    In Reply Refer To:
In Reply Refer To:
    Dockets:   50-445/86-06               AUGS0 ,N
Dockets:
              50-446/86-04
50-445/86-06
  Texas Utilities Generating Company
AUGS0 ,N
  ATTN: Mr. W. G. Counsil
50-446/86-04
          Executive Vice President
Texas Utilities Generating Company
  400 North Olive, L.B. 81
ATTN: Mr. W. G. Counsil
  Dallas, TX 75201
Executive Vice President
  Gentlemen:
400 North Olive, L.B. 81
  This refers to the construction inspection conducted by Mr. H. S. Phillips and
Dallas, TX 75201
  other members of the Region IV Comanche Peak Group during the period February 1
Gentlemen:
  through March 31, 1986, of activities covered by NRC Construction
This refers to the construction inspection conducted by Mr. H. S. Phillips and
  Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station,
other members of the Region IV Comanche Peak Group during the period February 1
  Units 1 and 2, and to the discussion of our findings with you and other members
through March 31, 1986, of activities covered by NRC Construction
  of your staff at the conclusion of the inspection.
Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station,
  Areas examined during the inspection included general plant inspections,
Units 1 and 2, and to the discussion of our findings with you and other members
  structural steel and steel supports, Unit 2 reactor coolant loop welding,
of your staff at the conclusion of the inspection.
  Units 1 and 2 safety-related components, electrical cable installation, and
Areas examined during the inspection included general plant inspections,
  Unit 1 safety related pipe support and restraints. Within these areas, the
structural steel and steel supports, Unit 2 reactor coolant loop welding,
    inspection consisted of selective examination of procedures and representative
Units 1 and 2 safety-related components, electrical cable installation, and
  records, interviews with personnel, and observations by the inspectors. These
Unit 1 safety related pipe support and restraints.
    inspection findings are documented in the enclosed inspection report.
Within these areas, the
  During this inspection, it was found that certain of your activities were in
inspection consisted of selective examination of procedures and representative
  violation of NRC requirements.     Consequently, you are required to respond to
records, interviews with personnel, and observations by the inspectors.
  these violations, in writing, in accordance with the provisions of
These
  Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
inspection findings are documented in the enclosed inspection report.
  Federal Regulations.   Your response should be based on the specifics contained
During this inspection, it was found that certain of your activities were in
  in the Notice of Violation er. closed with this letter.
violation of NRC requirements.
  One unresolved item is identified in paragraph 5 of the enclosed inspection
Consequently, you are required to respond to
  report.
these violations, in writing, in accordance with the provisions of
  We have also examined actions you have taken with regard to previously
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
  identified inspection findings.     The status of these items is identified in
Federal Regulations.
  paragraph 2 of the enclosed report.
Your response should be based on the specifics contained
  The response directed by this letter and the accompanying Notice is not subject
in the Notice of Violation er. closed with this letter.
  to the clearance procedures of the Office of Management and Budget as required
One unresolved item is identified in paragraph 5 of the enclosed inspection
  by the Paperwork Reduction Act of 1980, PL 96-511.
report.
  RIV: SRI
We have also examined actions you have taken with regard to previously
  HSPhillips/tw
identified inspection findings.
                        RI   h         RI     h
The status of these items is identified in
                                        PMithaud
paragraph 2 of the enclosed report.
                                                        C:CP
The response directed by this letter and the accompanying Notice is not subject
                                                        IBarnes
to the clearance procedures of the Office of Management and Budget as required
                                                                      D:DRSP     NRR   .
by the Paperwork Reduction Act of 1980, PL 96-511.
                        PCWagner                                pik EHJohnson VNoonanef/
RIV: SRI
      .W8ti
RI h
  -7M/n
RI
  r
h
                        2./gWe6
C:CP
                        usyn
D:DRSP
                                        7 /25/86
NRR
                                        a,y
.
                                                        F / //86       rf/4/86   f/g /
pik EHJohnson VNoonanef/
                                                                                        y) ,v
HSPhillips/tw
  8609030249 860826
PCWagner
  PDR   ADOCK 05000445
PMithaud
  G                   PDR
IBarnes
                                                                            g[\ \
-7M/n
2./gWe6
7 /25/86
F / //86
rf/4/86
f/g /
,vy)
.W8ti
r
usyn
a,y
8609030249 860826
PDR
ADOCK 05000445
G
PDR
g[\\ \\


