{{#Wiki_filter:}}
l I
i REACTOR CONTAINMENT BUILDING                                                                              ,
j                                                                INTEGRATED LEAKAGE RATE TEST TYPES A, B AND C PERIODIC TEST                                                                            :
i l                                                                LONG ISLAND LIGHTING COMPANY 1
1 i                                                                                SHOREHAM NUCLEAR l                                                                                  POWER STATION j                                                                                  UNIT NO. 1 l
s
                                                              ,                  JANUARY 1987 4
4 4
t
;                                                                                                                                                                          i I
1 i
a Prepared by STONE & WEBSTER' ENGINEERING CORPORATION.
BOSTON, MASSACHUSETTS 6
O 8704240158 B70421 PDR                    ADOCK 05000322 P                                PDR          +
    . - - . . . . - , - = _ . . . . ,            _ - . . , .      - _ _ , .        _ -    , _ - . . - _ . , - - . . . _ _ - - - . _ . - . _ - , _ . , . . . . - . ,
 
TABLE OF CONTENTS                                                                                                i l
                                                                                                                                                                                                    \
Section                            Title                                                                                              Page a TABLE OF CONTENTS                                                                                        11 i                                                      LIST OF ATTACHMENTS                                                                                iii l-i                                                      REFERENCES                                                                                              iv I
1                                PURPOSE                                                                                            1-1 2                               
 
==SUMMARY==
2-1 2.1            TYPE A TEST                                                                        2-1 2.1.1          Test Summary                                                                        2-1 2.1.2          ILRT Betterment Program                                                            2-2 2.1.3          Conclusion                                                                          2-3 2.2                                                                                                2-4 LOCAL LEAKAGE RATE TESTS (TYPES B AND C)
.:                    3                                TYPE A TEST                                                                                  3.1-1 l                                                      3.1            EDITED LOG OF EVENTS 3.1-1 4
3.2            GENERAL TEST DESCRIPTION                                                      3.2-1 i
3.2.1          Prerequisites                                                                  3.2-1 3.2.2          Equipment and Instrumentation                                                  3.2-2 3.2.3          Data Acquisition System                                                        3.2-2 3.2.4          Data Resolution System                                                        3.2-2
;                                                      3.3            TEST RESULTS                                                                  3.3-1 3.3.1          Presentation of Test Results-                                                  3.3-1 3.3.2          60.696 psia ILRT Results                                                      3.3-1                                          ,
i                                                      3.3.2.1        ILRT Results - Mass Point Analysis                                            3.3-1 3.3.2.2        ILRT Results - Total Time Analysis                                            3.3-2                                          '
3.3.2.3        Supplemental Test Results                                                      3.3-2                                          '
4                                LOCAL LEAKAGE RATE TESTS (TYPES B AND C)                                                          4-1 1
O 11
      ,-e  --
                        .r          7  -- -.y -.,,-,    w,      -
                                                                      -.c-          , _ , . _.    -~ -.          _ , . , , , , ,.,_, n        --..  ,-...,,,w    - wt-- m- w r w n e--r- - m -f
 
LIST OF ATTACHMENTS ATTACHMENT                                  TITLE 2.1A          Graph 1 - Drywell Temperature versus Time 2.1B          Graph 2 - Containment Mass versus Time 3.2A          Site Meteorology 3.2B          Instrumentation List 3.2C          ILRT Temperature Detector Locations 3.2D          ILRT Dew Point Temperature Detector Locations 3.3A          ILRT Reduced Input Variables 1
3.3B          ILRT Absolute Test Method - Mass Point Analysis Test Results
                  ,3.3C        ILRT Absolute Test Method - Total Time Analysis Test Results 3.3D          Graph 3 - Containment Mass vs. Time 3.3E          Graph 4 - Leakage Rate and UCL vs. Time, Mass Point Analysis 3.3F          Graph 5 - Leakage Rate and UCL vs. Time, Total          ''
Time Analysis 3.3G          Superimposed Leakage Verification Test, Reduced Input Variables 3.3H          Superimposed Leakage Verification Test, Absolute Test Method - Mass Point Analysis Test Results 3.3I          Suparimposed Leakage Verification Test, Absolute Test Mef. hod - Total Time Analysis Test Results 3                  4A            l'186 Local Leakage Rate Test Data                                                                '
4B            1984 Local Leakage Rate Test Data 4C            Leakage Penalties Added to Type A Leakage                                                            l I
()                                                                                                                                  l iii i
    . - - . _ . _ . -        - _ ~ ~ _ .                  _ . . _ . _    - _ . _ .          ~ . _ _ . . -  , . . - - .
                                                                                                                          , . ~ .
 
REFERENCES
: 1. 10CFR50, Appendix J Primary Reactor Containment Leakage Testing For Water-Cooled Power Reactors, October 22, 1980.                                          1
: 2. SP.84.654.01, Shoreham Nuclear Power Station, Primary Containment Leakage                l Rate Test - Type A.                                                                      J l
: 3. ANSI N45.4, American National Standard Leakage-Rate Testing of Containment              i Structures For Nuclear Reactors, March 16, 1972.
: 4. ANSI /ANS-56.8, Con {ainmentSystemLeakageTestingRequirements, February 19, 1981.
o                                                                                              .
4 1
1 1
This document used only as a guideline and any reference to said document in no way implies compliance.
O iv
 
SECTION 1 PURPOSE The purpose of this report is to present a description and analysis of the January 1987 Periodic Type A Primary Containment Integrated Leakage Rate Test (ILRT) and a summary of the Periodic Types B and C Local Leakage Rate Tests -
(LLRT's) conducted since December 1982 at the Shoreham Nuclear Power Station Unit No. 1 (SNPS), which is owned and operated by the Long Island Lighting Company (LILCO).
Stone & Webster Engineering Corporation (SWEC) provided engineering consultation services to LILCO during the performance of this test.
This report is submitted as required by 10CFR50, Appendix J, Paragraph V.B.
O I
O                                                                                                                                        1 1-1
 
l l
SECTION 2 1
2.1' TYPE A TEST
,          2.1.1      Test Summary Pressurization' for the ILRT began at 0625 hours on January 19, 1987, and was momentarily secured at 0632 hours with approximately a 1 psi increase in containment pressure to ensure the Reactor Protection System (RPS) drywell pressure transmitters were not increasing. Primary _ Containment pressurization was resumed at 0640 hours with a fairly constant pressurization rate of 6 psi per hour being maintained throughout the remainder of the pressurization period.
Extensive investigations of all penetration areas for leakage were conducted during the pressurization period and throughout the Type A Teet. Only minor leakage paths were identified. . Containment pressurization equipment was secured at approximately 1340 hours with a peak instantaneous pressare of 62.2 psia.
Upon securing containment pressurization, reactor vessel level transmitter 1B21*LT-155A indicated a low vessel level. The "A" vessel level indication had continuously decreased during the pressurization sequence as compared to the."B" i,
train. IB21*LT-155A was isolated at approximately 1658 due to' false low level indication. This was done to avoid an Emergency Core Cooling System (ECCS) trip initiation signal. It was determined that the transmitter vent connection had a minor leak which resulted in a decreasing reference leg. This leakage path was determined to be insignificant from a Type A Test criteria standpoint.                          See Section 3.3 and Attachment 4C.
I          Temperature, dewpoint, and pressure data was continuously recorded throughout the entire test period at 20 minute intervals.                The temperature stabilization                  I i          criteria was satisfied at 2205 hours on January 19, 1987.                                                      l
* 1 The stability in the temperature trend was interrupted at approximately 0050                                  l hours on January 20, 1987 when service water was initiated to the Residual Heat
;.        Removal System Heat Exchanger (RHR Ex) . This abrupt cooling of the reactor coolant water temperature decreased the primary containnent air temperature. As shown on Attachments 2.1A and 2.1B, the impact on the Drywell Air Temperature and Containment Mass trends was dramatic. The start time of the Type A Test had
!          to be shifted to 0745 hours when the previous reactor coolant temperature                                  -
1 control scheme was reestablished which, in turn, provided a fairly stable temperature trend.
J The Type A Test was successfully completed at 0745 hours on January 21, 1987 with a Mass Point Upper Confidence Limit (UCL-MP) of 0.183373 percent / day and a Total Time Upper Confidence Limit (UCL-TT) of 0.210653 percent / day, (See Section
;          3.3, Test Results).            Both the Mass Point and Total Time leakage rates were well
,          below the 0.75 La acceptance criteria of 0.375 percent per day.
The Superimposed Leakage Verification Test was started. at 0925 hours and was                                  ;
successfully completed at 1325 hours on January 21, 1987. :The results of the                                  l verification test satisfied the requirements set forth in Reference 2,                      (See Section 3.3, Test Results).                                              -
Depressurization of the primary containment commenced at 2215 hours on January V      21, 1987, and was completed at 1000 hours on January 22, 1987.
2-1 l
J l
 
1 l
Effect of Drywell Ventilation System Operation on Volume Fractions The volume fractions for Zones A&D, see Attachment 3.2B, required the operation of the Drywell Ventilation System.' The drywell head volume portion of Zone A is ducted to the drywell ventilation fans located in the lower drywell floor region or Zone D.      On an effort to obtain a straight line plot of the drywell air temperature, the January 1987 ILRT was performed with the ventilation system fans secured and the cooling water to the drywell unit coolers isolated. As can
;        be seen from the drywell temperature data shown on Attachment 3.3A, the desired goal was achieved.      The change to the volume fractions were recognized to be small, so they were not changed prior to the test. The calculation was revised in March 1987 and the leakage rates were recalculated. The results show a very slight increase for both the Mass Point and Total Time Analysis. This change is judged to be insignificant as the reported leakage rates are approximately half the 0.75 La acceptance criteria. However, on future ILRT's the revised weight factors will be used whenever the drywell fans are secured.
2.1.2    ILRT Betterment Program
+
The following items are some of the measures that were taken since the preoperational Type A test was performed to improve the ILRT/LLRT programs and to ensure a successful periodic ILRT.
: a. Various leakage rate test procedures were thoroughly reviewed and revised.
,              b. Tight leakage repair limits were placed on containment isolation valves.
: c. Utilization of the LLRT makeup air test method.
: d. Frequent testing of containment isolation valves due to the restricted Power Ascension Program,
: e. Various containment isolation valves were reworked or replaced as described in Attachments 4A and 4B.
: f. Performance of a continuance extensive leakage investigation plan                      '
throughout the test period.
i              g. Presentations of an Appendix J - 10CFR50 Test Program Briefing Session l                  to plant personnel.
i
: h. Strict access control both prior to and during the performance of the
;                  test.
: i. Coordination and involvement of plant management. and department personnel to ensure a successful test.
6 O
2-2
 
E 2.1.3    Conclusion The January 1987 Shoreham. Nuclear Power Station Unit No. 1 Type A _ Test is
<        considered a successful test in that it demonstrated the leak-tightness of the primary containment boundary. The Upper Confidence Levels (UCL) were well below
!        the plants' procedural acceptance criteria.                                      The success of this test can be attributed to the plant's ILRT betterment improvements as previously discussed.
4 J
      +
I j
2-3 i
 
2.2 LOCAL LEAKAGE RATE TESTS (TYPES B AND C)
The Local Leakage Rate Tests (LLRT's) of containment isolation valves and other primary containment penetrations were conducted as required by the methods described in the plant surveillance procedures SP.84.654.03, " Primary Containment Leakage Rate Test - Type C", and SP.84.654.02, " Primary Containment Leakage Rate Test - Type B" since the last Type A Test performed in December 1982.
Section 4 of.this report summarizes the data for the two surveillance periods (1984 and 1986) of LLRT's conducted since the last Type A Test in accordance with Appendix J. 10CFR50, Paragraph V.B. Also contained in Section 4 of this report, are the leakage penalties that were added to the Type A Test leakage results.
O l
                                                                                                            ~~
l                                                                                                              l i
O                                                                                                            i 2-4
                                                                                                                )
            - . . . . -  -                          . - _            ~  -    - . - . - - . . . . . - - -
 
557.9 -  -
0 W
A I
                                                                                                                                        ~
O_
I W
F  557.8 -  -
1 i
)                                  i                I                                                                                I 4                4 e                m
:                                                ns i
e                s
:                                  20 Jan 1987 RTTRCHMENT-2.1R i
TIME - HOURS              DRYNELL TEMP VS. TIME
            ~  ~
SHOREHRM INTEGRRTED LERKRGE RRTs TEST 1
4 l'    _ _ _ _        _            _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ .
 
3 ,        '                                      , '
T Nl                        S E
T E
T R
R
-                                              E M        E I        G T        R B            K 1      .      R
                                            .S          E 2V            L TS            D l
eeNe      NS            E ERHT MMRR H          HR CLEG 7    RRRE 8    TTOT 9    TOHN 1    RTSI n
a J
0 2
leews        S R
U O
H E
M I                '
l T
_  -        -      -  -            ~                  _
_  -        -      -  -            ~                  _
0        0      0  0 5        4      3  2 1        1      1  1 9        9      9  9 9        9      9  9 n
EI  I mmEE
(
 
  ..u_  . _ . .        >y    a                    a    w        .-                                  .                      .a      .-.. -              ..
                                                                                                                                                                              .e          .
F
(
SECTION 3 TYPE A TEST 3.1 EDITED LOG OF EVENTS This log was . edited from information contained in ' the Test Director's ILRT Official Type A Log of Events, and Control Room Watch Engineers Log.
January 18,-1987 Y
1715 -                Suppression chamber interior inspection completed, no unusual conditions noted.
2224 -                Drywell interior inspection completed, no unusual conditions noted.
Performed LLRT's on suppression chamber access hatch and personnel airlock door seals, all acceptable.
January 19, 1987 0625 -                Commenced pressurization of the primary containment. Initial j                                                            drywell pressure 14.5 psia.
I 0632 -                Secured pressurization of the primary containment with the
* drywell pressure at 15.4 psia to confirm that RPS Drywell pressure I            ,                              transmitters are not changing and that the process indications are
;                                                            increasing.
;                                    0640 -                Resumed pressurization of the primary containment.
Pressurization rate approximately 6 psi /hr.
0700 -                Initiated an extensive leakaFe investigation of all accessible penetration areas.
I 0845 -                Pressurization rate approximatelg 6 psi /hr.
.                                                            Average Drywell temperature 98.5 F.
Average Suppression Chamber temperature 81.6 F.                                                                                                                    5a 1000 -                Observed minor leakages on various penetrations.
1305 -                Reduced primary containment pressurization rate and established the MSIV air blocks.
4 1340 -                Secured primary containment pressurization at a peak instantaneous pressure of 62.2 psia.                                                                                                                                  j
,                                    1658 -                Isolated 1B21*LT-155A (ECCS) due to a minor instrument leak                                                                                                            l which caused a false low vessel indication.                                                                                                                            i l
(
1
!                                                                                                          3.1-1                                                                                                                  '
_ . . - _          . , _ . _ _ _ . _ -            . _ ~ . . . , . _ . _ . . _ _ _ _    _ , _ . . . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ , _ _ _ . . . _ _ _ _ _ _ _ . , _ _ . , . . _ . . . . , _ .
 
