho USE THIS SIDE OF THE SHEET TO PRECEDE THE INCOMING MATERIAL WHEN ASSEMBLING CORRESPONDENCE (USE REVERSE SIDE FOR SIGNATURE TAB)
USE THIS SIDE OF THE SHEET TO PRECEDE THE INCOMING MATERIAL WHEN ASSEMBLING CORRESPONDENCE (USE REVERSE SIDE FOR SIGNATURE TAB)
L
L


NRC FORM 8 (7-94)
NRC FORM 8 (7-94)
NRCMD 3.57 INCOMING AND SIGNATURE TAB USE THIS SIDE OF THE SHEET TO PRECEDE THE SIGNATURE PAGE
NRCMD 3.57 INCOMING AND SIGNATURE TAB USE THIS SIDE OF THE SHEET TO PRECEDE THE SIGNATURE PAGE
                  -WHEN ASSEMBLING CORRESPONDENCE (USE REVERSE SIDE FOR INCOMING TAB) se O
-WHEN ASSEMBLING CORRESPONDENCE (USE REVERSE SIDE FOR INCOMING TAB) se O@
8 m
8 m
                                                                                                                  ?
?
L,,
L,,


.y 3  b ACTION               >
3 b
8 EDO Principal Correspondence Control                             ! o88
.y ACTION e
                                                                  .                          #LSA FROM:                 DUE: 09/01/99~                 EDO CONTROL: Gl9990418 DOC DT: 07/20/99 FINAL REPLY:
8
! o88 EDO Principal Correspondence Control
#LSA EDO CONTROL: Gl9990418 FROM:
DUE: 09/01/99~
DOC DT: 07/20/99 FINAL REPLY:
Senator Paul Sarbanes TO:
Senator Paul Sarbanes TO:
Rathbu. G.                                                                             j F0   SIGNATURE OF :             ** GRN   **                  CRC NO: 99-0725 Travers, EDO DESC:                                                       ROUTING:
Rathbu.
CALVERT CLIFFS POWER PLANT (William C. Batton)               Travers
G.
'                                                                      Knapp Miraglia B$b                           !
j F0 SIGNATURE OF :
I Burns DATE: 08/19/99                                                   Miller, RI ASSIGNED TO:           CONTACT:
** GRN CRC NO: 99-0725 Travers, EDO DESC:
_NRR             Collins SPECIAL INSTRUCTIONS OR REMARKS:
ROUTING:
Ref. Gl9990335 and Gl9990383.        ,.
CALVERT CLIFFS POWER PLANT (William C. Batton)
    ' N 0 h f & : h ll l ^lll' ' ^'L!! k ''' '#       AYM 4)tb L&ud: (la ud if1999                                                                         :
Travers Knapp Miraglia B$b Burns DATE: 08/19/99 Miller, RI ASSIGNED TO:
4]l?L &fw : 0 bed /PwurDMR j                                                             RCTION g         21 7 0 ; .'.'l?
CONTACT:
g          ,        s D.',,. ..c
_NRR Collins SPECIAL INSTRUCTIONS OR REMARKS:
                                                                                        . y~;; j V788     W               i  5/   . _ f j f f f'-
Ref. Gl9990335 and Gl9990383.
' N 0 h f & : h ll l ^lll' ' ^'L!! k ''' '#
AYM 4)tb L&ud: (la ud if1999 4]l?L &fw : 0 bed /PwurDMR RCTION j
g 21 7 0 ;.'.'l?
D.',,.
.. c y~;; j g
s V788 W 5 /
. _ f j f f f'-
i


