ML20212B695

From kanterella
Jump to navigation Jump to search
Informs NRC That New Level 2 Manager Is Eh Ehrlich,Due to Leave of Absence by Dr Smith
ML20212B695
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 09/09/1999
From: Murray B
GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9909200207
Download: ML20212B695 (1)


Text

. k GE NucIcar Energy I

wnv.m u cw+ny '

u;wutwucew 6705 Vakows h> vt Sunol CA 545:>b September 9, 1999 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk

Reference:

License R-33, Docket 50-73 Gentlemen:

The management and operations organization for the General Electric Nuclear Test Reactor (NTR) is described in Technical Specification 6.1 (Figure 6-1) of License R-33. Although the organizational structure remains the same, the Level 2 manager has changed due to the leave of absence by D. R. Smith. The new Level 2 manager is E. H. Ehrlich.

This notification is also intended to fulfill the requirement of 10CFR50.74, " Notification of Change in Operator or Senior Operator Status".

Sincerely, b

B. M. Murray Senior Licensing Engineer Regulatory Compliance

'f) t (925) 862-4455 cc: M. M. Mendonca T. S. Michaels O Director, Region IV USNRC O

( '

9909200207 990909 PDR ADOCK 05000073 (

P ppg 2 ()l 4 9 d U i