  - '                                                                  ~        '          ~~
l l
      \~-              1745 -  Vented primary containment pressurization header and began containment temperature stabilization period..
2046 -  Observed minor leakages on various penetrations.
2205 -  Satisfied containment stabilization criteria and began the 24 hour ILRT test period.
4 January 20, 1987 1
0050 -  Abrupt change to the reactor coolant temperature caused by the extended jogging of service water to the RHR Hx.
0530 -  Observed minor leakages on various penetrations.
0745 -  Restarted the 24 hour ILRT test period due to the RHR heat exchanger / service water perturbation.
January 21, 1987 0745 -  Successfully completed the ILRT.
0800 -  Started induced leakage.
0925 -  Commenced superimposed leakage verification test.
Os              1325 -  Successfully completed the superimposed leakage verification test.
2215 -  Commenced primary containment depressurization.
January 22, 1987 1000 -  Completed primary containment depressurization.
l i
k i
I O
3.1-2
 
9 E
O    3.2 GENERAL TEST DESCRIPTION 3.2.1            Prerequisites In accordance with the Shoreham Nuclear Power Station Unit No. 1 ILRT procedure, SP.84.654.01, the_ following is a listing of the pertinent prerequisites completed and documented prior to primary containment pressurization:
: a. Controlled access plan in effect.
4
: b. General    inspection        of  the      accessible            interior                  and              exterior I
surfaces  of  the primary          containment structures and components completed.
,                            c'. All Type B and C local leakage rate testing completed and/or reviewed for impact on the Type A test.
: d. All  test    instrumentation        calibrated                or  functionally                            verified within 6 months of the test.
i
: e. All required system valve lineups completed.
: f. Briefing of all test personnel assigned to'the Type A test.
i
: g. All ILRT computer software used                          for    test        calculations,                      tested O                      and operational.
: h. The Official Type A Log of Events established, to be maintained by the Test Director or his designee.
: i. Site  meteorology data ' recorded beginning at                                  least            three          days        ;
!                                prior to and during the ILRT (Attachment 3.2A).
: j. Temporary    air      compressors      and              tast    skid          checked                      out    and l-                              available for pressurization.
: k. All equipment that could be damaged by test pressure, removed or                                                              -
'                                protected.                                                    -
.j                            1. Closure of all containment isolation valves by their normal means.
* J i
j.
l I
!O 3.2-1 l
 
        -                              ~-                -    .                -                      -  .  -    .                    .      .-.
  ;                        -3.2.2          Equipment and Instrumentation f                          Pressurization of the primary containment was achieved by the utilization 'of a                                                                                          .
I temporary system consisting of four air compressors manifolded to af tercoolers and refrigerant air dryers.                          The system included adequate instrumentation and valving to maintain proper monitoring and control of the compressed air quality throughout                    the- pressurization                      sequence.      The    total                    capacity                of  the I
pressurization system was rated at approximately 3,600 standard cubic feet per minute (SCFM). Air was supplied to the primary containment through the plant's permanent ILRT system, which includes additional components and instrumentation for monitoring and controlling containment pressurization.
The various containment parameters required to calculate primary containment leakage during the test, were monitored using-instrumentation which consisted of 16 resistance temperature detectors, 6 dewpoint temperature sensors, and 2 absolute            pressure        quartz          manometers.                Pertinent              data            for                the  test 4
instrumentation is listed in Attachment 3.2B, and the general locations of the test instrumentation for both the drywell and suppression chamber are shown in Attachments 3.2C and 3.2D.
]                          A rotometer was used to perform the superimposed leakage verification test.
t 3.2.3          Data Acquisition System The Shoreham Nuclear Power Station Unit No. 1 ILRT' sensor data were recorded at
  ;                        approximately 20 minute intervals during the test. A programmable, multichannel j                        data' logger was used to scan and record data from the 16 resistance temperature i
detectors signal inputs, along with manual local recordings of the 6 dewpoint temperature sensors and 2 manometers.                                      Data readings of the rotometer were also
!                        manually recorded.
!                        3.2.4          Data Resolution System The recorded data was inputted to the Stone & Webster-Engineering Corporation's (SWEC) portable computer for data reduction and leakage rate calculations. Both
:                          the Mass Point and Total Time Analysis Methods were used to determine the leakage rate.                                                                                                                                                            ~
k l
l L
i 1
O l
l                                                                                                    3.2-2 I
    - - - , . , - - ,,,,_m    . , , - ,    ,~,-.--~,,e---        v,.-,--- .,____,,,,-_,.-.,-..~.r                      . _ . . . < - - - . . . .      ,-..,w.---,,,--        ~~,,,-.-,.e
 
: ^ :- -. . . .. .
                                                        '-                                    ^ ~ ~ ^ ^ ' ~
1 Absolute Method of Mass Point Analysis The Absolute Method of Mass Point Analysis consists of calculating the air mass within the containment structure, over the test period, using pressure, temperature, and dewpoint temperature observations made during the ILRT.                                                                                The air mass is computed using the ideal gas law as fc11ows:
1 M = 144V(P-Pv)-
RT                                                                                        (Eq. 1)
,              where:            M = air mass, 1bm P = total pressure, psia Pv = average vapor pressure, psia R = 53.35 ft-lbf/lb                    R(for air)
T = average containEent temperature,                                                  R,j V = containment free volume, 328,750 ft The leakage rate is then determined by plotting the air mass as a function of.-
time, using a least-squares fit to determine the slope, A = dM/dT. The leakage rate is expressed as a percentage of the air mass lost in 24 hours or symbolically:                                          -
Leakage Rate = A/B(-2400)                                                                                (Eq. 2)
Where A is the slope of the least-squares curve and B is the y-intercept.                                                                                The                                  -
sign convention is such that the leakage out of the cont'ainment is positive, and O-          the units are in percent / day.
The air mass is calculated and the result is correlated as a function of time by means of least-squares curve fit of the form:
1                                  M = At + B                                                                                                (Eq. 3)
The slope A and y-intercept B are then used in Equation 2 to - determine the leakage rate.
A confidence interval is calculated using a Student's T distribution.                                                                          The sum                                    s._
of the leakage rate and considence interval is the Upper Confidence Limit                                                                                        -
Mass Point (UCL-MP).
Absolute Method of Total Time Analysis
;              The Absolute Method of Total Time Analysis consists of calculating air lost from i
the containment, using pressure,                                  temperature,                            and    dewpoint                  temperature observations made during the ILRT.                                                                                                                                                              ,
O                                                                                                                                                                                                            ,
3.2-3                                                                                                                          i l
i
                                                            - - . . , ,  ,m,.._    . . - . , , . . , _ . , , , _ , - .        . - - _ _ .    , _ . . . - ,
 
4 The containment air mass is computed using Equation 1. The measured leakage rate at any time (t) is then determined by subtracting the mass at that time (Mt) from the initial mass (Mi) and ' dividing by the initial mass. The measured
.        leakage rate is expressed as a percentage of containment mass lost in 24 hours or symbolically:                                                                                                                                                      4 4
Measured Leakage Rate =              Mi - Mt                            (2400)                  (Eq. 4)
Mi ( A t)
The sign convention is such that leakage out of the containment is positive, and the units are in percent / day.
The calculated leakage rate is then determined by plotting the measured leakage
        ' rate as a function of time and then performing a least-squares curve fit of the                                                                                      '
measured leakage rate values as follows:
Calculated Leakage Rate = At + B                                                                (Eq. 5) where, A is the slope and B is the y-intercept of the least squares curve.
The sum of the calculated leakage rate and the confidence interval is the Upper Confidence Limit - Total Time (UCL-TT).                                                                                                                                -
O                                                                        .
l l
m; 3
l O
3.2-4
                                                                                                    --..-,,c.,,,,,-_,,,,..--#-ym,,_.,,--n..            ,-e,.w,---wev,, , . . ,
  -            - . . - - . , . - , . . . . , . .~      ,-o  ,. ..,.-,p,,-      - , , . _ , , , .
 
O                                            O ATTACHMENT 3.2A O
SITE METEOROLOGY Barometric      Primary Reactor  Secondary Reactor    Secondary Reactor Pressure      Bldg. Dew Point  Bldg. Wet Bulb Temp. Bldg. Temp.
Date        Time  (in. Hg.)          ( C)                  ( F)              ( F)            .
January 16, 1987  0100  30.19              8.3                  58.0              80.0 0500  30.24              9.4                  58.0              81.0 0900  30.29              6.1                  57.0              79.0        -
1300  30.30              15.5                56.0              80.0 1700  30.32              10.0                56.0              88.0-2100  30.35              11.6                54.0              77.0 January 17, 1987  0100  30.38              17.7                54.0              80.0 0500  30.38              16.1                56.0              81.0 0900  30.41              -
53.0              79.0          -,
1300  30.40              2.4                  53.0              78.0 30.47              7.2                  53.0              80.0 1700 2100  30.48              5.0                  53.0              78.0 January 18, 1987  0100  30.40              7.7                  55.0              82.0 0500  30.36              6.1                  55.0              81.0 0900  30.30              3.8                  56.0              77.0 1300  30.10              7.2                  59.0              78.0          '
1700  29.92              6.1                  62.0              81.0 2100  29.85              6.3                  57.0              79.0 January 19, 1987  0100  29.90              10.4                57.0              77.0 0500  29.90              11.5                56.0              77.0 0700  30.0              14.9                '56.0              77.0 0800  29.98              15.7                55.0              77.0 0900  29.98              17.3                56.5              79.0 1000  29.95              18.3                57.0              79.0-
                -1100  29.92              19.2                58.0              79.0              .
1200  29.86              20.2                57.0              79.0 1300  29.81              20.9                55.5              78.0 Page 1 of 3 c                                      .
 
_ _ _ _ . _      . .___ _ __      _ . _ _ _ . _ _ . _      . _ . _ - ..            . _ _ __. m    -  _ . . _  - _ . . . . .
ATTACHMENT 3.2A (Continutd)                                                                  .;
SITE METEOROLOGY i                                                    Barometric          Primary Reactor              Secondary Reactor                  Secondary Reactor Pressure          Bld. Dew Point              Bldg. Wet Bulb Temp.                    Bldg. Temp.
Date            Time                (in. Hg.)                  ( C)                      ( F)                              ( F)
January 19, 1987 1400                    29.77                  22.3                      55.5                              78.0 1500                    29.77                  23.6                      55.0                              77.5              -
:                                  1600                    29.73                  23.6                      58.0                              78.0 l                                  1700                    29.59                  23.6                      55.0                              77.0 l'                                1800                    29.55                  23.5                      56.0                              77.0 1900                    29.50                  23.3                      55.0                              77.0
* 2000                    29.59                  23.2                      58.0                              78.0
,                                  2100                    29.63                  23.2                      55.0                              76.5 2200                    29.68                  23.2                      55.0                              77.0  .
t                                2300                    29.72                  23.2                      55.0                              76.0 2400                    29.70                  23.1                      55.0                              78.0 January 20, 1987 0100                    29.74                  23.1                      56.0                              79.0 0200                    29.87                  23.1                      56.0                              79.0' 0300                    29.93                  23.1                      55.0                              78.0
  !                                0400                    29.92                  23.1                      54.0                              78.0
;                                  0500                    29.99                  23.1                      55.0                              78.0
  +                                0600                    30.01                  23.0                      54.0                              78.0 0700                    30.06                  23.0                      54.0                              79.0 0800                    30.09                  23.0                      54.0                              79.0 0900                    30.13                  23.0                      54.0                              78.0 1000                    30.17                  23.0                      54.0                              78.0 1100                    30.15                  22.9                      54.0                              78.0          -
l                                1200                  30.15                    22.9                      54.0                              77.0 1300                  30.12                  -22.9                      54.0                              78.0 l                                1400                  30.11                    23.0                      55.0                              78.0 1500                    30.11                  23.0                      56.0                              79.0-
  !                              1600                  30.14                    23.0                      54.5                              78.0 j                                1700                    30.13                  22.9                      54.0                              77.0 '
1800                  30.14                    22.8                      54.0                              76.0 l
1 1
l                                                                              Page 2 of 3 l'
 
_ _ _ _ __ _ . . . _ _ _ . _ _ _      . _ .      _ _. .__ __          .__      _  _ . _  . . _ . . . . ~      .  . . _ . _          .
:              O                                                              O ATTACHMENT 3.2A (Continusd)
O  .
SITE METEOROLOGY Barometric              Primary Reactor          Secondary Reactor                Secondary Reactor
;                                            Pressure              Bldg. Dew Point          Bldg. Wet Bulb Temp.                  Bldg. Temp.
Date                    Time                                    ( C)                                ( F)                  ( F)
(in. Hg.)                            .
January 20, 1987        1900        30.15                    22.9                                54~.5                76.0 2000        30.16                    22.9                                54.5                  78.0 2100        30.15                    22.7                                54.0                  77.0
;                                  2200        30.12                    23.0                                53.5                  77.0
]                                  2300        30.13                    22.9                                54.0                  77.0 2400        30.13                    22.9                                53.5                  76.5 j        January 21, 1987        0100        30.1                      22.9                                  53.0                  76.5 0200        30.1                      22.9                                53.0                  76.0 0300        30.1                      22.9                                  53.0                  76.5 1
0400        30.87                    23.0                                  53.0                  76.5 1
0500        30.08                    23.0                                  53.0                  77.0 1                                  0600        30.09                          -
53.5                  77.0 0700          -
23.0                                  -                    -
0800          -
23.0                                  54.0                  78.0' I                                  0900        30.12                    23.0                                  53.0                  77.0          1 1000        30.12                    23.0                                  54.0                  77.0          '
1100      '30.10                    23.0                                  54.0                  77.0
,                                  1200        30.07                    23.0                                  55.0                  78.0 1300        30.06                    23.0                                  54.0                  78.5          ,
1400        30.07                    23.0                                  55.0                  79.0 I
i e
1 Page 3 of 3
 
ATTACHMENT 3.2B                                                    ,
INSTRUMENTATION LIST i
i The following instruments were calibrated and functionally verified within 6 months prior to the performance                        ;
of this test and in accordance with 10CFR50, Appendix. J, using instrumentation traceable to the National Bureau of Standards.
Weight                        Computer                              -
Instrument              Factor          Channel        Point          Range        Zone      Accuracy i
A. Temperature 1T49-TE001          0.166666            CH-0          L673        50-150 F                E    1.0 F IT49-TE002          0.166667            CH-1          L674        50-150 F                E    1.0 F 1T49-TE003          0.166667            CH-2          L675        50-150 F                E    1.0 F              l 1T49-TE004          0.166666            CH-3          L676        50-150 F                F  it.0 F IT49-TE005          0.166667            CH-4          L677        50-150 F                F    1.0 F 1T49-TE006          0.166667            CH-5          L678        50-150 F                F  11.0 F                I IT49-TE009          0.096361            CH-6          L696        50-150 F                B    1.0 F 1T49-TE010-          0.098122            CH-7          L691        50-150 F                A    1.0 F IT49-TE011          0.096361            CH-8          L692        50-150 F                B  11.0 F                >
IT49-TE012            0.098122            CH-9          L693        50-150 F            -A    11.0 F                ,
IT49-TE013            0.100238            CH-10        L679        50-150 F                D  11.0 F 1T49-TE014            0.103440            CH-11        L680-        50-150 F                C  11.0 F IT49-TE015            0.100238            CH-12        L681        50-150 F                D    1.0 F IT49-TE016            0.103440            CH-13        L682        50-150 F                C    1.0 F-IT49-TE017            0.100238            CH-14.        L683        50-150 F                D  11.0 F IT49-TE018            0.103440            CH-15        L684        50-150 F                C  11.0 F B. Dew Point IT49-ME020            0.500000          LOCAL          L668      -50  to    100 C        J    0.3 C IT49-ME021            0.500000          LOCAL          L669      -50  to    100 C        J  10.3 C IT49-ME022            0.305517          LOCAL          L670      -50  to    100 C        H  10.3 C IT49-ME023            0.305517          LOCAL          L672      -50  to    100 C        H  10.3 C              J m,
IT49-ME024            0.194483          LOCAL          L685      -50  to    100 C        G  10.3 C 1T49-ME025            0.194483          LOCAL          L686      -50  to    100 C        G  10.3 C Page 1 of 2 r                                                                                          -;
 
