ML20212A416: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_____ - _ _-__________ _ ____ ____ ________ _ _ -____                                    _ _ _ _ _  __
{{#Wiki_filter:.
FEB 2 41987 i
FEB 2 41987 i
Docket No. 50-373 Docket No. 50-374 Corntonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690-
Docket No. 50-373 Docket No. 50-374 Corntonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690-


==Dear Mr. Reed:==
==Dear Mr. Reed:==
 
)
                                                                                                                                            )


==SUBJECT:==
==SUBJECT:==
REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. J. M. Keeton, Operator Examiner and Mr. S. Harmon, arrangements were made for an evaluation of the requalification prograin at the LaSalle County Station. The evaluation visit is scheduled for the weeks of June 1 and June 8,1987.
REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. J. M. Keeton, Operator Examiner and Mr. S. Harmon, arrangements were made for an evaluation of the requalification prograin at the LaSalle County Station. The evaluation visit is scheduled for the weeks of June 1 and June 8,1987.
For this visit, the NRC examiner will administer NRC prepared written, oral,                                                         [
For this visit, the NRC examiner will administer NRC prepared written, oral,
and simulator examinations. When the NRC examiner arrives at the site, he                                                             L will meet with the appropriate facility personnel to review the schedule for those examinations. For the exarainer to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," by April 1, 1987. Mr. Harmon has been advised of cur reference material requirements and where they are to be sent.
[
and simulator examinations. When the NRC examiner arrives at the site, he L
will meet with the appropriate facility personnel to review the schedule for those examinations. For the exarainer to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," by April 1, 1987. Mr. Harmon has been advised of cur reference material requirements and where they are to be sent.
This request for-information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989.
This request for-information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989.
Ccracents on burden and duplication iray be directed to the Office of Panagement and Budget, Reports Management Rocm 3208, New Executive Office Building, Washington, D. C. 20503.
Ccracents on burden and duplication iray be directed to the Office of Panagement and Budget, Reports Management Rocm 3208, New Executive Office Building, Washington, D. C. 20503.
Thank you for your consideration in this matter. If you have any questions en the evaluation prccess, please contact Mr. R. D. Lanksbury at (312) 790-5579.
Thank you for your consideration in this matter.
If you have any questions en the evaluation prccess, please contact Mr. R. D. Lanksbury at (312) 790-5579.
Sincerely, Original Signea By C. W. Hehl Charles W. Hehl, Chief Operations Branch
Sincerely, Original Signea By C. W. Hehl Charles W. Hehl, Chief Operations Branch


==Enclosure:==
==Enclosure:==
As stated See Attached Distribution 0703030347 870226 on   AnocK0500g3 N                   I 3M2             2 %S )
As stated See Attached Distribution 0703030347 870226 AnocK0500g3 on N
Lank ury/jlk Burdickb                                                           Ring
I 3M2 2 %S )
                                                                                                          ^7             khl           JM'
Lank ury/jlk Burdickb
^7 khl JM' Ring


Comonwealth Edison Company                         2 Distribution cc w/ enclosure:
Comonwealth Edison Company 2
Distribution cc w/ enclosure:
D. L. Farrar, Director of Nuclear Licensing G. J. Dicderich, Plant Manager DCS/RSS(RIDS)
D. L. Farrar, Director of Nuclear Licensing G. J. Dicderich, Plant Manager DCS/RSS(RIDS)
Licensing Fee Manager.ent Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environn. ental Control Divisicn David Rosenblatt, Governor's Office of Consumer Services R. Crawford, Plant Training Manager i
Licensing Fee Manager.ent Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environn. ental Control Divisicn David Rosenblatt, Governor's Office of Consumer Services R. Crawford, Plant Training Manager i
Line 44: Line 48:
A. Scurnia, Project Manager, NRR J. Hannon, Acting Branch Chief, OLB l
A. Scurnia, Project Manager, NRR J. Hannon, Acting Branch Chief, OLB l


