ML20212B695: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:. k GE NucIcar Energy I
{{#Wiki_filter:k GE NucIcar Energy I
wnv.m u cw+ny                                         '
wnv.m u cw+ny u;wutwucew 6705 Vakows h> vt Sunol CA 545:>b September 9, 1999 U.S.
u;wutwucew 6705 Vakows h> vt Sunol CA 545:>b September 9,   1999 U.S. Nuclear Regulatory Commission Washington, D.C.       20555 Attention: Document Control Desk
Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Document Control Desk


==Reference:==
==Reference:==
License R-33, Docket 50-73 Gentlemen:
License R-33, Docket 50-73 Gentlemen:
The management and operations organization for the General Electric Nuclear Test Reactor (NTR) is described in Technical Specification 6.1 (Figure 6-1) of License R-33. Although the organizational structure remains the same, the Level 2 manager has changed due to the leave of absence by D. R. Smith. The new Level 2 manager is E. H. Ehrlich.
The management and operations organization for the General Electric Nuclear Test Reactor (NTR) is described in Technical Specification 6.1 (Figure 6-1) of License R-33.
Although the organizational structure remains the same, the Level 2 manager has changed due to the leave of absence by D.
R. Smith.
The new Level 2 manager is E. H.
Ehrlich.
This notification is also intended to fulfill the requirement of 10CFR50.74, " Notification of Change in Operator or Senior Operator Status".
This notification is also intended to fulfill the requirement of 10CFR50.74, " Notification of Change in Operator or Senior Operator Status".
Sincerely, b
Sincerely, b
B. M. Murray Senior Licensing Engineer Regulatory Compliance
B. M. Murray Senior Licensing Engineer
                                                                                            'f) t (925) 862-4455 cc:   M. M. Mendonca T. S. Michaels                                                                     O Director, Region IV USNRC                                                     O
'f)
(                                                                                       '
Regulatory Compliance t
9909200207 990909 PDR   ADOCK 05000073                                                                     (
(925) 862-4455 cc:
P                 ppg 2 ()l 4 9 d U i}}
M.
M.
Mendonca T.
S. Michaels O
Director, Region IV USNRC O
(
9909200207 990909 PDR ADOCK 05000073
(
P ppg 2 ()l 4 9 d U i}}

Latest revision as of 20:37, 5 December 2024

Informs NRC That New Level 2 Manager Is Eh Ehrlich,Due to Leave of Absence by Dr Smith
ML20212B695
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 09/09/1999
From: Murray B
GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9909200207
Download: ML20212B695 (1)


Text

k GE NucIcar Energy I

wnv.m u cw+ny u;wutwucew 6705 Vakows h> vt Sunol CA 545:>b September 9, 1999 U.S.

Nuclear Regulatory Commission Washington, D.C.

20555 Attention: Document Control Desk

Reference:

License R-33, Docket 50-73 Gentlemen:

The management and operations organization for the General Electric Nuclear Test Reactor (NTR) is described in Technical Specification 6.1 (Figure 6-1) of License R-33.

Although the organizational structure remains the same, the Level 2 manager has changed due to the leave of absence by D.

R. Smith.

The new Level 2 manager is E. H.

Ehrlich.

This notification is also intended to fulfill the requirement of 10CFR50.74, " Notification of Change in Operator or Senior Operator Status".

Sincerely, b

B. M. Murray Senior Licensing Engineer

'f)

Regulatory Compliance t

(925) 862-4455 cc:

M.

M.

Mendonca T.

S. Michaels O

Director, Region IV USNRC O

(

9909200207 990909 PDR ADOCK 05000073

(

P ppg 2 ()l 4 9 d U i