O                                            O ATTACHMENT 3.2B (Continutd)-
O INSTRUMENTATION LIST Weight                    Computer Instrument      Factor      Channel        Point      Range      Zone          Accuracy C. Pressure IT49-PIT 030      1.0        LOCAL            NA    0-100 psia  Drywell      10.02% range IT49-PIT 031      NA          LOCAL            NA    0-100 psia  Spare        0.02% range IT49-PIT 032      1.0        LOCAL            NA    0-100 psia  Supp. Pool !0.02% range D. Superimposed Leakage Verification Test Flow Instrument Rotometer        NA          LOCAL            NA    0-10 scfm    Drywell      11.0% F.S.
Page 2 of.2 l'
 
1              #
e        15'00'00" O                                                                                                                        si  o 1                      I                                ,
1 l
l 230' TE TE      55'                                                    i                                                    10
                                                                          #                      4 12                                          ',                1 i
350'        TE EL.130' -- =              ----
                                                                                                                                        ~
                                                                    'N      l                l      *R                                14 0*        TE TE          ie5'                              ,                ,
11 l                l        W                                            16 I
EL IO2' - --                            --                .
TE      25' R ,4 A
I
['  /                              195*
18 TE
                                                              \
14                                AREA        -6    s        d-                                                          15 E L 8 3 '--                                                                                      \                                                        l TE        85'                    \h                hA\\\                \
320'          TE 13                                                                                C\
ggg D                                      37 O
                                                                      ..                      f EL. 68'                                                                                              '/
TE    11 5 '                                                          ,                    p              235'        TE 1          N                  fc f            r
                                                                                                                            #                          3              ;
g g, 5 0*-. - . - - .                        je
                                                                / 'l
                                                                  ,- /
)                                                  .-
                                                                                                                //
                                                                                //
f/ ''N TE      55'                  '
295*        TE y                        N NN;'          N .x y f E L . 3 4' - - - - - -- -A
                                                                                                      \N            '
C~
TE      175'y                                                                                                                          ._ l 5                                                                                          \ 355'                    TE l
2 i
1 NOTE ACTUAL RTD ELEVATIONS                                                                                                                          1 ARE t, 5 '
t ATTACHMENT 3.2C ILRT TEMPERATURE DETECTOR LOCATIONS O                                                                              SHOREHAM NUCLEAR POWER STATION-UNIT I i
I
                                                                    -.--.---.----_t.,..---.._-                                        - - . -          . . - - .
 
a
                                                                                                              ?
0                                15'00'00"
                                                                                                              $  fl l
ME                    O'                                                                        175'                        ME 24                                            , ,            i, 25 m            i E L.125'- -            -    -        -        -  -
l            l l
1 l            l REA G '                l ' AREA G l            l ME          95*                                                                                2750                          ME 22                                            .x                -                                                            23 EL.78'- -                                            k Mb
                                                                      \
ME          20'            /                  )        f                    L
                                                                                                                  /,                                        2 EL.42'- -            -        -        --
(
_- _-_-      M              -__ -
NOTE ACTUAL SENSOR ELEVATIONS ARE i 5' ATTACHMENT 3.2D ILRT DEW POINT TEMPERATURE DETECTOR LOCATIONS SHOREHAM NUCLEAR POWER STATION-UNIT 1
 
4 3.3 TEST RESULTS 3.3.1    Presentation of Test Results The test data for the January 1987 ILRT is based on a 24 hour period starting at 0745 hours on January 20, 1987. The final test results were determined using SWEC's ILRT computer program. The reduced input data, Mass Point Analysis Test Results, Total Time Analysis Test Results, Superimposed Leakage Verification Test Results and representative graphs are contained in Attachments 3.3A through 3.3I.
Both the Mass Point and-Total Time Analysis test results for the ILRT satisfied the procedural acceptance criteria.
The Type A test instrumentation was verified by the Superimposed Leakage Verification Test Method.      Both the Mass Point and Total Time Analysis test results for the Superimposed Leakage Verification Test satisfied the procedural acceptance criteria.
3.3.2    60.696 psia ILRT Results The ILRT was conducted in accordance with the Shoreham Nuclear Power Station Unit No. I surveillance test procedure SP.84.654.01. The results for the ILRT and for the supplemental test are shown below.
("';    3.3.2.1  ILRT Results - Mass Point Analysis L;'
Item                            (Percent / Day)
: 1. Lam, Leakage Rate Calculated                0.181272
: 2. UCL, Upper Confidence Level                  0.002101
: 3. UCL-MP, Lam Leakage Rate                    0.183373 plus UCL (1&2)
: 4. Corrections for:
(See Attachment 4C)
: 1. Type B Penalties                          0.044019        -
: 11. Type C Penalties                          0.004962 111. H Recombiner 2
A&B Loops                    0.025863 iv. Instrument Leakage                        0.008839
: v. Flowmeter Corrections                    0.004190 (1. through iv.)
vi. Water Levels                              0.000000 vii. Total Corrections                            0.087873 (1. through vi.)
: 5. Total reported Type A Leakage Rate          0.271246 (Items 3&4)
Results were within the acceptable limits of 0.75 La or 0.375 percent / day.
ID
;    /
w/
3.3-1 l
 
3.3.2.2  ILRT Results - Total Time Analysis Item                            (Percent / Day)
: 1. La, Leakage Rate Calculated                  0.171133
: 2. UCL,~ Upper Confidence Level-                0.039520
: 3. UCL-TT, Lam Leakage Rate                    0.210653 plus UCL (1&2)
: 4. Corrections for:
(See Attachment 4C)
: 1. Type B Penalties                          0.044019 11.. Type C Penalties                            0.004962 iii. H Recombiner A&B Loops 2
                                                                . 0.025863 iv. Instrument Leakage                        0.008839
: v. Flowmeter Corrections                    0.004190 (i.'through iv.)
vi. Water Levels                              0.000000 vii. Total Corrections                            0.087873 (1. through vi.)
: 5. Total reported Type A Leakage Rate          0.298526 (Items 3 & 4)
Results were within the acceptable limits of 0.75 La or 0.375 percent / day.
3.3.2.3  Supplemental Test Results The Supplemental Verification Test was performed using the Superimposed Leakage Verification Test Method in accordance with station surveillance test procedure
- SP.84,654.01. The results for the Superimposed Leakage Verification Test are shown below.
: 1. The Superimposed Leakage Verification Test is acceptable provided Le falls within the following range:
(Lam + Lo - 0.25La) i Le f(Lam + Lo + 0.25La)                                                  e--
Where : Lam = Type A calculated leakage (computer)
(Lam - MP = 0.181272 %/ day)
(Lam - TT = 0.171133 %/ day)
Lo = Superimposed leakage rate developed from rotometer (Lo = 0.530278 %/ day)
La = Maximum allowable leakage rate (La = 0.5 %/ day)
Le = Composite leakage (computer)
(Lc - MP = 0.690156 %/ day).
(Lc - TT = 0.716023 %/ day)
O 3.3-2
 
3
)                  a. Mass Point 1
(0.181272 + 0.530278 - 0.125) 6 0.690156 6 (0.181272 + 0.530278 +~0.125)      ,
;                                            (0.58655) f 0.690156 6 (0.83655)
: b. Total Time
]                        (0.171133 + 0.530278 - 0.125) i 0.716023 6 (0.171133 + 0.530278 + 0.125) j-                                                                                                  '
!                                            (0.576411) $ 0.716023 $ (0.826411)
I                  The Superimposed Leakage Verification Test met the requirements set forth . in i                  Reference 2.
l i
i
!O                                                                                                          r 4
i l
l 1
i u
l i
i i
i I
t l                      .
i l                                                            3.3-3 i
 
    - .. - - - - -      -    -  .        .          - =      _ . - . . - _ , -      - -    _ - .        -    . . . - ~ .
;                    O                                                              O ATTACHMENT 3.3A
                                                                                                              .                    O l
!                                                            INTEGRATED LEAKAGE RATE TEST i                                            FROM 0745 HOURS ON 01/20/87 TO 0745 HOURS ON 01/21/87 REDUCED INPUT VARIABLES I
DRYWELL                                                            SUPPRESSION CHAMBER
!                            ABS. VAP.        ABS.                                        ABS.      VAP.      ABS.
TIME    PRESS. PRESS.      TEMP.            DEWPOINT              PRESS.      PRESS.      TEMP.      DEWPOINT.
!                  (HRS)  (PSIA)  (PSIA)      ( R)                      ( F)          (PSIA)      (PSIA)      ( R)          ( F)'
?
}                  0745    61.795  0.4020      558.139          73.020                61.798      0.4510      538.151    76.460
+
0805    61.795  0.4033      558.178          73.110                61.798      0.4510      538.154    76.460 0825    61.794  0.4008      558.198          72.930                61.795      0.4510      538.142    76.460 0845    61.791  0.4025      588.188          73.055                61.794      0.4524      538.136    76.550 0905    61.790  0.4033      558.203          73.110                61.793      0.4524      538.131    76.550 61.791      0.4497      538.119    76.370 0925    61.789  0.4028      558.235          73.075 0945    61.786  0.4018      558.235          73.000                61.788      0.4524      538.117    76.550 1                  1005    61.785  0.3995      558.240          72.835                61.787      0.4524      538.119    76.550 i
1025    61.785  0.4042      558.252          73.180                61.787-      0.4524      538.116    76.550 l                  1045    61.783  0.4008      558.263          72.930                61.785      0.4537      538.107    76.640 l
1105    61.782  0.4027      558.272          73.070                61.784      0.4537      538.086    76.640 1125    61.781  0.4051      558.288          73.245                61.783      0.4537      538.079    76.640 1145    61.781  0.4030      558.304          73.090                61.783      0.4537      538.081    76.640-  1 4
1205    61.780  0.4033      558.319          73.110                61.782      0.4537      538.076    76.640 I
1225    61.776  0.4022      558.326          73.035                61.778      0.4537      538.074    76.640 1245    61.776  0.4020      558.336          73.020                61.778      0.4537      538.081    76.640 1305    61.775  0.4055      558.344          73.275                61.777      0.4551      538.074    76.730 1325    61.773  0.4003      558.368          72.890                61.775      0.4565      538.072    76.820 1345    61.772  0.4003      558.367          72.890                61.774      0.4565      538.057    76.820    ,
{                  1405    61.771  0.3991      558.373          72.800                61.772      0.4565      538.067    76.820
{                  1425    61.771  0.4006      558.395          72.910                61.773      0.4565      538.067    76.820 1                  1445    61.769  0.3986      558.402          72.765                61.771      0.4565      538.054    76.820 j                  1505    61.767  0.4008      558.414          72.930                61.769      0.4565      538.059    76.820 j                  1525    61.767  0.4018      558.422          73.000                61.768      0.4565      538.047    76.820 1545    61.765  0.3971      558.424          72.655                61.767      0.4565      538.049    76.820 1605    61.763  0.4016      558.424          72.985                61.765      0.4565      538.046    76.820 1                1625    61.763  0.4016      558.424          72.985                61.763      0.4578      538.031    76.910    9 l                1645    61.762  0.4006      558.437          72.910                61.763      0.4565      538.027    76.820 i                1705    61.760  0.3993      558.457          72.820                61.761      0.4551      538.031    76.730 t
                                                                                                                                          '1 Page 1 of 3                                                ''
(
 
!                      O                                            O ATTACHMENT 3.3A (Continued)
O j                                                                                                                      i REDUCED INPUT VARIABLES DRYWELL                                          SUPPRESSION CHAMBER 4'
                            . ABS. VAP.      ABS.                          ABS. VAP.        ABS.
TIME  PRESS. PRESS.      TEMP.        DEWPOINT        PRESS. PRESS.      TEMP. DEWPOINT (HRS) (PSIA)    (PSIA)      ( R)            ( F)        (PSIA)  (PSIA)      ( R)        ( F) 1725  61.770  -0.4008      558.467      72.930          61.761  0.4565      538.031  76.820 72.930          61.759  0.4578      538.026  76.910 3
1745  61.758  0.4008      558.471                                                            ..
1805  61.758  0.4008      558.484      72.930          61.759  0.4578      538.024  76.910'
;                    1825  61.758  0.3991      558.503      72.805          61.759  0.4578      538.021  76.910 4                    1845  61.756  0.4004      558.513      72.895          61.758  0.4578      538.027  76.910 1905  61.755  0.4004      558.509      72.895          61.757  0.4578      538.016  76.910 i                    1925  61.754  0.4004      558.516      72.895          61.755  0.4578      538.017  76.910 1945  61.753  0.3999      558.529      72.860          61.754  0.4592      538.019  77.000 2005  61.752  0.3994      558.535  ,
72.825          61.754  0.4592      538.012  77.000 2025  61.750  0.4004      558.538      72.895          61.752  0.4592      538.009  77.000
,                    2045  61.750  0.3999      558.550      72.860          61.751  0.4592      538.007-  77.000
.                    2105  61.749  0.1?49      558.570      72.860          61.750  0.4592      538.006  77.000
              .      2125  61.749  0.1043      558.583      72.860          61.750  0.4592      538.012  77.000 2145  61.747  0.3*' t      558.579      72.805          61.747  0.4592      538.009  77.000 2205  61.746  0.*999      558.604      72.860 ^        61.747  0.4592      538.011  77.000 2225  61.745  0. 4 1      558.594      72.875          61.745  0.4592      537.999  77.000 4                    2245  61.742  0.3y/,      558.590      72.695          61.742  0.4592      538.001  77.000 l                    2305  61.742  0.4001      558.588      72.875          61.742  0.4592      537.999  77.000 2325  61.742  0.4001      558.602      72.875          61.742  0.4606-      538.001  77.090 l                    2345  61.741  0.3991    .558.609      .72.805          61.741  0.4606      538.001  77.090 0005  61.741  0.3984      558.627      72.750          61.742  0.4606      338.001  77.090 0025  61.741  0.3987      558.637      72.770          61.742  0.4606'    '537.997  77.090 l                    0045  61.742  0.4011      558.671      72.950          61.742  0.4606      537.996  77.090
?-                  0105  61.741  0.3999      558.682      72.860          61.741  0.4606      537.992  .77.090 l                    0125  61.738  0.3996      558.694      72.840          61.739  0.4606      537.997  77.090
!                    0145  61.734  .0.4018      558.660      73.005          61.735  0.4606      537.989  77.090 72.860                'O.4606      537.984 0205  61~.731  0.3999      558.636                      61.731                        77.090 i
0?25  61.729  0.4006      558.628      72.915          61.730  0.4606      537.986  77.090 j                    0245  61.729'  0.4006      558.633      72.915          61.729  0.4606      537.989,  77.090
^
                  - 0305  61.729  0.4018-      558.658      73.005          61.729  0.4592      537.989  77.000
:                    0325  61.729  0.3991      558.665      72.805          61.729  0.4619      537.987  77.180 Page 2 of 3 l'
 