o .    ..
o O
F   .;j   O w
F
OFFICE OF-THE SECRETARY CORRESPONDENCE CONTROL' TICKET PAPER NUMBER:     CRC-99-0725                     LOGGING DATE: Aug 18 99 ACTION OFFICE:     EDO AUTHOR:             PAUL SARBANES, SEN
.;j w
    ~ AFFILIATION:     U.S.-SENATE ADDRESSEE:         RATHBUN.
OFFICE OF-THE SECRETARY CORRESPONDENCE CONTROL' TICKET PAPER NUMBER:
LETTER DATE:       Jul 20 99         FILE CODE: IDR 5 CALVERT CLIFFS
CRC-99-0725 LOGGING DATE: Aug 18 99 ACTION OFFICE:
EDO AUTHOR:
PAUL SARBANES, SEN
~ AFFILIATION:
U.S.-SENATE ADDRESSEE:
RATHBUN.
LETTER DATE:
Jul 20 99 FILE CODE: IDR 5 CALVERT CLIFFS


==SUBJECT:==
==SUBJECT:==
CALVERT CLIFFS POWER PLANT ACTION:             Signature of EDO DISTRIBUTION:
CALVERT CLIFFS POWER PLANT ACTION:
SPECIAL' HANDLING: OCA TO ACK-CONSTITUENT:       WILLIAM BATTON NOTES:
Signature of EDO DISTRIBUTION:
DATE DUE:         Sep   1 99 SIGNATURE:           .                              DATE SIGNED:
SPECIAL' HANDLING: OCA TO ACK-CONSTITUENT:
WILLIAM BATTON NOTES:
DATE DUE:
Sep 1 99 SIGNATURE:
DATE SIGNED:
AFFILIATION:
AFFILIATION:
EDO --G19990418 Lz}}
EDO --G19990418 Lz}}

Latest revision as of 21:33, 5 December 2024

Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants
ML20211N897
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/07/1999
From: Travers W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Sarbanes P
SENATE
Shared Package
ML20211N902 List:
References
NUDOCS 9909130102
Download: ML20211N897 (8)


Text

nitro g

't UNITED OTATES NUCLEAR REGULATORY COMMISSION I f-WASHINGTON, D.C. 20066 4001 September 7, 1999 The Honorable Paul Sarbanes United States Senate Washington, DC 20510 Daar Senator Sarbanes:

I am responding to your letter to Mr. Dennis Rathbun of the U.S. Nuclear Regulatory Commission (NRC) Office of Congressional Affairs dated July 20,1999, in which you refer to a letter from William C. Batton, President of the New 7* Democratic Civic Club, Inc. In his letter, Mr. Batton expressed support of the renewal application of Baltimore Gas and Electric Company for the Calvert Cliffs plants, as well as concerns about the lack of specificity related to the regulatory specifications for license renewal and the length of time set aside for public comment.

In your July 20 letter, you also asked Mr. Rathbun to review the matter and respond.

In the enclosed copy of the NRC staff response to Mr. Batton, we have addressed these issues.

If you have any questions, please do not hesitate to contact me.

Sincerely, h

,M William D. Travers Executive Director for Operations

Enclosure:

As stated e

CA".k Gyw':

c di g

h 9909130102 990907 PDR ADOCK 05000317 H

PDR

n aseg Y

UNITED STATES g

s NUCLEAR REGULATORY COMMISSION

'k WASHINGTON, D.c. asse6 coot

)

'\\*****

July 20, 1999 Mr. William C. Batton, President The New 7* Democratic Civic Club, Inc.

-1936 Merritt Boulevard Baltimore, MD 21222 4628

Dear Mr. Batton:

I am responding to your letter to Chairman Jackson of the U.S. Nuclear Regulatory Commission (NRC), of June 24,1999, in which you express your support for the renewal of the operating licenses for Battimore Gas and Electric Company's (BG&E) Calvert Cliffs plants. In your letter, you also voice your belief that the Commission's regulations for license renewal lack specificity and state your concem about the length of time set aside for public comment.

BG&E submitted a lic.anbe renen! application for its two Calvert Cliffs plants, which is the first such application, in Apri! 1996. The NRC staff issued a safety evaluation report on the application in March 1999. The safety evaluation report contained a number of open and j

confirmatory items that BG&E responded to in a letter to the NRC dated July 2,1999. The staff is reviewing BG&E's response and plans to issue a final safety evaluation in November 1999.