ENCLOSURE 1 Reference Material Requirements for Requalification Program Evaluation
ENCLOSURE 1 Reference Material Requirements for Requalification Program Evaluation 1.
: 1. All administrative procedures (as applicable to reactor operation or safety)
All administrative procedures (as applicable to reactor operation or safety) 2.
: 2. All integrated plant procedures (normal or general operating procedures)
All integrated plant procedures (normal or general operating procedures) 3.
: 3. En.ersency procedures (emergency instructions, abncrmal, or spetici procedures) 4     Standing orders (inportant orders which are safety-related to and may supersede the regular procedures)
En.ersency procedures (emergency instructions, abncrmal, or spetici procedures) 4 Standing orders (inportant orders which are safety-related to and may supersede the regular procedures) 5.
: 5. Fuel-handling and core-loading procedures (initial core-loading procedure,whenappropriate)
Fuel-handling and core-loading procedures (initial core-loading procedure,whenappropriate) 6.
: 6. Ar.nunciator procedures (alarm prccedures, including set points)
Ar.nunciator procedures (alarm prccedures, including set points) 7.
: 7. Radiation protection manual (radiation control manual or procedures)
Radiation protection manual (radiation control manual or procedures) 8.
: 8. Emerger.cy plan implementing procedures
Emerger.cy plan implementing procedures 9.
: 9. Technical Specifications
Technical Specifications
: 10. Lesson plans (training manuals, plant orientation niar,ual, systers descriptions)
: 10. Lesson plans (training manuals, plant orientation niar,ual, systers descriptions)
I       11. Systems operating procedures
I
: 11. Systems operating procedures
: 12. Piping and instrumentation diagrams, electrical single-11ne diagrams, or flow diagrams
: 12. Piping and instrumentation diagrams, electrical single-11ne diagrams, or flow diagrams
: 13. Copies of facility R0 and SR0 requalification examinations administered during the past 2 years 14   An index of administrative, cperating, abncrmal and emergency procedures
: 13. Copies of facility R0 and SR0 requalification examinations administered during the past 2 years 14 An index of administrative, cperating, abncrmal and emergency procedures
: 15. Plant technical data (curu) book l       16. Simulator malfunction list with descriptive suntrary of nalfunction l             effects.
: 15. Plant technical data (curu) book l
: 16. Simulator malfunction list with descriptive suntrary of nalfunction l
effects.
All of the above referenced material shculd be approved, final issues and shculd be so marked. Unccntrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound cr in the form used by the control rocm operators, with appropriate indexes or tables of centents to ensure efficier,t use.
All of the above referenced material shculd be approved, final issues and shculd be so marked. Unccntrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound cr in the form used by the control rocm operators, with appropriate indexes or tables of centents to ensure efficier,t use.
i i
i i
! - -      -                          -_. _. _        _ __                        .}}
.}}

Latest revision as of 20:55, 5 December 2024

Informs That Requalification Program Evaluation Exams Will Be Conducted During Wks of 870601 & 08.Ref Matls Listed on Encl 1 Should Be Submitted by 870401
ML20212A416
Person / Time
Site: LaSalle  
Issue date: 02/26/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8703030347
Download: ML20212A416 (3)


Text

.

FEB 2 41987 i

Docket No. 50-373 Docket No. 50-374 Corntonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690-

Dear Mr. Reed:

)

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. J. M. Keeton, Operator Examiner and Mr. S. Harmon, arrangements were made for an evaluation of the requalification prograin at the LaSalle County Station. The evaluation visit is scheduled for the weeks of June 1 and June 8,1987.

For this visit, the NRC examiner will administer NRC prepared written, oral,

[

and simulator examinations. When the NRC examiner arrives at the site, he L

will meet with the appropriate facility personnel to review the schedule for those examinations. For the exarainer to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," by April 1, 1987. Mr. Harmon has been advised of cur reference material requirements and where they are to be sent.

This request for-information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989.

Ccracents on burden and duplication iray be directed to the Office of Panagement and Budget, Reports Management Rocm 3208, New Executive Office Building, Washington, D. C. 20503.

Thank you for your consideration in this matter.

If you have any questions en the evaluation prccess, please contact Mr. R. D. Lanksbury at (312) 790-5579.

Sincerely, Original Signea By C. W. Hehl Charles W. Hehl, Chief Operations Branch

Enclosure:

As stated See Attached Distribution 0703030347 870226 AnocK0500g3 on N

I 3M2 2 %S )

Lank ury/jlk Burdickb

^7 khl JM' Ring

Comonwealth Edison Company 2

Distribution cc w/ enclosure:

D. L. Farrar, Director of Nuclear Licensing G. J. Dicderich, Plant Manager DCS/RSS(RIDS)

Licensing Fee Manager.ent Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environn. ental Control Divisicn David Rosenblatt, Governor's Office of Consumer Services R. Crawford, Plant Training Manager i

cc w/o enclosure:

A. Scurnia, Project Manager, NRR J. Hannon, Acting Branch Chief, OLB l

ENCLOSURE 1 Reference Material Requirements for Requalification Program Evaluation 1.

All administrative procedures (as applicable to reactor operation or safety) 2.

All integrated plant procedures (normal or general operating procedures) 3.

En.ersency procedures (emergency instructions, abncrmal, or spetici procedures) 4 Standing orders (inportant orders which are safety-related to and may supersede the regular procedures) 5.

Fuel-handling and core-loading procedures (initial core-loading procedure,whenappropriate) 6.

Ar.nunciator procedures (alarm prccedures, including set points) 7.

Radiation protection manual (radiation control manual or procedures) 8.

Emerger.cy plan implementing procedures 9.

Technical Specifications

10. Lesson plans (training manuals, plant orientation niar,ual, systers descriptions)

I

11. Systems operating procedures
12. Piping and instrumentation diagrams, electrical single-11ne diagrams, or flow diagrams
13. Copies of facility R0 and SR0 requalification examinations administered during the past 2 years 14 An index of administrative, cperating, abncrmal and emergency procedures
15. Plant technical data (curu) book l
16. Simulator malfunction list with descriptive suntrary of nalfunction l

effects.

All of the above referenced material shculd be approved, final issues and shculd be so marked. Unccntrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound cr in the form used by the control rocm operators, with appropriate indexes or tables of centents to ensure efficier,t use.

i i

.