O                                        O ATTACHMENT 3.3A (Continutd)
O REDUCED INPUT VARIABLES DRYWELL                                        SUPPRESSION CHAMBER ABS.  .VAP.      ABS .-                        ABS. VAP.      ABS.                ;
TIME  PRESS. PRESS.      TEMP.        DEWPOINT        PRESS. PRESS.      TEMP. DEWPOINT (HRS) (PSIA) (PSIA)      ( R)          ( F)          (PSIA) (PSIA)      ( R)        ( F) 0345  61.728 0.3994      558.679      72.825          61.728 0.4619      537.986  77.180    '
0405  61.726 0.3998      558.684      72.855          61.726 0.4606      537.982  77.090    ;
0425  61.726 0.4006      558.678      72.910          61.726 0.4619      537.982  77.180 0445  61.723 0.4020      558.676      73.020          61.723 0.4619      537.979  77.180  .i 0505  61.721 0.4011      558.677      72.950          61.721 0.4619      537.984  77.180    c 0525  61.721 0.4011      558.684      72.950          61.721 0.4606      537.982  77.090    !
0545  61.721 0.4011      558.693      72.950          61.721 0.4619      537.981  77.180 0605  61.719 0.4011      558.694      72.950          61.718 0.4606      537.976  77.090 0625  61.719 0.4004      558.698      72.895          61.718 0.4619      537.981  77.180 0645  61.718 0.4006      558.714      72.915          61.718 0.4619      537.979  77.180 0705  61.718 0.4006      558.717      72.915          61.718 0.4619      537.982  77.180 0725  61.718 0.4016      558.737      72.985          61.718 0.4619      537.982  77.180 0745  61.716 0.4016      558.759      72.985          61.716 0.4633      537.969  77.270 Page 3 of 3 I
 
4 1                                            ATTACHMENT 3.3B INTEGRATED LEAKAGE RATE TEST
;              ,      FROM 0745 HOURS ON 01/20/87 TO 0745 HOURS ON 01/21/87 l
ABSOLUTE TEST METHOD, MASS POINT ANALYSIS TEST RESULTS                                    l TIME.        MASS            LEAKAGE          CONF.              UCL (HRS)        (LBM)          (PCT / DAY)    (PCT / DAY)        (PCT / DAY) 0745        99075.62        0.000000      0.000000            0.000000 0805        99070.23        0.000000      0.000000            0.000000 0825        99068.33        0.264916      0.625881            0.890797 0845        99063.91        0.269122      0.096520            0.365642 0905        -99060.47        0.266057      0.044790            0.310847 0925        99058.07        0.252125      0.031605            0.283730 0945        99052.44        0.263971      0.025222            0.289193 1005        99052.25        0.248089      0.025420            0.273509 1025        99046.95        0.249790      0.019288            0.269078 1045        99045.47        0.242901      0.016816            0.259717 1105        99042.87        0.236692      0.015046            0.251738 1125        99037.98        0.237671      0.012421            0.250092 1145        99038.18        0.229953      0.013124            0.243077 1205        99035.12        0.224889      0.012311            0.237200 1225        99029.00        0.227084      0.010829            0.237913 1245        99027.73        0.225583      0.009541            0.235124 1305        99021.58        0.228901      0.009023            0.237924 1325        99019.9.9      0.229231      0.007991            0.237222
      - )      1345        99019.62        0.226272      0.007717            0.233989 1405        99017.04        0.223567      0.007432            0.231000 1425        99014.12        0.221413      0.007040            0.228454 1445        99013.06        0.218085      0.007192            0.225277 1505        99006.13        0.218658      0.006575            0.225233 1525        99004.64        0.217996      0.006049            0.224045 1545        99006.07        0.214508      0.006539            0.221047 1605        98999.01        0.214316      0.006028            0.220344 1625        98997.91        0.213097      0.005700            0.218797 1645        98997.71        0.210658      0.005805            0.216463 1705        98994.29        0.208948      0.005653            0.214601                  s_:
1725        98990.94        0.207780      0.005393            0.213172
,                1745        98986.74        0.207413      0.005051            0.212464 1805        98985.57        0.206418      0.004829            0.211247 1825        98985.49        0.204522      0.004897            0.209419 1845        98980.26        0.203824      0.004655            0.208479                    !
1905        98979.92        0.202387      0.004604            0.206991 1925        98976.85        0.201269      0.004480            0.205749
!                1945        98973.25        0.200582      0.004287            0.204869 2005        98972.66        0.199357      0.004230            0.203587 2025        98968.50        0.198708      0.004060            0.202768 2045        98967.19        0.197775      0.003960            0.201734 2105        98963.59        0.197193      0.003806            0.200999 2125        98961.82        0.196462      0.003692            0.200154                  .
2145        98959.24        0.195800      0.003576            0.199376 Page 1 of 2 l
l
                                                                                                              \
 
ATTACHMENT 3.3B (Continued)
(        ABSOLUTE TEST METHOD, MASS POINT ANALYSIS TEST RESULTS l
i TIME      MASS        LEAKAGE              CONF.              UCL (HRS)    (LBM)        PCT / DAY)        (PCT / DAY)      (PCT / DAY)      ,
2205    98954.96      0.195573          0.003419        0.198992 2225    98954.40      0.194929          0.003325        0.198253 2245    98952.07      0.194293          0.003238        0.197531 2305    98950.10      0.193598          0.003171        0.196769 2325    98947.61      0.192955          0.003101        0.196056 2345    98946.16      0.192173          0.003068        0.195241 0005    98945.70      0.191108          0.003119        0.194228 0025    98944.71      0.189894          0.003218        0.193112 0045    98940.03      0.189142          0.003178        0.192320 0105    98938.73      0.188273          0.003170        0.191443 0125    98933.16      0.187934          0.003069        0.191003 0145    98928.79      0.187884          0.002957        0.190841 0205    98927.89      0.187608          0.002863        0.190471 0225    98925.38      0.187351          0.002773        0.190124 0245    98923.94      0.186975          0.002701        0.189676 0305    98921.17      0.186661          0.002626        0.189287 0325    98921.23      0.186064          0.002602        0.188666 0345    98918.08      0.185592          0.002557        0.188149 0405    98915.15      0.185206          0.002502        0.187708 O
  \_/
0425 0445 98914.11 98908.33 0.184693 O.184565 0.002472 0.002397 0.187165 0.186962 0505    98905.48      0.184480          0.002324        0.186805 0525    98905.82      0.184119          0.002280        0.186399 0545    98904.10      0.183712          0.002246        0.185958 0605'    98901.42      0.183353          0.002207        0.185560 0625    98900.45      0.182886          0.002189        0.185075 0645    98897.73      0.182474          0.002163        0.184637 0705    98897.13      0.181934          0.002165        0.184099                ,
0725    98894.28      0.181466          0.002152        0.183619                '
0745    98888.85      0.181272          0.002101        0.183373 i                                                                                        !
l l
l O
Page 2 of 2
 
            .      ~.-      .    .                        ..                    .        -    .
i.
ATTACHMENT'3.3C-INTEGRATED LEAKAGE RATE TEST FROM 0745 HOURS ON 01/20/87 TO 0745 HOURS ON 01/21/87 ABSOLUTE TEST METHOD, TOTAL TIME ANALYSIS TEST RESULTS MEAS.      MEAN OF          CALC.
(TIME)    MASS        LEAKAGE      MEAS.    . LEAKAGE                            CONF. _        UCL                      ,
(HRS)    (LBM)      (PCT / DAY)  (PCT / DAY) (PCT / DAY)                      (PCT / DAY)  (PCT / DAY) 0745    99075.62    0.000000    0.000000    0.000000                        0.000000          0.00000~
0805    99070.23    0.391619    0.000000    0.000000                        0.000000          0.00000 0825    99068.33    0.264914    0.000000    0.000000                        0.000000          0.00000                    ;
0845  -99063.91    0.283666    0.000000    0.259423                        0.575270          0.83469 0905    99060.47    0.275147    0.000000    0.254237                        0.250692          0.50492.
0925    99058.07    0.255049    0.000000    0.241498                        0.165099          0.40659 l    0945'    99052.44    0.280730    0.000000    0.249528                        0.145770          0.39529 1005'    99052.25    0.242646    0.000000    0.237263                        0.119711          0.35697 1025    99046.95    0.260412    0.000000 'O.237660                          0.108570          0.34623
;    1045    99045.47    0.243434    0.000000    0.231999                        0.097169          0.32916 1105    99042.87    0.237987    0.000000    0.226620                        0.088687          0.31530 1125    99037.98    0.248651    0.000000    0.226518                        0.084484          0.31100 1145    99038.18    0.226727    0.000000- 0.220265                          0.078519          0.29878 1205    99035.12    0.226404    0.000000    0.215711                        0.073996          0.28970 1225    99029.00    0.241971    0.000000    0.216434                        0.072723          0.28915 1245    99027.73    0.232005    0.000000    0.214786                        0.070114          0.28490 1
1305    99021.58    0.245461    0.000000    0.216708                        0.069872          0.28658 1325    99019.99    0.237787    0.000000    0.216748                        0.068291.        0.28503 4
1345    99019.62    0.226069    0.000000    0.214504                        0.065903          0.28040 1405    99017.04    0.224056    0.242237    0.212366                      0.063788          0.27615 1425    99014.12    0.223445    0.253409    0.210568                        0.061978          0.27254 1445    99013.06    0.216478    0.244652    0.207908                        0.060093          0.26800 1505    99006.13    0.229539    0.242883    0.207953                        0.059403          0.26735 1525    99004.64    0.224268    0.239913    0.207210                        0.058343.        0.26555 1545    99006.07    0.210586    0.236685    0.204497                        0.056777          0.26127 1605    98999.01    0.222684    0.235067    0.204036                        0.056036          0.26007 I    1625    98997.91    0.217189    0.231890    0.202896                        0.055044          0.25794 4
1645    98997.71    0.209702    0.230243    0.200904                        0.053861-        0.25476 1705    98994.29    0.211071    0.227776    0.199389                        0.052879          0.25226-1725    98990.94    0.212185    0.226213    0.198246                        0.052076          0.25032                  -
4 1745    98986.74    0.215286    0.225078    0.197671                        0.051544          0.24921 1805    98985.57    0.211100    0.223201    0.196687                        0.050860          0.24754 1825    98985.49    0.204689    0.222099    0.195083                        0.050015          0.24509 1845    98980.26    0.209992    0.221278    0.194297                        0.049483          0.24378 1905    98979.92    0.204542    0.219407    0.193012                        0.048793          0.24180
:    1925    98976.85    0.205074    0.218060    0.191944                        0.048205          0.24014 1945    98973.25    0.206648    0.216120    0.191177                        0.047754          0.23893 1    2005    98972.66    0.202211    0.214341    0.190052                        0.047137          0.23723
}    2025    98968.50    0.204849    0.213280    0.189323                        0.046/87          0.23611
;    2045    98967.19    0.202048    0.212179    0.188410                        0.046328          0.23473                  i i
2105    98963.59    0.203527    0.211183    0.187744                        0.045980          0.23372                    l 1    2125    98961.82    0.201700    0.210445    0.186987                        0.045603          0.23259
!O
;                                          Page 1 of 2 i
)  .
 
ATTACHMENT 3.3C (Continued)
ABSOLUTE TEST METHOD, TOTAL TIME ANALYSIS TEST RESULTS MEAS.            MEAN OF        -CALC.
i TIME    MASS      ' LEAKAGE              MEAS.        LEAKAGE      CONF.                  UCL (HRS)    (LBM)      (PCT / DAY)          (PCT / DAY)  (PCT / DAY)  (PCT / DAY)            (PCT / DAY) 1 1            2145'  98959.24    0.201360            0.209036    0.186285 ~0.045259                    0.23154-
!            _2105    98954.96    0.203913            0.208018    0.185891      0,045058                0.23095
}            2225    98954.40    0.200216            0.207499    0.185225      0.044738                0.22996 3
2245  -98952.07    0.199524            0.206341    0.184572      0.044429                0.22900 2305-  98950.10    0.198290            0.205396    0.183883      0.044114                0.22799-l            2325  -98947.61    0.197930            0.204808    0.183234      0.043822                0.22705 2345    98946.16    0.195994            0.204054    0.182494      0.043501              -0.22599 0005    98945.70    0.192688            0.203079    0.181561- 0.043124                    0.22468 0025    98944.71. 0.190264~            0.201828    0.180522      0.042728                0.22325 0045    98940.03    0.193207            0.200933'  O.179793      0.042443              '0.22223 0105    98938.73    0.191303            0.200264    0.178986      0.042136                0.22112 0125    98933.16    0.195330            0.199531    0.178542      0.041983                0.22052 0145    98928.79    0.197602            0.199184    0.178306      0.041931                0.22023 2
0205    98927.89    0.195190            0.198690    0.177928 -0.041803                    0.21973 i            0225    98925.38    0.194962 'O.198105              0.177571      0.041685                0.21925 0245    98923.94    0.193376            0.197664    0.177141      0.041530                0.21867 0305    98921.17    0.193522            0.197097    0.176758- 0.041398                    0.21815 i            0325    98921.23    0.190166            0.196503    0.176189      0.041187                0.21737'            ,
0345    98918.08    0.190813            0.195868    0.175707      0.041014                0.21672 0405    98915.15    0.191177            0.195341    0.175286      0.040870                0.21615 0        0425 0445 0505 98914.11 98908.33 98905.48 0.189309 0.192966 0.193192 0.194739 0.194191 0.193840 0.174783 0.174545 0.174344 0.040691 0.040635 0.040595 0.21547 0.21518 0.21493        -
,            0525    98905.82    0.189835            0.193356    0.173962      0.040465                0.21442 0545    98904.10    0.188860            0.192884    0.173552      0.040323                0.21387
  ;          0605    98901.42    0.188940            0.192435    0.173177      0.040197                0.21337 I
0625    98900.45    0.187208            0.191995    0.172731      0.040042'-              0.21277 0645    98897.73    0.187352            0.191729    0.172324      0.039904                0.21222 0705    98897.13    0.185304            0.191481    0.171832      0.039734                0.21156 0725    98894.28    0.185610            0.191101    0.171389      0.039585                0.21097
;            0745    98888.85    0.188508            0.190961    0.171133      0.039520-              0.21065 L
k i
I iO l
1 Page 2 of 2 i
L . _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ .._ _.. _ _
 
n                      H
                                                                                                                                                              -0020-@                        -
O                                                                                                                                                        -0090 c                    W
                                                                                                                                                              -00SO 8                        $
z
                                                                                                                                                              -0090 -            W m        I          w
                                                                                                                                                              -00E0              p          @
                                                                                                                                                              -0020 m              x m        -      C
                                                                                                                                                                              . (D          W i                                                                                                                                                      -
                                                                                                                                                              -0010        m>              _J j                                                                                                                                                      -
                                                                                                                                                              -8092        $$
wcrF
                                                                                                                                                              -00E2        Irme I          Iz i                                                                                                                                                      -    -802g        uJwe cczw
~
                                                                                                                                                                            &HOH
                                                                                                                                                              -0012        soIz e n en n
                                                                                                                                                              -0002
                                                                                                                                                              -0061
                                                                                                                                                              -0081
                                                                                                                                                              -8021
                                                                                                                                                              -8091                                    l i
(n
                                                                                                                                                              -8091          QC                        i 3                        !
                                                                                                                                                              -80&I m  N      O.                        ,
I
                                                                                                                                                              - 00 E I '"      ;
i                                                                                                                                                      -
                                                                                                                                                              -0021 c        W a
)                                                                                                                                                      -
                                                                                                                                                              -80!! 5        h                      ,
                                                                                                                                                              -8001 $        H I
                                                                                                                                                              -8060
                                                                                                                                                              -8080 2      I            i          t                                    i                                            t                                                    i                        I I            I          I                                    I                                            I                                                    I                        I I
t                b          b                                  b                                            b tn          S                                  tn                                            G S          S                                  cn                                            in                                      -    -
01          01                                  CD                                            (D
!                  (n          01                                  01                                            Cn                                      . .
O 1
WEl - SSWW                                                                                                                ..
i l
1 f
'_._.-._..,..____....._ _ . . _ . _ _ _ _ _ _ . . . . . , _ _ _ . _ _ _ _ _ _ _ _ _ _ _ ~ _ _ _ _ . _ _ . _ _ _ _ _ _ _ . . - _ _ _ - , _ . . _ , .
 