)

On February 24,1999, the 4taff also losued a draft plant-specific supplement to NUREG-1437,

" Generic Environmental impact Statement for License Renewal of Nuclear Plants (GEIS) for the

- Calvert Cliffs Nuclear Power Plant.' The staff is now considering public comments received by May 20,1999, and plans to issue a final supplemental environmental impact statement in mid-November 1999.

Regarding your belief that the Commission's regulations for license renewat lack specificity, Part S4, " Requirements for Renewal of Operating Licenses for Nuclear Power Plants," of Title 10 of

. the Code of Federal Regulations (10 CFR Part 54) sets forth the requirements applicants for j

license renewal must meet and the standards by which the NRC evaluates their applications.

Part 54 defines what types of plant structures and equipment fall within the scope of license renewal. The regulations next set forth the criteria for determining which structures and components within the scope of license renewal require aging management. The applicant must demonstrate that it will manage the aging of these structures and components so that they will continue to function as intended for the license renewal period.

In reviewing the applications, the NRC staff follows Part 54 and the guidance provided in a draft standard review plan (SRP), " Standard Review Plan for the Review of License Renewal Applications for Nuclear Power Plants," and a draft environmental standard review plan, NUREG-1555," Environmental Standard Review Plan," both of which provide sufficiently clear, specific, and measurable review criteria. The license renewal SRP is available to the public on Enclosure il S(

O sr f

Mr. William C. Batton

-2 July 20,1999 s

the NRC's web site (http://www.nrc. gov), and both SRPs can be obtained from the NRC Public Document Room (2120 L Street, NW, Washington, DC 20555) and the local public document I

rooms located near each plant site. The staff is confident that the standards set forth in Part 54 and the SRPs, and which the staff applies in its review, are specific and objective.

Regarding your concem about the length of time (30 days) set aside for public comments, this period, specified in the Federal Register notice that provided the opportunity for a hearing regarding the renewal of the Calvert Cliffs operating licenses, was not a public comment period.

Rather, it is a time limit generally provided in connection with licensing actions, within which an interested member of the public may request a formal hearing pursuant to 10 CFR Section 2.714 of the Commission's regulations. After this period, the regulations afford a petitioner an additional period in which to identify the technical issues he or she wishes to litigate. The Commission's objectives are to provide a fair hearing process, to avoid unnecessary delays in the NRC's review and hearing processes, and to produce a complete record that supports agency decision making on matters related to the NRC's responsibilities for protecting public health and safety. We believe the current process achieves these goals.

There is also a formal process for providing input into the staffs environmental review of a license renewal application. The Commission's regulations in 10 CFR Part 51 allow for an opportunity to provide comments on the scope of the environmental review, and in 10 CFR Section 51.73, require a minimum 45-day period for an opportunity to comment on the staffs preliminary environmental conclusions, set forth in the plant-specific supplement to the GEIS Sixty and seventy five day periods were provided, respectively, for these purposes with respect to Calvert Cliffs.

Finally, there are opportunities to raise questions on individual license renewal applications at public meetings, which are held in the NRC offices in Rockville, Maryland and in the vicinity of the facility applying for license renewal. Information provided by the license renewal applicants, as well as NRC evaluations, findings, and recommendations, are made available to the public in such meetings. The purpose of these meetings is to discuss questions which arise during the staffs review of the application and an applicant's responses to these questions. And, of course, members of the public are free to correspond with the staff in writing.

Because the license renewal process is new, the staff expects to make improvements in the effectiveness and efficiency of reviews and will take your request as encouragement to look for 1

I J

l

e Mr. William C. Batton J01y 20, 1999 additional ways to provide for even greater public involvement. I trust the information set forth above addresses your concerns. I appreciate your comments, and you may rest assured that the Commission will continue to seek improvements in its license renewal review process.

Sincerely, I

irector Office of Nuclear Reactor Regulation l

E E.