  '
      .
    Texas Utilities Generating Company        -2-
    Should you have any questions concerning this inspection, we will be pleased to
    discuss them with you.
                                              Sincerely,
                                                        gang
                                                        "
                                                              SWelEY
                                                            g j@rc
                                              E. H. Johnson, Director
                                              Division of Reactor Safety and
                                                Projects
    Enclosures:
    1. Appendix A - Notice of Violation
    2. Appendix B - NRC Construction Inspection Report
          50-445/86-06
          50-446/86-04
    cc w/ enclosures:
    Texas Utilities Electric Company              Elizabeth B. Johnson
    ATTN:    G. S. Keeley, Manager                Administrative Judge
        Licensing                                  Oak Ridge National Laboratory
    Skyway Tower                                  P. O. Box X, Building 3500
    400 North Olive Street                        Oak Ridge, Tennessee 37830
    Lock Box 81
    Dallas, Texas    75201                        Dr. Kenneth A. McCollom
                                                    1107 West Knapp
    Juanita Ellis                                  Stillwater, Oklahoma 74075
    President - CASE
    1426 South Polk Street                        Dr. Walter H. Jordan
    Dallas, Texas 75224                            881 Outer Drive
                                                  Oak Ridge, Tennessee 37830
    Renea Hicks
    Assistant Attorney General                    Administrative Judge Peter Bloch
    Environmental Protection Division              U. S. Nuclear Regulatory Commission
    P. O. Box 12548                                Washington, D. C. 20555
    Austin, Texas 78711 - 2548
    Texas Radiation Control Program Director
    bec to DMB (IE01)
'
'
    bec distrib. by RIV:
.
    *RPB                           * MIS System               V. Noonan, NRR
Texas Utilities Generating Company
    *RRI-0PS                       *RSTS Operator             S. Treby, ELD
-2-
    *RRI-CONST                     *R&SPB                     R. Martin, RA
Should you have any questions concerning this inspection, we will be pleased to
    *T. F. Westerman, RIV           DRSP                     R. Konklin, IE
discuss them with you.
    *I.Barnes, CPTG               *RIV File                 *D. Weiss, LFMB (AR-2015)~
Sincerely,
    *w/766
gang SWelEY
                                                                          .- -       - -
"
g j@rc
E. H. Johnson, Director
Division of Reactor Safety and
Projects
Enclosures:
1. Appendix A - Notice of Violation
2. Appendix B - NRC Construction Inspection Report
50-445/86-06
50-446/86-04
cc w/ enclosures:
Texas Utilities Electric Company
Elizabeth B. Johnson
ATTN:
G. S. Keeley, Manager
Administrative Judge
Licensing
Oak Ridge National Laboratory
Skyway Tower
P. O. Box X, Building 3500
400 North Olive Street
Oak Ridge, Tennessee 37830
Lock Box 81
Dallas, Texas
75201
Dr. Kenneth A. McCollom
1107 West Knapp
Juanita Ellis
Stillwater, Oklahoma 74075
President - CASE
1426 South Polk Street
Dr. Walter H. Jordan
Dallas, Texas 75224
881 Outer Drive
Oak Ridge, Tennessee 37830
Renea Hicks
Assistant Attorney General
Administrative Judge Peter Bloch
Environmental Protection Division
U. S. Nuclear Regulatory Commission
P. O. Box 12548
Washington, D. C.
20555
Austin, Texas 78711 - 2548
Texas Radiation Control Program Director
bec to DMB (IE01)
'
bec distrib. by RIV:
*RPB
* MIS System
V. Noonan, NRR
*RRI-0PS
*RSTS Operator
S. Treby, ELD
*RRI-CONST
*R&SPB
R. Martin, RA
*T. F. Westerman, RIV
DRSP
R. Konklin, IE
*I.Barnes, CPTG
*RIV File
*D. Weiss, LFMB (AR-2015)~
*w/766
.
-
-- -- - --
.
.
.-
-
-
-
}}
}}