O._ O
                                                                  .                                                                                      N                          F EI                                                      '
                                                                                                                                                -0020 $                              $
                                                                                                                                                          ~
                                                                                                                                                -0090 O E[__J  (_)
c                        W g3
                                                                                                                                                -00SO 8                              $.
m
                                                                                                                                                -0060 m          W              w
                                                                                                                                                -00E0                  I              e H              c WF                M
                                                                                                                                                -0020              m                  e
                                                          .                                                                                                        . .              w
                                                                                                                                                -0010              mW                J
                                                                                                                                                -00v2              $a worF
                                                                                                                                                -00E2              roem 1              1x
                                                                                                                                                -0022              oawe
                                                    .                                                                                                            c zw
                                                    -                                                                                                            >rO>
                                                                                                                                                -0012              sczz
                                                  .                                                                                                                m J U) H
                                                                                                                                                -0002
                                                                                                                                                -0061 l
                                                                                                                                                -0081
                                                                                                                                                -0041 l                                                                                                -
                                                                                                                                                -0091
                                      "                                                                                                                            m
                                                                                                                                                -00E1 '            %
                                    '                                                                                                                                3
                                                                                                                                                -0061 co  N      O I
                                                                                                                                                -00EI *-            1 i
                                                                                                                                                -0021      c m      Ld 0011 h        E
* H                              ,
                                                                                                                                                -0001 $            h
                                                                                                                                                  -0060 1
i                                                                                                                                          -
                                                                                                                                                  -0080 t                                                t                                                          I                                                                  i 1
m                                                            -
i                                                        AWQ/% - 730                                                                        __
INIOd SSWW                                                                    _ _
AUG/% - 3188 3DBMW37                                                                                          __
i
                                                                                                                          . , , . . . . - - - ~ _ . . ,        . -  - - - - - , , ,    , - - - - -
 
                  . - ~                                  -  ..
F-- l--                                :                                  N          H 1.--l--.                              '
                                                                          -0020 ~$          $
. TJ                                    .                          _
_gese
[U                                  -
c          W j3                                  ,-
                                                                          -00S0 y          $
x 1
                                                                          -00kB -
m    W    w        I
                                                                          -00E0        E    O        ;
m    e La. F    x
                                                                          -0020    m        e
                                      .                                            ..w
                                                                          -0010    m tn      J I                                -
                                                                          -00v2    $;      @
wurF
                                                                          -00E2    Iaec 1    1x
                                                                          -8022    oawe c mw Fron l                                      -
                                                                          -0012    FeIz
!                            -                                                    E _J tn s
                                                                          -0002 I                          l
                                                                          -0061 i
l                                            -
                                                                          -0081
                                                                          -8041 9
                                                                          -0091-1              -
U) l                                                        -
                                                                          -00S1    E i          .
3
                                                                          -0061 co N  O l                                                                                  I l
y
                                                                          -00EI ?  ,
                                                                          -0021 ca  LJ              ,
                                                                          -0011 5  %            ,
l
                                                                          -0001 $  h
                                                                          -0060              .
                                                                          -0080
;  i                                            .              .                        .
                                                                      ?  -
N              m
;                                                  AWQ/% - 73n        _ _
:                                                    3WIl 78101        _  _
l AWQ/% - 3188 3DUMW37                    --
l i
 
O                                                                                          O ATTACHMENT 3.3G O      .
SUPERIMPOSED LEAKAGE VERIFICATION TEST l                                                                      FROM 0925 HOURS TO 1325 HOURS ON 01/21/87                                                    .
REDUCED INPUT VARIABLES DRYWELL                                                                    SUPPRESSION CHAMBER ABS.                VAP.              ABS.                                              ABS. VAP.        ABS.      ~
1  TIME                PRESS.                    PRESS.              TEMP.                DEWPOINT                  PRESS. PRESS.      TEMP.        DEWPOINT      b
{  (HRS)                (PSIA)                  (PSIA)                ( R)                      ( F)                (PSIA) (PSIA)      ( R)              ( F)      H 0925                61.684                    0.4014              558.707              72.970                    61.682 0.4606      537.952      77.090 i  0945                61.679                    0.4006              558.699                72.910                  61.678 0.4606      537.952      77.090 1005                61.673                    0.4013              558.702              72.965                    61.672 0.4619      537.964      77.180 1025                61.666                    0.4009              558.708                72.935                  61.665 0.4633      537.952      77.270 1045                61.660                    0.4004              558.693                72.895                    61.659 0.4592      -537.951      77.000 1105                61.656                    0.4004              558.702                72.895                  61.654 0.4619      537.962'      77.180 1125                61.649                    0.4018              558.703                73.005                    61.648 0.4619      537.954      77.180 4  1145                61.642                    0.4035              558.700                73.130                    61.641 0.4619      537.956      77.180
]  1205                61.636                    0.3996              558.687                72.840                  61.635 0.4619      537.954      77.180 1  1225                61.632                    0.4006              558.692              72.915                    61.630 0.4619      537.951      77.180 j 1245                61.626                    0.4004              558.699                72.895                    61.624 0.4619      537.949'      77.180 l' 1305                61.618                    0.4014              558.691                72.970                    61.616 0.4606      537.939      77.090 1325                61.613                    0.4008              558.683                72.930                    61.611 0.4619      537.954'      77.180 1
1 i
i I
1                                                                                                  Page 1 of 1
 
e ATTACHMENT 3.3H SUPERIMPOSED LEAKAGE VERIFICATION TEST Og                                                                        FROM 0925 HOURS TO 1325 HOURS ON 01/21/87
. V                                                                                                                                                                                                            !
l l
ABSOLUTE TEST METHOD, MASS POINT ANALYSIS TEST RESULTS TIME        MASS          LEAKAGE                                        CONF.                UCL                                              ;
(HRS)      (LBM)          (PCT / DAY)                                (PCT / DAY)    PCT / DAY) 4 0925      98844.59      0.000000                                    0.000000        0.000000 0945      98838.73      0.000000                                    0.000000        0.000000 1005      98826.23      0.668639                                    1.196898        1.865537 1025      98814.67      0.744750                                    0.224945        0.969695 1045      98809.90      0.680559                                    0.135714        0.816273 1105      98799.06      0.677849                                    0.080510        0.758359 1125      98787.63      0.693454                                    0.056790        0.750244 1145      98774.91      0.719373                                    0.050121        0.769494 1205      98770.36      0.705595                                    0.040745      0.746339 1225      98762.03      0.693177                                    0.034577      0.727755 1245      98752.03      0.688033                                    0.028359      0.716392 1305      98740.69      0.690350                                    0.023456      0.713806 i                                                                1325      98731.88      0.690155                                    0.019643      0.709799 i
l t
i t
N 4
iO                                                                                                                                                                                            .
Page 1 of 1 i
i
                                                                                              . _ . ~ _ . , . _ . _ _ . _ - , . , . . .            _ . _ _ . . . . _ . _ . _ , - - - _ . - - _ . , - - _ , -
 
TTACHMENT 3.3I                                                                              ;
SUPERIMPOSED LEAKAGE VERIFICATION TEST
  -(                                                              FROM 0925 HOURS TO 1325 HOURS ON 01/21/87
                                                            -ABSOLUTE TEST METHOD, TOTAL TIME ANALYSIS TEST RESULTS j                                                                        MEAS.                            MEAN OF      CALC.
4
                        . TIME                          - MASS        LEAKAGE                              MEAS. LEAKAGE                        CONF.        UCL (HRS)                          (LBM)      (PCT / DAY)                        (PCT / DAY)  (PCT / DAY)                (PCT / DAY)  '(PCT / DAY) 0925                          98844.59    0.000000                          0.000000      0.000000                  0.000000        0.00000 0945                          98838.73    0.426340                          0.000000      0.000000                  0.000000      0.00000 1005                          98826.23    0.668647                          0.000000      0.000000                  0.000000        0.00000 1025                          98814.67    0.726298                          0.000000      0.757074                  0.730297        1.48737 1045                          98809.90    0.631638                          0.000000      0.714262                  0.598855        1.31311 1105                          98799.06    0.663308                          0.000000      0.710631                  0.412872        1.12350 112S                          98787.63    0.691517                          0.000000      0.721425                  0.319267        1.04069 1145                          98774.91    0.725088                          0.000000      0.741726                  0.263122        1.00484
:                        1205                          98770.36    0.675851                          0.000000      0.732590                  0.242219      0.97481 i                        1225                          98762.03    0.668148                          0.000000      0.722735                  0.226021      0.94875 1245                          98752.03    0.674235                          0.000000      0.717395                  0.210094      0.92748 1305                          98740.69    0.687986                          0.000000      0.717475                  0.194923      0.91239 1325                          98731.88    0.684150                          0.000000      0.716022                  0.183141      0.89916
;O b
4 1
i i
y 4
a 1
h r
l
,                                                                                                                                                                                                      l l
l
;O                                                                                                                                                                                                      l i                                                                                                            Page 1 of 1                                                                                '
1 i
  -c-- ---,-,,.--.y.-.    ---,-_,.----.,-_,,.,,y...,                    ,.,,.-,_m.,_,_._,..,_....,.,....y              -.y v._.- _ , ,,, - ,,, , , - - , _        .___,,.-__,,--_y,.---.--
 
~-          -                .                              .      --              -    -
SECTION 4 LOCAL LEAKAGE RATE TESTS (TYPES B AND C)
Attachments 4A and 4B, which follow, summarize the LLRT data which has been obtained from periodic testing performed since the December 1982 Preoperational-Type A Test. Pre-repaired data is provided for surveillance testing performed '
      'in 1984 and 1986.        Valves listed in both summaries are individual valve measurements, unless otherwise noted.      Each penetrations leakage rate can be obtained from site reference material. These LLRT's were performed using the makeup _ air test method by _ pressurizing the listed penetrations with air or nitrogen and either measuring leakage across ' the containment isolation valves boundary (Type C) or across the resilient seals (Type B) utilizing rotometers with a maximum range of 72 scfh.      No attempt to establish the actual' leakage rate was made when the calibrated range of the test instrumentation . was exceeded.
Attachment 4C summarizes the leakage penalties added to the Type A ' overall leakage for systems that were either isolated or not vented and drained during the Type A Test. A correction factor of 5 percent was also applied to these leakage rates for flowmeter inaccuracies.
Also included are the results of local leakage rate testing performed on the Hydrogen Recombiners. This leakage, not identified as Type B or C, was added_to the overall leakage to support Shoreham's Leakage Reduction Program.
The results of local leakage rate testing performed on those instrument lines which are an extension of the primary containment boundary, but which were isolated or not vented and drained during the Type A Test, are also included.
This leakage, not identified as Type B or C, was added to the .overall leakage for verification of the instrument lines containment capabilities.
The acceptance criteria for Types B and C testing are in accordance with 10CFR50, Appendix J. The combined "as-lef t" leakage rate for all penetrations and valves subject to Types B and C tests in 1984 and 1986 were well below the acceptance criteria of less than 0.60 La.
t The data contained in this section are summarized below:
Attachment No.                        ,
Title 4A                            1986 Local Leakage Rate Test Data 4B                            1984 Local Leakage Rate Test Data 4C                            Leakage Penalties Added to Type A Leakage O
4-1
 
O                                                                    O                                              O ATTACHMENT 4A 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR      POST-REPAIR TYPE                        EQUIPMENT / VALVES                LEAKAGE /DATE    LEAKAGE /DATE PENETRATION NO.            TEST                            TESTED                          (SCF/ hour)        (SCF/ hour)  REPAIR / NOTES X-IA Main Steam            C                          IB21*A0V081A (IPC)                > 72/10-10-85                      MWR85-6307', A0V081A -
IB21*A0V082A (OPC)              16.77/10-10-85                      Machined seat.
IB21*A0V061 (OPC)                  0.0/10-10-85 IE32*MOV021A (OPC)                  0.0/10-10-85
                                                                                                  > 72/10-25-85        3.81/12-6-85  MWR85-6308, A0V082A -
                                                                                                  > 72/10-25-85        (Combined)    Machined seat.
0.0/10-25-85 0.0/10-25-85 1.88/11-10-86    1.88/11-10-86 (Combined)        (Combined) iI X-1B Main Steam            C                          IB21*A0V081B (IPC)                > 72/10-11-85                      MWR85-6348, A0V081B.-  ,
IB21*A0V0828 (OPC)              21.70/10-11-85                        Lapped seat & disc and IB21*MOV062 (OPC)                  0.0/10-11-85                      replaced gasket.
IE32*MOV021B (OPC)                  0.0.10-11-85 8
                                                                                                  > 72/10-28-85    0.78/l1-26-85    MWR85-6348, A0V081B -
l                                                                                              35.06/10-28-85      (Combined)      Lapped seat & disc and j                                                                                                  0.0/10-28-85                      replaced gasket.
l 1
0/0/10-28-85 1.17/11-11-86    1.17/11-11-86 r                                                                                                (Combined)        (Combined) l X-IC Main Steam            C                          IB21*A0V081C (IPC)                > 72/10-12-85                      MWR85-6393, A0V082C -
IB21*AOV082C (OPC)              20.91/10-12-85                        Machined seat.
IB21*MOV063 (OPC)                  0.0/10-12-85 1E32*MOV021C (OPC)                  0.0/10-12-85                      MWR85-6394, A0V081C -
Machined seat.
a Page 1 of 31
 
    .      - - -        - = _ _ _ . _ _ _ -        _ _ - _ _ . .    - .      . .            .      - _ - _ -      ._    . - - .
O                                                                  O                                                            O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR            POST-REPAIR TYPE EQUIPMENT / VALVES                ' LEAKAGE /DATE          LEAKAGE /DATE PENETRATION NO.                    TEST        TESTED                        (SCF/ hour)            (SCF/ hour)            REPAIR / NOTES
                                                                                      >72/11-6-85            0.50/11-27-85            MWR85-6393, A0V082C - ..
(Combined)          (Combined)              Machined seat.
3                                                                                                                                      ML'R85-6394, AOV081C Machined seat.
9.82/11-12-86            9.82/11-12-86 j                                                                                  (Combined)                (Combined)                                        ,
I-ID Main Steam                      C  IB21*A0V081D (IPC)                    5.13/1-8-85              5.13/1-8-85 IB21*A0V082D (OPC)                    (Combined)              (Combined) j                                                IB21*MOV064 (OPC)
{                                                IE32*MOV021D (OPC) j                                                                                    >72/10-14-85            10.26/11-7-85            Stroked valves,
;                                                                                    > 72/10-14-85            6.33/11-7-85            LLRT acceptable.
0.01/10-14-85              0.0/11-7-85
;                                                                                  0.01/10-14-85              0.0/11-7-85
!                                                                                34.64/11-14-86            8.33/11-19-86            Stroked valves, 13.3/11-14-86              5.0/11-19-86            LLRT acceptable.
,                                                                                    0.0/11-14-86            0.0/11-19-86 l
0.0/11-14-86            0.0/11-19-86 10.06/12-1-86            10.06/12-1-86 (Combined)                (Combined)
I-2A Feedvater                      C  IB21*18V-1103A(IPC)                  1.03/1-11-86            1.03/1-11-86            Valves opened IB21*AOV036A (OPC)                  0.62/1-11-86            0.62/1-11-86            for inspection.
2.05/1-22-86            2.05/1-22-86 0.036/1-22-86            0.036/1-22-86 Page 2 of 31
 