September 7, 1999

. The Honorable Paul Sarbanes United States Senate Washington, DC 20510

Dear Senatdr Sarbanes:

I am responding to your letter to Mr. Dennis Rathbun of the U.S. Nuclear Regulatory Commission (NRC) Office of Congressional Affairs dated July 20,1999, in which you refer to a letter from William C. Batton, President of the New 7* Democratic Civic Club, Inc. In his letter, Mr. Batton expressed support of the renewal application of Baltimore Gas and Electric Company for the Calvert Cliffs plants, as well as concerns about the lack of specificity related to the regulatory specifications for license renewal and the length of time set aside for public cornment.

In your July 20 letter, you also asked Mr. Rathbun to review the matter and respond.

In the enclosed copy of the NRC staff response to Mr. Batton, we have addressed these issues.

If you have any questions, please do not hesitate to contact me.

Sincerely, U lmldSi U

Weam o gned by

rmyon, William D. Travers Executive Director for Operations

Enclosure:

As stated DISTRIBUTION:

See next page A:\\ Letter to US Senator Sarbanes.wpd

  • See previous concurrence OFFICE PM:RLSB TECH EDITOR LA OGC PD:RLSB NAME-DLSolorio R. Sanders S.Little JMoore CIGrimes 1

DATE 08/25/99*

08/24/99*

08/25/99*

08/27/99*

08/25/99*

D:h6 OFFICE D: DRIP ADIP EDO OCA,

NAME DBMatthews WFKane

%SJGdns hTrMe p kbun D

DATE 08/27/99*

08/27/99*

08/ )o/99 Of/ L.199 09/7 /99 OFFICIAL RECORD COPY

\\\\Q

7^

I i-*

1

l. '.

- The Honorable Paul Sarbanes'.

The United States Senate 309 Hart Senate Office Building l

. Washington, DC 20510-2002 i

/

Dear Senator Sarbanes:

l I am responding to your letter to Mr. Dennis Rathbun of the U S. Nuclear Regulatory j

Commission (NRC) Office _ of Congressional Affairs dated Juiy 20,1999, in which you refer to a i

letter from William C. Batton, President of the New 7* Derylocratic Civic Club, Inc. In his letter, Mr. Batton expressed support of the renewal application 4f Baltimore Gas and Electric Company for the Calvert Cliffs plants, as well as concerns about)h'e lack of specificity related to the regulatory specifications for license renewal and the dngth of time set aside for public comment.

j in your July 20 letter, you also asked Mr. Rathbun t review the matter and respond.

l In the enclosed copy of the NRC staff response Mr. Batton, we have addressed these issues.

If you have'any questions, please do not hesit e to contact me.

incerely,

]

1 William D. Travers I

Executive Director j

for Operations

Enclosure:

As stated:

' DISTRIBUTION.

See next page

. G:\\RLSB\\SOLORIO\\ Letter to Senator Sarbanes.wpd *See previous concurrence OFFICE PM:RLSB

[ TECH EDITOR LA'-

OGC, g PD:RLE NAME DLSolorM R. Sanders -

S.Uttle JMoorkMo#'CIGrim DATE 04(f/99

/ 08/24/99*

08/25/99*

08/17/99 08/21999

'D:DRM / ADIP h, d D:NRR.

EDO OFFICE '

v

'3 e

NAME' DBMatthews WFKane O'.s \\SJCollins WDTravers DATE 08/ N99 I

08/ h/99 ~

08/

/99 09/

/99 OFFICIAL RECORD COPY i

e The Honorable Paul Sarbanes The United States Senate 309 Hart Senate Office Building Washington, DC 20510-2002

Dear ator Sarbanes:

. I am respon g to your letter to Mr. Dennis Rathbun of the U.S. Nuclear Regulatory Commission (

C) Office of Congressional Affairs dated July 20,1999, in which you refer to a letter from William. Batton, President of the New 7* Democratic Civic Club, Inc. In his letter, Mr. Batton expresse support of the renewal application of Baltimore Gas and Electric Company

{

for the Calvert Cliffs pl ts,' as well as concerns about the lack of specificity related to the

)

regulatory specifications rlicense renewal and the length of time set aside for public comment.