Latest revision as of 04:19, 4 December 2024

Forwards Const Insp Repts 50-445/86-06 & 50-446/86-04 on 860201-0331 & Notice of Violation.One Unresolved Item Noted
ML20212P719
Person / Time
Site: Comanche Peak  
Issue date: 08/26/1986
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20212P724 List:
References
NUDOCS 8609030249
Download: ML20212P719 (2)


See also: IR 05000445/1986006

Text

=

.

In Reply Refer To:

Dockets:

50-445/86-06

AUGS0 ,N

50-446/86-04

Texas Utilities Generating Company

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive, L.B. 81

Dallas, TX 75201

Gentlemen:

This refers to the construction inspection conducted by Mr. H. S. Phillips and

other members of the Region IV Comanche Peak Group during the period February 1

through March 31, 1986, of activities covered by NRC Construction

Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station,

Units 1 and 2, and to the discussion of our findings with you and other members

of your staff at the conclusion of the inspection.

Areas examined during the inspection included general plant inspections,

structural steel and steel supports, Unit 2 reactor coolant loop welding,

Units 1 and 2 safety-related components, electrical cable installation, and

Unit 1 safety related pipe support and restraints.

Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspectors.

These

inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Your response should be based on the specifics contained

in the Notice of Violation er. closed with this letter.

One unresolved item is identified in paragraph 5 of the enclosed inspection

report.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

RIV: SRI

RI h

RI

h

C:CP

D:DRSP

NRR

.

pik EHJohnson VNoonanef/

HSPhillips/tw

PCWagner

PMithaud

IBarnes

-7M/n

2./gWe6

7 /25/86

F / //86

rf/4/86

f/g /

,vy)

.W8ti

r

usyn

a,y

8609030249 860826

PDR

ADOCK 05000445

G

PDR

g[\\ \\

'

.

Texas Utilities Generating Company

-2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

gang SWelEY

"

g j@rc

E. H. Johnson, Director

Division of Reactor Safety and

Projects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Construction Inspection Report

50-445/86-06

50-446/86-04

cc w/ enclosures:

Texas Utilities Electric Company

Elizabeth B. Johnson

ATTN:

G. S. Keeley, Manager

Administrative Judge

Licensing

Oak Ridge National Laboratory

Skyway Tower

P. O. Box X, Building 3500

400 North Olive Street

Oak Ridge, Tennessee 37830

Lock Box 81

Dallas, Texas

75201

Dr. Kenneth A. McCollom

1107 West Knapp

Juanita Ellis

Stillwater, Oklahoma 74075

President - CASE

1426 South Polk Street

Dr. Walter H. Jordan

Dallas, Texas 75224

881 Outer Drive

Oak Ridge, Tennessee 37830

Renea Hicks

Assistant Attorney General

Administrative Judge Peter Bloch

Environmental Protection Division

U. S. Nuclear Regulatory Commission

P. O. Box 12548

Washington, D. C.

20555

Austin, Texas 78711 - 2548

Texas Radiation Control Program Director

bec to DMB (IE01)

'

bec distrib. by RIV:

  • RPB
  • MIS System

V. Noonan, NRR

  • RRI-0PS
  • RSTS Operator

S. Treby, ELD

  • RRI-CONST
  • R&SPB

R. Martin, RA

  • T. F. Westerman, RIV

DRSP

R. Konklin, IE

  • I.Barnes, CPTG
  • RIV File
  • D. Weiss, LFMB (AR-2015)~
  • w/766

.

-

-- -- - --

.

.

.-

-

-

-