O                                                          O                                                                                    O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR                                        POST-REPAIR                                '
TYPE      EQUIPMENT / VALVES                      LEAKAGE /DATE                                        LEAKAGE /DATE                            '
PENETRATION NO.          TEST            TESTED                            (SCF/ hour)                                        (SCF/ hour)      REPAIR / NOTES        ,
I-2B Feedwater            C        IB21*18V-1103B (IPC)                  0.62/10-17-85                                        0.62/10-17-85 1B21*AOVO36B (OPC)                      1.55/10-17-85                                      1.55/10-17-85                          -
0.31/1-13-86                                        0.31/1-13-86      Valves opened 3.49/1-13-86                                        3.49/1-13-86      for inspection.
2.57/1-16-86                                        2.57/1-16-86                            '
3.49/1-16-86                                        3.49/1-16-86 I-3      Main Steam      C        IB21*MOV031 (IPC)                          0.0/12-7-85                                        0.0/12-7-85
;                          Drains                    IB21*MOV032 (OPC)                        0.33/12-7-85                                        0.33/12-7-85 0.42/1-13-86                                        0.42/1-13-86 0.52/1-13-86                                        0.52/1-13-86 I-4 Reactor Water        C        IG33*MOV033 (IPC)                        0.14/3-11-86                                        0.14/3-11-86 Cleanup                    IG33*MOV034 (OPC)                        0.10/3-11-86                                        0.10/3-11-86 I-5 RHR from RPV          C        IEll*M3V047 (IPC)                        3.50/2-28-85                                        3.50/2-28-85 1El1*MOV048 (OPC)                      21.30/2-28-85                                        21.30/2-28-85 IEll*RV163 (OPC)                        (Combined)                                            (Combined) 7.41/12-11-86
                                                                                            >72/12-11-86                                                            MWR86-5945, MOV048 -
(Combined)                                                          Replaced disc and machined seat.
                                                                                            > 72/12-30-86                                        2.25/3-28-87 (Combined)                                      (Combined) l                                                                                        Page 3 of 31 l
l                                                -
r
 
                                                                                                                                                                        - _ ~          _
O                                    .
O                                                          O              .
ATTAGMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR      POST-REPAIR TYPE      EQUIPMENT / VALVES                              LEAKAGE /DATE    LEAKAGE /DATE PENETRATION NO.                                    TEST                  TESTED                              (SCF/ hour)        (SCF/ hour)              REPAIR / NOTES X-6A RHR Recire.                                      C      IEll*AOV081A (IPC)
Return                                          IEll*MOV081A (IPC)
IEll*MOVO37A (OPC)                                  -
1.64/5-30-85              MWR85-3077, MOV037A -
Replaced packing and extrusion rings.
2.35/5-17-86      2.35/5-17-86 (Combined)        (Combined) 2.35/5-17-86      2.35/5-17-86
  ~
1.13/12-9-86      1.13/12-9-86 X 'B
      .          RHR Recir.                              C      IEll*A0V081B (IPC)                                > 72/1-8-86                                MWR86-0232,A0V081B -
Return                                          IEll*MOV081B (IPC)                                (Combined)                              -Tightened packing.
IEll*MOV037B (OPC)                                8.39/1-8-86 9.94/2-24-86      9.94/2-24-86 (Combined)        (Combined) 0.51/2-24-86      0.51/2-24-86 I-7A RHR Drywell                                      C      IEll*MOV038A (OPC)                              0.163/4-8-85      0.163/4-8-85 Spray                                          1E11*MOV039A (OPC)                                0.0/4-8-85            0.0/4-8-85 0.0/11-16-85              MWR85-6399, MOV038A -
0.0/11-16-85              Replaced motor operator.
l l  I-7B RHR Drywell                                      C      IEll*MOV038B (OPC)                              0.0/10-30-85      0.0/10-30-85 Spray                                          IEll*MOV039B (OPC)                              0.0/10-30-85      0.0/10-30-85
                                                                                                              .Page 4 of 31 f                                                                                          - _ _ _ _  ._
 
O                                                                                  O                                                    O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR        POST-REPAIR TYPE                  EQUIPMENT / VALVES                              LEAKAGE /DATE      LEAKAGE /DATE PENETRATION NO.          TEST                              TESTED                                (SCF/ hour)        (SCF/ hour)        REPAIR / NOTES X-8A RHR Pool Spray        C                    IEll*MOV040A (OPC)                                0.0/5-18-86        0.0/5-18-86 IEll*MOV041A (OPC)                              0.93/5-18-86        0.93/5-18-86                                  '
IEll*MOV042A (OPC)                                (Combined)          (Combined)
X-8B RHR Pool Spray        C                  IEll*MOV0408 (OPC)                                  > 72/1-7-86        0.52/2-4-86      MWR86-0186, MOV040B -
IEll*MOV041B (OPC)                                  (Combined)          (Combined)      Cleaned and lapped disc IEll*MOV0428 (OPC)                                                                      & seat. Added packing, b
X-9A RHR Suction            C                    IEll*MOV031A (OPC)                              > 72/11-21-85      0.26/12-17-85        MWR85-6936, MOV031A -
Lapped seat.
X-98 RHR Suction          C                    IFil*MOV031B (OPC)                            71.58/10-31-85                            MWR85-4711, MOV031B -
Disassembled, cleaned 29.65/11-4-85                            disc & seat.
Adjusted torque switch-
                                                                                                      > 72/11-14-85        0.41/1-31-86        setting.
X-9C RHR Suction          C                    IEll*MOV031C (OPC)                              9.80/2-20-85                            MWR85-0540, MOV031C -
Adjusted torque switch setting.
                                                                                                        > 72/6-8-85          2.89/6-9-85      MWR85-3406, MOV031C -
Adjusted torque switch setting.
43.06/1-4-86        3.30/1-10-86        MWR85-6946, MOV031C -
Stroked valve.
X-9D RHR Suction          C                    IEll*MOV031D (OPC)                              0.35/10-23-85        0.35/10-23-85 Page 5 of 31 p.
 
O                                                                    O                                                                    O                            .
s ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR                      POST-REPAIR TYPE EQUIPMENT / VALVES          LEAKACE/DATE                      LEAKAGE /DATE PENETRATION NO.                                            TEST      TESTED                  (SCF/ hour)                        (SCF/ hour)    REPAIR / NOTES I-10A RHR Test Line                                        C  IC41*MOV033A (OPC)        0.031/12-23-85                    0.031/12-23-85 Return, RHR                                    IG41*MOV033B (OPC)          0.0/12-23-85                        0.0/12-23-85 Test, Pass, Radwaste, Fuel                                IEll*MOV044A (OPC)            0.0/4-11-85                          0.0/4-11-85 Pool Cooling                                  IE11*MOV045A (OPC)            0.0/4-11-85                          0.0/4-11-85 and Cleanup, Core Spray                                                                  0.0/7-19-86                          0.0/7-19-86  MWR86-3260, MOV045A -
0.062/7-19-86                      0.062/7-19-86      Adjusted torque switch.
IEll*0lV-0047 (OPC)        0.031/1-14-86                      0.031/1-14-86 IEll*SOV168 (OPC)            0.0/1-14-86                          0.0/1-14-86 IG11*MOV639C (OPC)                                                                                                            .3 IG11*03V-2110C (OPC)
IE21*MOV035A (OPC)
IE21*MOV034A (OPC)            0.37/6-7-85                          0.37/6-7-85 0.24/3-4-86                          0.24/3-4-86 0.176/3-4-86                        0.176/3-4-86 0.41/3-4-86                          0.41/3-4-86 0.0/3-4-86                          -0.0/3-4-86 I-108 RRR Test                                              C  IEll*MOV0445 (OPC)
Line Return,                                              lEl1*MOV0458-(OPC)          > 72/9-25-85                        1.95/9-25-85    MWR85-5955 MOV04$B -
HPCI, RCIC, Core                                                                                                                            Replaced motor                            ,,
Spray, Pass,                                                                                                                              ,
operator.
Relief to RCIC Pump Suction.                                                                            0.0/1-10-86                          0.0/1-10-86 2.89/1-10-86                        2.89/1-10-86 Page 6 of 31                                                                                          a f
 
O                                                                    O                .
O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA F
i PRE-REPAIR          POST-REPAIR TYPE    EQUIPMENT / VALVES            LEAKAGE /DATE          LEAKAGE /DATE                              ,
PENETRATION NO.                                          TEST        TESTED                      (SCF/ hour)            (SCF/ hour)                      REPAIR / NOTES 0.0/1-23-86            0.0/1-23-86                      MWR86-0266, MOV044B -
2.58/1-23-86            2.58/1-23-86                      Adjusted torque switch.-
IE41*MOV036 (OPC)            2.79/11-11-85            0.17/12-11-85                      MWR85-6830, MOV036 -
0.0/1-8-87              0.0/1-8-87                      Cleaned and lapped        '
seat.
IE51*MOV036 (OPC)            0.0/10-21-85            0.0/10-21-85 IE11*SOV169 (OPC)          0.103/10-18-85          0.103/10-18-85 IEll*01V-0048 (OPC)          16.48/10-18-85                                                WR85-6437, 7186,        't 01V-0048 - Replaced valve twice.
12.27/1-18-86            0.041/2-6-86 IEll*RV155 (OPC)              0.052/8-24-86            0.052/8-24-86                                      .
IE21*MOV0345 (OPC)              8.07/2-8-86            1.79/2-14-86                      MWR86-0755, MOV034B -
IE21*MOV035B (OPC)              0.42/2-8-86              0.42/2-8-86                      Adjusted torque switch I-11 RHR Head                                              C      IEll*MOV054 (IPC)              0.15/3-7-86              0.15/3-7-86 Spray                                            IEll*MOV053 (OPC)                (Combined)              (Combined)
                                                                          -IEll**.V164 (OPC)
Page 7 of 31 l'
 
    -. - _ . . - - _ -      _ .        . . _ _ . . . .                - - _ - _ - - . _ - - . _ . - _ - - - -.. . - .- -. _ _ _.- - .- _ ~. .
t 1
O                                                                          O                                                            -
O              :
i j                                                                      ATTACI9 TENT 4A (Continued)                                                                                                  '
i l                                                                  1986 LOCAL LEAKAGE RATE TEST DATA l                                                                                                                                                                                                  u a
PRE-REPAIR                                POST-REPAIR a                                    TTPE            EQUIPMENT / VALVES                                LEAKAGE /DATE                                LEAKAGE /DATE                                  ,,
j              PENETRATION MO.      TEST                                                                                                                                                          ''
TESTED                                          (SCF/ hour)                                (SCF/ hour)      REPAIR / NOTES k                                                                                                                                                                                                    1
!            I-12 HPCI Turbine      C              IE41*MOV041 (IPC)                                    0.0/4-17-85                                  0.0/4-17-85 l                      Steam                                                                                      -
0.0/7-20-85      MWR85-4160, MOV041:-        t j
IE41*MOV042 (OPC)                                0.04/4-17-85                                  0.04/4-17-85      Adjusted torque switch IE41*MOV047 (IPC)                                  (Combined)                                  (Combined)          setting.                      i i
IE41*MOV048 (OPC)
'I                                                                                                                  -
1.64/7-10    MWR85-3949, MOV048      -    i
!                                                                                                                                                    -(Combined)        Added packing.                "
)
i X-13 HPCI Turbine      C              IE41*MOV044 (OPC)                                              -
0.031/1-2-86      IGiR85-5140, MOV044 -
l                      Exhaust                      IE41*18V-0021 (OPC)                                            -
1.032/1-2-86      Repaired disc and seat.
j                                                  IE41*18V-0022 (OPC)                                            -
1.032/1-2-86 ,                          .
}                                                                                                                                                                      - MWR85-6671, 18V-0021~-.
!                                                                                                                                                                        Repaired disc and seat.L 1
)                                                                                                                                                                        MWR85-6649,'18V-0022 -
1                                                                                                                                                                        Repaired disc and' seat.
{                                                                                                      1.67/9-23-86                                  1.14/12-20-86
!                                                                                                      > 72/9-23-86                                  0.42/12-20-86      MWR86-4566, 18V-0021, I                                                                                                      > 72/9-23-86                                  0.25/12-20-86      0022 - Replaced valves.
* I j            I-14 Spare              C                                                                  0.0/11-5-85                                  0.0/11-5-85                                    '
3 I-15 HPCI Pump          C            IE41*MOV032 (OPC)                                    0.0/4-23-85                                  0.0/4-23-85
.;                      Section I
f                                                                                            Page 8 of 31 1_              __            __            _          _ l' _ _-
 
a O                                          O                                              O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR      POST-REPAIR TYPE EQUIPMENT / VALVES            LEAKAGE /DATE    LEAKAGE /DATE PENETRATION NO. TEST    TESTED                    (SCF/ hour)      (SCF/ hour)    REPAIR / NOTES I-16 RCIC Turbine  C  1E51*MOV041 (IPC)              0.0/8-30-85        0.0/8-30-85 Steam            1E51*MOV042 (OPC)                  -
0.031/8-30-85    MWR85-5300, MOV047-IE51*MOV047 (IPC)                              (Combined)      Adjusted torque switch.
IE51*MOV048 (OPC)
I-17 RCIC Turbine  C  IE51*MOV045 (OPC)            1.96/12-10-85    0.062/12-20-85    MWR85-6248, MOV045 -
Exhaust          IE51*08V-0020 (OPC)        0.052/12-20-85    0.052/12-20-85    Cleaned valve IE51*08V-0021 (OPC)        0.052/12-20-85    0.052/12-20-85    internals.
0.0/8-1-86        0.0/8-1-86    MWR85-6456, 08V-0020-Replaced valve.
MWR85-6457, 08V-0021 -
Replaced valve.
0.41/9-24-86      0.41/9-24-86    MWR86-3437, 3522,      ,
0.0/9-24-86      0.0/9-24-86    MOV045 - Replaced 0.074/9-24-86    0.074/9-24-86    motor and internals.
' X-18 RCIC Vacuum    C  IE51*MOV046 (OPC)              0.0/1-15-86      0.0/1-15-86 Pump            IE51*02V-0025 (OPC)            (Combined)        (Combined)
I-19 RCIC Pump    C  IE51*MOV032 (OPC)            1.87/10-15-85      0.0/11-12-85    MWR85-6400, MOV032 -
Suction                                                                          Cleaned valve internals.
I-20A Core Spray  C  IE21*A0V081A (IPC)          0.32/12-11-85    0.32/12-11-85 1E21*MOV081A (IPC)          (Combined)        (Combined)      '
1E21*MOV033A (OPC)          0.11/12-11-85    0.11/12-11-85 Page 9 of 31 l'
 
