ML20212H097: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
                                                                                    p   u
u
    i
p
                                                                              .
i
                                                        MAR     2 1987
.
            Docket No. 50-461
MAR
            Illinois Power Company
2 1987
            ATTN: Mr. W. C. Gerstner
Docket No. 50-461
                      Executive Vice President
Illinois Power Company
            500 South 27th Street           -
ATTN: Mr. W. C. Gerstner
            Decatur, IL 62525
Executive Vice President
                                                      '
500 South 27th Street
            Gentlemen:
-
            This refers to the routine safety inspection conducted by Mr. P. L. Hiland and
Decatur, IL 62525
            others of this office on January 26 through February 24, 1987, of activities
'
            at Clinton Power Station authorized by NRC Operating License No. NPF-55, and
Gentlemen:
            to the discussion of our_ findings with Mr. D. P. Hall and others of your staff
This refers to the routine safety inspection conducted by Mr. P. L. Hiland and
            at the conclusion of the inspection.
others of this office on January 26 through February 24, 1987, of activities
          The enclosed copy of our inspection report identifies areas examined during
at Clinton Power Station authorized by NRC Operating License No. NPF-55, and
!           the inspection. Within these areas, the inspection consisted of a selective
to the discussion of our_ findings with Mr. D. P. Hall and others of your staff
          examination of procedures and representative records, observations, and
at the conclusion of the inspection.
            interviews with personnel.
The enclosed copy of our inspection report identifies areas examined during
          No violations of NRC requirements were identified during the course of this
!
            inspection.
the inspection. Within these areas, the inspection consisted of a selective
          In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
examination of procedures and representative records, observations, and
          this letter and the enclosed inspection report will be placed in the NRC
interviews with personnel.
          Public Document Room.
No violations of NRC requirements were identified during the course of this
          We will gladly discuss any questions you have concerning this inspection.
inspection.
                                                    Sincerely,
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
                                                    ORIGINAL SIGNED BY R. F. WARNICE
this letter and the enclosed inspection report will be placed in the NRC
                                                    R. F. Warnick, Chief
Public Document Room.
                                                    Reactor Projects Branch 1
We will gladly discuss any questions you have concerning this inspection.
          Enclosure:     Inspection Report
Sincerely,
              No. 50-461/87007(DRP)
ORIGINAL SIGNED BY R. F. WARNICE
          See Attached Distribution
R. F. Warnick, Chief
          @
Reactor Projects Branch 1
          RIII             RIII           RIII
Enclosure:
          RR0fv                           RF                                                 f
Inspection Report
          Knop /jp         G             Warn ck                                         (   l
No. 50-461/87007(DRP)
        8703060018 870302                  h~) '-
See Attached Distribution
                                                '
@
                                                                                      $      l
RIII
        PDR       ADOCK 05000461
RIII
  ,    G                     PDR_
RIII
s
RR0fv
RF
f
Knop /jp
G
Warn ck
( l
h~)
$
l
8703060018 870302
'-
PDR
ADOCK 05000461
'
G
PDR_
,
s


c
c
    ~e
~e
  -.
-.
        . Illinois Power Company-           2 $ 3 jg
$
        Distribution
3 jg
        cc w/ enclosure:
. Illinois Power Company-
        DCS/RSB (RIDS)
2
        Licensing Fee Management Branch
Distribution
        Resident Inspector, RIII
cc w/ enclosure:
        Richard Hubbard
DCS/RSB (RIDS)
        Gary N. Wright,' Manager
Licensing Fee Management Branch
            Nuclear Facility Safety
Resident Inspector, RIII
        Mark Jason, Assistant-
Richard Hubbard
            Attorney General,
Gary N. Wright,' Manager
            Environmental Control Division
Nuclear Facility Safety
Mark Jason, Assistant-
Attorney General,
Environmental Control Division
;
;
      -H. S. Taylor, Quality Assurance
-H. S. Taylor, Quality Assurance
            Division
Division
        David Rosenblatt, Governor's
David Rosenblatt, Governor's
            Office of Consumer Services
Office of Consumer Services
,
,
i
i
f
f
L
L
}}
}}

Latest revision as of 06:04, 4 December 2024

Forwards Safety Insp Rept 50-461/87-07 on 870126-0224.No Violations Noted
ML20212H097
Person / Time
Site: Clinton 
Issue date: 03/02/1987
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20212H101 List:
References
NUDOCS 8703060018
Download: ML20212H097 (2)


See also: IR 05000461/1987007

Text

-

u

p

i

.

MAR

2 1987

Docket No. 50-461

Illinois Power Company

ATTN: Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

-

Decatur, IL 62525

'

Gentlemen:

This refers to the routine safety inspection conducted by Mr. P. L. Hiland and

others of this office on January 26 through February 24, 1987, of activities

at Clinton Power Station authorized by NRC Operating License No. NPF-55, and

to the discussion of our_ findings with Mr. D. P. Hall and others of your staff

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

!

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

ORIGINAL SIGNED BY R. F. WARNICE

R. F. Warnick, Chief

Reactor Projects Branch 1

Enclosure:

Inspection Report

No. 50-461/87007(DRP)

See Attached Distribution

@

RIII

RIII

RIII

RR0fv

RF

f

Knop /jp

G

Warn ck

( l

h~)

$

l

8703060018 870302

'-

PDR

ADOCK 05000461

'

G

PDR_

,

s

c

~e

-.

$

3 jg

. Illinois Power Company-

2

Distribution

cc w/ enclosure:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard

Gary N. Wright,' Manager

Nuclear Facility Safety

Mark Jason, Assistant-

Attorney General,

Environmental Control Division

-H. S. Taylor, Quality Assurance

Division

David Rosenblatt, Governor's

Office of Consumer Services

,

i

f

L