In your July 20 letter, you a o asked Mr. Rathbun to review the matter and respond.

In the enclosed copy of the NR staff response to Mr. Batton, we have addressed these issues.

If you have any questions, please o not hesitate to contact me.

)

Sincerely, Wi m D. Travers Exec tive Director forO rations

Enclosure:

As stated DISTRIBUTION:

1 See next page G:\\RLSB\\SOLORIO\\ Letter to US Senator Sarbanes.wpd *See p vious concurrence OFFICE PM:RL4 TECH EDITOR LA,qQ OGC\\

PD:RLSB NAME DLSoloh MyTon JMoore k CIGrimes DATE 08/k/99 08/ /99 08/ 3/99 08/ /99 \\ 08/ /99

\\

OFFICE D: DRIP -

ADIP D:NRR EDO k

NAME DBMatthews WFKane SJCollins WDTravers DATE 08/

/99 08/

/99 08/ ' /99 09/

/99 OFFICIAL RECORD COPY

NRC FORM 8.

(7-94)

NRCMD 3.57 E-8l INCOMING AND SIGNATURE TAB ho USE THIS SIDE OF THE SHEET TO PRECEDE THE INCOMING MATERIAL WHEN ASSEMBLING CORRESPONDENCE (USE REVERSE SIDE FOR SIGNATURE TAB)

L

NRC FORM 8 (7-94)

NRCMD 3.57 INCOMING AND SIGNATURE TAB USE THIS SIDE OF THE SHEET TO PRECEDE THE SIGNATURE PAGE

-WHEN ASSEMBLING CORRESPONDENCE (USE REVERSE SIDE FOR INCOMING TAB) se O@

8 m

?

L,,

3 b

.y ACTION e

8

! o88 EDO Principal Correspondence Control

  1. LSA EDO CONTROL: Gl9990418 FROM:

DUE: 09/01/99~

DOC DT: 07/20/99 FINAL REPLY:

Senator Paul Sarbanes TO:

Rathbu.

G.

j F0 SIGNATURE OF :

    • GRN CRC NO: 99-0725 Travers, EDO DESC:

ROUTING:

CALVERT CLIFFS POWER PLANT (William C. Batton)

Travers Knapp Miraglia B$b Burns DATE: 08/19/99 Miller, RI ASSIGNED TO:

CONTACT:

_NRR Collins SPECIAL INSTRUCTIONS OR REMARKS:

Ref. Gl9990335 and Gl9990383.

' N 0 h f & : h ll l ^lll' ' ^'L!! k '#

AYM 4)tb L&ud: (la ud if1999 4]l?L &fw : 0 bed /PwurDMR RCTION j

g 21 7 0 ;.'.'l?

D.',,.

.. c y~;; j g

s V788 W 5 /

. _ f j f f f'-

i

o O

F

.;j w

OFFICE OF-THE SECRETARY CORRESPONDENCE CONTROL' TICKET PAPER NUMBER:

CRC-99-0725 LOGGING DATE: Aug 18 99 ACTION OFFICE:

EDO AUTHOR:

PAUL SARBANES, SEN

~ AFFILIATION:

U.S.-SENATE ADDRESSEE:

RATHBUN.

LETTER DATE:

Jul 20 99 FILE CODE: IDR 5 CALVERT CLIFFS

SUBJECT:

CALVERT CLIFFS POWER PLANT ACTION:

Signature of EDO DISTRIBUTION:

SPECIAL' HANDLING: OCA TO ACK-CONSTITUENT:

WILLIAM BATTON NOTES:

DATE DUE:

Sep 1 99 SIGNATURE:

DATE SIGNED:

AFFILIATION:

EDO --G19990418 Lz