    . - _ .          - .. ..- - - - ..                    . - _ _      . - - - . -                . - - -          . . - _ . - . - . - . - ~ - - . - . _ . . -                  .-. .
l                              O                                                                              O                                                                          O                          '
o l                                                                                            ATTACHNENT 4A (Continued)                                                                                            't i
!                                                                                      1986 LOCAL LEAKAGE RATE TEST DATA i
3 PRE-REPAIR                  POST-REPAIR l                                                    TYPE            EQUIPMENT / VALVES                      LEAKAGE /DATE                LEAKAGE /DATE PENETRATION NO.                        TEST                      TESTED                          (SCF/ hour)                    (SCF/ hour)              REPAIR / NOTES l              I-205 Core Spray                            C          IE21*AOV081B (IPC)                    0.061/5-20-86              .0.061/5-20-86                                    -
l                                                                      1E21*MOV0815 (IPC)                    (Combined)                    (Combined) i lE21*MOV033B (OPC)                    0.082/5-21-86                0.082/5-21-86
* I-21A Core Spray                          C            IE21*MOV031A (OPC)                      12.33/6-7-85                  12.33/6-7-85                                                    ~
i                      Suction 1                                                                                                                                                                                                                  ..!
0.166/12-23-85                0.166/12-23-85 I-21B Core Spray                          C            IE21*MOV031B (OPC)
,i                    Suction                                                                                                                                                                                        .,
!              I-22A RBCLCW                              C            IP42*MOV035 (OPC)                      0.0/10-29-85                  0.0/10-29-85 s
X-22B RBCLCW                              C            IP42*MOV047 (OPC)                      18.15/3-4-85                  18.                  8 j                                                                                                                                                                        Cleaned.and lapped j                                                                                                                                                                        wedge & seat.
I-23A RBCLCW                              C          .IP42*MOV036 (OPC)                        0.0/10-30-85                  0.0/10-30-85                                                              ,
1                                                                                                                                                                                                                    t I-235 RBCLCW                              C            IP42*MOV048 (OPC)                      0.102/3-4-85                  0.102/3-4-85                                                          3
,                                                                                                                0.0/8-1-86                      0.0/8-1-86                                                          i 1-24A RBCLCW to                            C            IP42*03V-0037AA (IPC)                  0.081/3-4-85                  0.081/3-4-85 l                      Drywell Coolers                                IP42*MOV232 (OPC)                      0.184/3-4-85                  0.184/3-4-85 l.54/10-14-86                1.54/10-14-86
]
0.41/10-14-86                0.41/10-14-86.
            .I-245 RBCLCW to                            C            IP42*03V-0037AB (IPC)-            0.145/10-19-85                0.145/10.-19-85 Dryvell Coolers                                IP42*MOV233 (OPC)                0.083/10-19-85                0.083/10-19-85
]~                                                                                                                                                                                                                    .
Page 10 of 31 i
}                            . . _ .    . . . - ._-.- - __ _ - - - -
f _. - .                                        .        -                ,  , .                              . . . -
 
      .~ - -._ -- - - - _ __ _ - _ . - - - - - .              _
                                                                                  - - . - - - . . - - . - - . - _ - - -                -        .~ .    - - - .
O                                                        O                                                                O          1 ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR                      POST-REPAIR TYPE  EQUIPMENT / VALVES            LEAKAGE /DATE                    LEAKAGE /DATE PENETRATION NO.                          TEST      TESTED                      (SCF/ hour)                      (SCF/ hour)  REPAIR / NOTES 0.42/10-15-86                  0.42/10-15-86                                ;-
0.24/10-15-86                  0.24/10-15-86 I-24C RBCLCW to                          C    IP42*03V-0037AC (IPC)          0.092/3-4-85                    0.092/3-4-85 Drywell Coolers                  IP42*MOV234 (OPC)              0.102/3-4-85                    0.102/3-4-85 0.41/10-16-86                  0.41/10-16-86 0.0/10-16-86                    0.0/10-16-86 et i      X-24D RBCLCW to                          C    IP42*03V-0037AD (IPC)        2.36/12-13-85                0.062/12-17-85      MWR85-7406, 03V-0038AD--
'                    Drywell Coolers                  IP42*MOV235 (OPC)            2.66/12-13-85                  0.18/12-17-85    Lapped seat and disc, (boundary valve).
l                                                                                    0.41/10-17-86                  0.41/10-17-86 0.12/10-17-86                  0.12/10-17-86  -
I-24E RBCLCW to                            C  IP42*03V-0037BA (IPC)          0.36/11-25-85                  0.36/11-25-85 Dryvell Coolers                IP42*MOV237 (OPC)              0.41/11-25-85                  0.41/11-25-85 0.82/10-20-86                  0.82/10-20-86 1.84/10-20-86                  1.84/10-20-86 I-24F RBCLCW to                            C  IP42*03V-0037BB (IPC)          > 72/11-25-85                  0.092/1-24-86    W R85-7074, 03V-0038BB-
                                                                                    > 72/11-25-85                  0.082/1-24-86 Drywell Coolers                  IP42*MOV238 (OPC)                                                                Lapped disc, (boundary valve).
0.401/10-24-86                  0.401/10-24-86 0.105/10-24-86                  0.105/10-24-86 I-24G RBCLCW to                            C  IP42*03V-0037BC (IPC)        0.031/11-1-85                    0.031/11-1-85 Dryvell Coolers                  IP42*MOV239 (OPC)            0.041/11-1-85                  ^0.041/11-1-85 O.51/10-27-86                    0.51/10-27-86 0.104/10-28-86                  0.104/10-27-86 Page 11 of.31
 
. _ _ _ _ . . _ . _ . _ _ -- _ _ _ _ _ _ _ . . _ _ _ _ _ _ - . . _ _ . _ . _ _ . _                      . _  _ . . . _ . _ . . . . _ . _ . . - _    - . _ . _ _ . . _ . _ . _ _ . ~ . - ~ . _ _ _ _ _ , . _
O                                                          -
O                                                                          O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA                                                                              .
PRE-REPAIR                POST-REPAIR TYPE          EQUIPMENT / VALVES                LEAKAGE /DATE                LEAKAGE /DATE PENETRATION NO.                                          TEST              TESTED                          (SCF/ hour)                (SCF/ hour)                  REPAIR / NOTES I-24R RBCLCW to                                              C            IP42*03V-0037BD (IPC)            0.22/11-21-85                0.22/11-21-85 Drywell Coolers                                            IP42*MOV240 (OPC)              0.051/11-21-85                0.051/11-21-85 0.62/10-29-86                0.62/10-29-86                                                      '
1.44/10-29-86              1.44/10-29-86 I-25A RBCLCW from                                            C          IP42*MOV147 (IPC)                        0.0/3-2-85              0.0/3-2-85 Drywell Coolers                                          IP42*MOV231 (OPC)                      4.28/3-2-85              4.28/3-2-85 IP42*RV291A (OPC)                      (Combined)              (Combined)                                                    .;
0.0/12-14-85                0.0/12-14-85                  MWR85-5132, MOV231 --
2.05/12-14-85                2.05/12-14-85                  Retest LLRT only.
(Combined)                  (Combined)                    No work performed.
O.0/10-9-86              0.0/10-9-86 16.4/10-9-86                1.45/1-5-87                  IGlR86-4936, MOV231 -            <.
                                          ,                                                                            (Combined)                  (Combined)                    Adjusted torque switch.
I-25B RBCLCW from                                            C          IP42*MDV148 (IPC)              0.164/10-31-85                0.164/10-31-85 Drywell Coolers                                            IP42*MDV236 (OPC)              0.411/10-31-85                0.411/10-31-85 IP42*Rv2915 (OPC)              (Combined)                      (Combined)
I-26 Purge Air                                              C            IT46*A0V038A (IPC)                0.092/1-26-85                0.092/1-26-85 IT46*A0V038B (OPC)                    (Combined)              (Combined)
                                                                                                                                                                                                                -}
0.0/5-24-85              0.0/5-24-85 (Combined)                (Combined)                                                      ,
Page 12 of 31
 
O                                                      O                                              O          I ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA
^
PRE-REPAIR        POST-REPAIR TYPE  EQUIPMENT / VALVES                    LEAKAGE /DATE      LEAKAGE /DATE PENETRATION NO. TEST      TESTED                              (SCF/ hour)        (SCF/ hour)  REPAIR / NOTES 0.092/7-12-85    0.092/7-12-85 (Combined)        (Combined) 0.103/1-25-86    0.103/1-25-86 (Combined)        (Combined) 0.62/9-25-86      0.62/9-25-86 (Combined)        (Combined) 0.124/11-25-86    0.124/11-25-86 (Combined)        (Combined)
  ~
I-27 Purge Air      C    IT46*A0V039A (IPC)                      5.20/1-27-85      0.0/5-24-85    MWR85-0478, A0V039B -
IT46*A0V039B (OPC)                      (Combined)        (Combined)    Tightened packing gland.
0.26/9-5-85      0.26/9-5-85 (Combined)    ,    (Combined) 4.12/1-27-86      2.88/1-27-86    MWR86-0541, A0V039B -
(Combined)        (Combined)      Tightened packing gland.
3.3/9-25-86      3.3/9-25-86 (Combined)      (Combined)
I-28 Purge Ai ,    C  IT46*A0V038C (OPC)                      0.81/1-22-85      0.81/1-22-85 SC Inerting        IT46*ADV038D (OPC)                      0.51/1-22-85      0.51/1-22-85 IT24*A0V004A (OPC)                        0.0/1-22-85      0.0/1-22-85 IT24*A0V004B (OPC)                        0.0/1-22-85      0.0/1-22-85 Page 13 of 31
 
___.m-    _ _ . . . _ _ . . _ . . _ _ . _ -            _  _        ___._.___ _      _m._.  ..__._m . __ _ . _ _ . . _ _      _ - _ . . _ . . _ _
O                                                                                  O                                                                  O j
1 ATTACHMENT 4A (Continued)
)                                                                                                                  1986 LOCAL LEAKAGE RATE TEST DATA i
i PRE-REPAIR                POST-REPAIR TYPE              EQUIPMENT / VALVES                    LEAKAGE /DATE                LEAKAGE /DATE PENETRATION NO.                                TEST                  TESTED                              (SCF/ hour)                (SCF/ hour)              REPAIR / NOTES, I
l                                                                                                                                          1.14/3-14-85                  1.14/3-14-85 t
1 (Combined)                  (Combined)
I 0.66/5-28-85                  0.66/5-28-85                                  '
O.29/5-28-85                  0.29/5-28-85 j
4 0.06/5-28-85                  0.06/5-28-85
                                                                                                          .                                0.06/5-28-85                  0.06/5-28-85
]
,                                                                                                                                          1.44/11-14-85                1.44/11-14-85 (Combined)                  (Combined) 1.46/1-28-86                  1.46/1-28-86 (Combined)                    (Combined) j                                                                                                                                          0.72/7-21-86                  0.72/7-21-86 (Combined)                    (Combined) 4 t
)                        X-29 Purge Air                                          C                IT46*AOV039C (OPC)                          > 72/1-3-85 0.11/1-25-85          MWR85-0039, AOV039C -
j IT46*AOVO39D (OPC)                        0.14/1-2-85                1.50/1-25-85          Cleaned seat and disc.
IT46*ADVO79A (OPC)                          >72/1-3-85                2.50/1-25-85 j                                                                                                  IT46*A0V079B (OPC)                        5.76/1-2-85                0.92/1-25-85 i
1 i                                                                                                                                    Page 14 of 31 y                            ,.
:                                                                                                                                                      :g.
ATTACHMENT 4A (Continued)                    .
1986 LOCAL LEAKAGE RATE TEST DATA                                                      ,
PRE-REPAIR                      POST-REPAIR TYPE    EQUIPMENT / VALVES                        LEAKAGE /DATE                    LEAKAGE /DATE PENETRATION NO.                TEST          TESTED                              (SCF/ hour)                        (SCF/ hour)                REPAIR / NOTES                L
  ~
3.43/5-29-85                        2.11/6-4-85                W R85-3207, ADV079A -
1.20/5-29-85                        2.10/6-4-85                Adjusted stem lock nut 4.80/5-29-85                          2.0/6-4-85              and shaft.
7.24/5-29-85                        3.43/6-4-85                MWR85-3208, A0V079B -
Adjusted stem lock nut and shaft.
l                                                                                                36.74/1-28-86                      5.75/2-14-86                WR86-0626, 0627, I
(Combined)                          (Combined)                  ADV039C&D - Cleaned j                                                                                                        -                                      -
disc and seat.
i                                                  -
l                                                                                                0.57/2-26-86                      0.57/2-26-86 0.0/2-26-86                        0.0/2-26-86                                            -l 1.80/2-26-86                      1.80/2-26-86                                              ;
3.91/2-26-86                      3.91/2-26-86 l
l l                                                                                                ~0.52/9-16-86                    0.52/9-16-86                                            ,,
!                                                                                                (Combined)                        (Combined)
                                                                                                                                                                                              +
l            I-30 Reactor Recir.              C      IB31*A0V081 - (IPC)                        0.07/4-24-85                      0.07/4-24-85 f
Sample                            IB31*A0V082 (OPC)                          0.07/4-24-85                      0.07/4-24-85 I-31 Equipment                  C      IGil*MOV248 (OPC)                            12.0/5-4-85                        0.60/6-3-85                W R85-2894, MOV249 -
Drains                            IG11*MDV249 (OPC)                          16.43/5-4-85                        0.32/6-3-85                Lapped disc.-
X-32 Floor Drains                C      IG11*MDV246 (OPC)                          0.27/10-17-85                    0.27/10-17-85                                                '
l                                                    ICI1*MDV247 (OPC)                          -0.0/10-17-85                      0.0/10-17-85 O.0/7-28-86                        0.0/7-28-86                WR86-3384, MOV247 -
            .                                                                                    0.61/7-28-86                      0.61/7-28-86                . Adjusted torque and l                                                                                                                                                                limit switches.              [
r                          Page 15 of 31 l      _            _
 
      - .. ..            . .      .  -    -    _ _ = . - -          -          . ~ . -    ~ .            _ _ .                .    . .. ..
7 O  <- -
O                                                    O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA 4
PRE-REPAIR      POST-REPAIR                              _
jf I                            TYPE  EQUIPMENT / VALVES                  LEAKAGE /DATE    LEAKAGE /DATE                          ; -L cs-
                                                                                                                                  '~
i  PENETRATION NO.          TEST      TESTED                          (SCF/ hour)      (SCF/ hour)          REPAIR / NOTES X-33 Spare                C-                                        0.0/2-19-86          0.0/2-19-86 X-34 Spare                C                                        0.0/11-22-85      0.0/11-22-85                                          [
X-35 Spare                C                                        0.0/11-22-85      0.0/11-22-85 X-36 Standby Liquid      C    1C41*02V-0008 (IPC)                3.30/10-24-85      0.72/12-30-85          MWR83-8141, 02V-0008        .
Control              IC41*02V-0010 (OPC)                1.03/10-24-85    0.196/12-30-85          Replaced valve.
MWR83-8142, 02V-0010 --
Replaced valve.
X-37A TIP                C    IC51*SOV801A (OPC)                  0.12/2-22-85      0.12/2-22-85 B.    "O" Rings                          0.0/12-12-85      0.0/12-12-85 0.104/12-22-86      0.104/12-22-86          MWR86-4159, SOV801A -
J                                                                              -                  -
Replaced valve.
i
;                                                                        0.0/1-8-87            0.0/1-8-87 l                                                                        0.0/1-10-87          0.0/1-10-87 X-37B TIP                C    IC51*SOV801B (OPC)                0.042/2-22-85      0.042/2-22-85 1                            8.    "0" Rings                          0.0/12-12-85      0.0/12-12-85 I
70.16/12-22-86                              MWR86-4383, SOV8018 -
Replaced O rings.
: 2.                                                                      2.4/1-10-87          0.0/1-10-87        MIR86-6048 SOV801B -
l                                                                      0.0/1-10-87          0.0/1-10-87        Bolted finneen.
i
: j.                                          ,
Page 16 of 31
 
ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAbd RATE TEST DATA PRE-REPAIR    POST-REPAIR i                                      TYPE EQUIPMENT / VALVES          -LEAKACE/DATE      LEAKAGE /DATE PENETRATION NO.                TEST      TESTED                      (SCF/ hour)    (SCF/ hour)    REPAIR / NOTES X-37C TIP                        C  4C51*SOV801C (OPC)          0.344/2-22-85      0.344/2-22-85                            ,
4 B  "0" Rings                    0.0/12-12-85      0.0/12-12-85 1.04/12-22-86    MWR86-4383,SOV801C -
0.0/1-10-87      0.0/1-10-87    Replaced 0 rings.
X-37D TIP                        C  1C51*SOV801D (OPC)              0.0/2-22-85      0.0/2-22-85
,                                      B  "0" Rings                    0.0/12-12-85      0.0/12-12-85                          -
l 0.07/12-22-86      0.07/12-22-86    MWR86-4383,SOV801D -
0.0/1-10-87      0.0/1-10-87    Replaced O rings.
X-38 TIP                        C  IC51*SOV028 (OPC)            0.031/2-13-85      0.031/2-13-85 IC51*01V-0867 (OPC)          0.51/2-13-85      0.51/2-13-85 0.175/6-8-85      0.175/6-8-85 l                                                                        0.058/1-30-86      0.049/2-28-86    MWR85-6901, 01V-0867 -
0.411/1-30-86      0.72/2-28-86    Lapped seat and replaced nuts & studs.
B  "0" Rings                    0.0/12-12-85      0.0/12-12-85 4
0.0/1-10-87      0.0/1-10-87
+
X-39A Instrument Air            C  IP50*01V-698A (IPC)          0.046/1-3-86      0.046/1-3-86 1P50*MOV106 (OPC)            0.457/1-3-86      0.457/1-3-86 4    X-39B' Instrument Air            C  IP50*01V-6988 (IPC)          0.0/12-27-85'      O.0/12-27-85 j                                          IP50*MOV104 (OPC)          0.052/12-27-85    0.052/12-27-85
{                                                                  _Page 17 of 31
:                                                I,
* O                                              O                                            O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR      POST-REPAIR TYPE EQUIPMENT / VALVES            LEAKAGE /DATE    LEAKAGE /DATE PENETRATION NO.      TEST    TESTED                    (SCF/ hour)      (SCF/ hour)  REPAIR / NOTES X-40 Spare                                              0.0/11-22-85      0.0/11-22-85 X-41 HPCI Vacuum      C  1E41*MOV049 (OPC)            0.165/1-2-86      0.165/1-2-86 Breaker                                          0.017/7-25-86      0.0/7-25-86 X-42 RCIC Vacuum      C  IE51*MOV049 (CPC)            0.04/12-21-85    0.04/12-21-85 Breaker X-43 RHR              C                                                                Tested with XS-5 X-44A Cont. Atmos. C  IT48*MOV033A (OPC)            0.04/2-22-85      0.04/2-22-85 Control            IT48*MOV038A (OPC)          0.018/2-22-85    0.018/2-22-85 0.28/12-4-86      0.28/12-4-86 0.24/12-4-86      0.24/12-4-86.
X-44B Drywell Floor  C  IT23*MOV031A (OPC)
Seal Pressur-                                        -
0.081/3-6-85  MWR84-3538, 4012, ization                                          0.0/12-4-86      0.0/12-4-86  MOV031A - Repacked valve and tightened packing gland.
X-45A Ccat. Atmos. C  IT48*MOV033B (OPC)            0.07/1-2-86      0.07/1-2-86 Control            IT48*MOV038B (OPC)            0.083/1-2-86      0.083/1-2-86 X-45B Drywell Floor  C  IT23*MOV031B (OPC) ,-          0.0/1-2-86        0.0/1-2-86 Seal Pressur-ization-Page 18 of 31
 
O                -
O                                              O          .
ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR        POST-REPAIR TYPE EQUIPMENT / VALVES          LEAKAGE /DATE      LEAKAGE /DATE.
PENETRATION NO. TEST      TESTED                    (SCF/ hour)      (SCF/ hour)  REPAIR / NOTES X-46 Cont. Atmos. C  IT48*MOV031A (IPC)          1.85/12-5-85      1.85/12-5-85                          -i Control, DW        IT48*MOV035A (OPC)          0.41/12-5-85      0.41/12-5-85 Inerting            IT24*A0V001A (OPC)          0.51/12-5-85      0.51/12-5-85 IT24*A0V001B (OPC)          32.58/12-5-85                      MWR85-7277, A0V001B -
Lapped seat.
1.25/1-20-86      1.25/1-20-86 0.225/1-20-86      0.225/1-20-86 0.41/1-20-86      0.41/1-20-86 0.82/1-20-86      0.82/1-20-86 X-47 Cont. Atmos. C  IT48*MOV031B (IPC)          0.041/12-5-85      0.041/12-5-85 Control            IT48*MOV035B (OPC)          3.08/12-5-85      3.08/12-5-85 0.038/2-5-86        0.0/2-21-86  MWR85-7199, MOV035B -
                                                                                        > 72/2-5-86      0.0/2-21-86  Adjusted torque switch and cleaned internals.
XS-1 Spare          C                                0.0/11-20-85      0.0/11-20-85 XS-2 Spare          C                                0.0/11-4-85        0.0/11-4-85 XS-3 Spare          C                                0.0/11-5-85        0.0/11-5-85
                            .XS-4 Spare              C                                0.0/11-22-85      0.0/11-22-85 Y
 
_ _ _ - - . .  - . . . - . . . _ . _ .                    .-      -      ..        . . .  .-          . .. - ~            ~-      .          _.
O                                                      O                                                      O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR          POST-REPAIR TYPE          EQUIPMENT / VALVES            LEAKAGE /DATE          LEAKAGE /DATE PENETRATION NO.              TEST
_ TESTED                        (SCF/ hour)            (SCF/ hour)      REPAIR / NOTES XS-5 RHR                        C          IEll*MOV055A (OPC)              0.0/7-24-86            0.0/7-24-86 IE11*MOV056A (OPC)                        -
0.0/7-24-86      MWR86-3364, MOV056A -
IEll*MOV055B (OPC)              0.0/1-29-86            0.0/1-29-86      Adjusted torque and limit switches.
1 Ell *MOV056B (OPC)            >72/1-23-86            0.0/1-29-86      MWR86-0496, MOV0568 -
IEll*RV157A (OPC)              0.31/1-17-86            0.31/1-17-86      Adjusted torque. switch.
lEll*RV157B (OPC)                0.0/1-17-86            0.0/1-17-86 IEll*RV152A (OPC)                0.0/1-17-86            0.0/1-17-86 IEll*RV152B (OPC)            0.082/1-17-86        0.082/1-17-86 IEll*0lV-3144 (OPC)            0.21/1-17-86            0.21/1-17-86 1E11*OIV-3145 (OPC)            7.39/l-17-86            1.75/2-4-86      MWR86-0423, OlV-3145.-
Cleaned valve-internals.
XS-6 Supp. Pool                  C          IG41*MOV034A-(OPC)''            O.0/10-16-85            0.0/10-16                    Pump Down                          1G41*MOV034B (OPC)            0.195/10-16-85        0.195/10-16-85 XS-7 Cont. Atmos.              C          IT48*MOV034B (OPC)              0.0/10-21-85            0.0/10-21-85 Control                            IT48*MOV040B (OPC)              0.0/10-21-85            0.0/10-21-85 XS-8 Cont. Atmos.              C          IT48*MOV034A (OPC)              0.0/10-22-85            0.0/10-22-85 1                  Control                            IT48*MOV040A (OPC)            0.41/10-22-85        0.41/10-22-85 XS-Il Spare                    C                                            0.0/11-5-85            0.0/11-5-85 XS-12 Spare                    C                                            0.0/11-5-85            0.0/11-5-85 XS-13 Spare                    C                                            0.0/11-5-85            .0.0/11-5-85 i
.                                                                                Page 20.of 31 p.
 
O                                              O                                            O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR      POST-REPAIR TYPE  EQUIPMENT / VALVES            LEAKAGE /DATE    LEAKAGE /DATE PENETRATION NO. TEST        TESTED                    (SCF/ hour)      (SCF/ hour)  REPAIR / NOTES
  'XS-14 Spare          C                                    0.0/11-5-85      0.0/11-5-85 XS-15 Spare        C                                      0.0/11-5-85      0.0/11-5-85 XS-16A Service Air  C    IP50*02V-0603 (IPC)            >72/10-28-85    0.41/11-7-85  MWR85-6588, 02V-0603 -
IP50*02V-0601 (OPC)            >72/10-28-85    0.14/11-7-85  Cleaned valve internals and lapped disc & seat.
MWR85-6589, 02V-0601 -
Cleaned valve internals.
XS-16B Rad. Mon. C    1D11*MOV032A (IPC)            0.0/10-26-85    0.0/10-26-85 ID11*MOV032B (OPC)            0.0/10-26-85    0.0/10-26-85 XS-16C Rad Mon. C    ID11*MOV033A (IPC)            0.11/11-2-85    0.11/11-2-85 1D11*MOV033B (OPC)              0.0/11-2-85      0.0/11-2-85 XS-17 Spare        C                                      0.0/11-4-85      0.0/11-4-85 XS-18 Spare        C                                      0.0/11-4-85      0.0/11-4-85 XS-19 Spare        C                                      0.0/11-4-85      0.0/11-4-85 XS-20 Cont. Atmos. C    IT48*MOV032A (IPC)            0.133/12-3-85    0.133/12-3-85 Control          -IT48*MOV037A (OPC)            0.103/12-3-85    0.103/12-3-85 Page 21 of 31
 
;            O                                                                        O                                                                O
                                                                                                                                                                ~
l ATTACHMENT 4A (Continued)                                                                                ,
1986 LOCAL LEAKAGE RATE TEST DATA i                                                                                      PRE-REPAIR              POST-REPAIR
!                              TYPE  EQUIPMENT / VALVES                              LEAKAGE /DATE            LEAKAGE /DATE l  PENETRATION NO.            TEST        TESTED                                      (SCF/ hour)              (SCF/ hour)      REPAIR / NOTES 4
; XS-21 Cont. Atmos.          C    IT48*MOV032B (IPC)                                8.03/1-4-86              0.0/1-25-86      MWR86-0155, MOV032B -
i          Control                  IT48*MOV037B (OPC)                                  0.0/1-4-86              0.0/1-25-86      Cleaned valve          .a
]                                                                    c                                                              internals.
XS-22 DW Vent                C    IT46*A0V078A (IPC)                                1.34/1-4-86              1.34/1-4-86 IT46*A0V078B (OPC)                                0.216/1-4-86            0.216/1-4-86    -
XS-23 Spare                  C                                                        0.0/2-25-85              0.0/2-25-85 0.041/6-10-85              0.0/6-17-85      MWR85-3538, XS                                                                                                                                    Opened penetration and torqued. closed.        ,
0.085/3-10-86      MWR86-0720, XS
* Opened penetration and torqued closed,
: j.                                                                                              -
0.0/5-22-86      MWR86-2305, XS ;                                                                                                                                  Opened penetration and
;                                                                                                                                  , torqued closed.
XS-24 Spare                  C.                                                          -
0.0/2-14-85      MWR85-0482, XS                                                                                                                    0.0/3-1-85      Replaced inside and
,                                                                                                              0.051/6-10      outside flanges.
,  XS-25 Spare                  C-                                                      0.0/11-22-85            0.0/11-22-85 XS-26 Spare-                C                                                      0.0/11-22-85            0.0/11-22-85 XS-28 Spare'                C                                                      0.0/11-22-85            0.0/11-22-85 I
l                                                                                  Page 22 of.31                        ,
 
O                                            O                                              O ATTACHMENT 4A (Continued)                                              ,
1986 LOCAL LEAKAGE RATE TEST DATA t
F PRE-REPAIR        POST-REPAIR TYPE EQUIPMENT / VALVES          LEAKAGE /DATE      LEAKAGE /DATE PENETRATION No. TEST      TESTED                    (SCF/ hour)      (SCF/ hour)    REPAIR / NOTES XS-30 Pass          C  IT48*SOV131 (OPC)            0.0/12-9-85      0.0/12-9-85 1T48*01V-0016B (OPC)        0.082/12-9-85    0.082/12-9-85 F-10 Reactor Recir. C  IB31*01V-0002A (IPC)        4.92/1-17-86    0.041/1-27-86    MWR86-0366, 01V-0002A - ;
Pump Seal          IB31*01V-1028A (OPC)        0.031/1-17-86    0.031/1-17-86    Lapped disc and seat.  {,
F-11 Reactor Recir. C  IB31*01V-0002B (IPC)        0.38/1-16-86      0.38/1-16-86 Pump Seal          IB31*01V-1028B (OPC)          0.0/1-16-86      0.0/1-16-86 B-3 Pass            C  IT48*SOV128A (OPC)          0.062/11-1-85    0.062/11-1-85                            l IT48*SOV128B (OPC)          0.072/11-1-85    0.072/11-1-85 B-7 Inst. Air        C  IP50*02V-695B (IPC)          0.0/12-6-85      0.0/12-6-85 to Drywell          IP50*MOV103A (OPC)          0.031/12-6-85    0.031/12-6-85                            I C-2 Pass ~          C  IB21*SOV313A-(OPC)            0.0/11-2-85      0.0/11-2-85                            ;
IB21*SOV313B (OPC)            0.0/11-2-85      0.0/11-2-85                            ,
D-5 Inst. Air        C  IP50*02V-0695A (IPC)        0.0/10-29-85      0.0/10-29-85 to Drywell          IP50*MOV103B (OPC)          0.29/10-29-85    0.29/10-29-85 J-2 Pass            C  1T48*01V-0016A.(OPC)        0.30/10-22-85    0.30/10-22                            IT48*SOV130 (OPC)          0.031/10-22-85    0.031/10-22-85 J-10 Pass            C  IT48*SOV126A (OPC)          0.0/10-23-85      0.0/10-23-85 IT48*SOV126B (OPC)          0.0/10-23-85      0.0/10-23-85 SP-NW Pass          C  IT48*SOV129A (OPC)          0.0/10-24-85      0.0/10-24-85 IT48*SOV129B (OPC)          0.0/10-24-85    -0.0/10-24-85                            a Page 23 of 31
 
i o                                                      o.                                                    o
.                                                                      ATTACHMENT 4A (Continued) l                                                              1986 LOCAL LEAKAGE RATE TEST. DATA-L PRE-REPAIR          POST-REPAIR                        '
TYPE EQUIPMENT / VALVES                LEAKAGE /DATE        ' LEAKAGE /DATE PENETRATION NO.                  TEST    TESTED                            (SCF/ hour)        (SCF/ hour)    REPAIR / NOTES' 4
SP-SE Pass                        C  IT48*SOV127A (OPC)              0.0/10-24-85            0.0/10-24-85
{                                              IT48*SOV127B (OPC)              0.0/10-24-85            0.0/10-24-85 l        IT23-Z-WA1 Spare                  B  Epoxy Seal                          0.0/4-1-85.          0.0/4-1-85 l                                                                                0.0/12-2-86            0.0/12-2 86
^
IT23-Z-WA2                        B  Welded Seal                      0.0/2-26-85            0.0/2-26-85 0.0/11-18-86            0.0/11-18-86 l        IT23-Z-WA3                        B  Welded Seal                      0.0/2-26-85            0.0/2-26-85
.                                                                              0.0/11-18            0.0/11-18-86
)        IT23-Z-WB1                        B  Epoxy Seal                        0.0/2-27-85            0.0/2-27-85 0.0/12-2-86            0.0/12-2-86 IT23-Z-WB2                        B  Epoxy Seal                          0.0/3-1-85            0.0/3-1-85 0.0/6-5-85            0.0/6-5-85 3
l        IT23-Z-WB3                        B  Epoxy Seal                          0.0/3-1-85            0.0/3-1-85 1
0.0/6-5-85            0.0/6-5-85                      ,
IT23-Z-WB4                        B  Epoxy Seal                        0.0/2-27-85            0.0/2-27-85 0.0/12-2-86            0.0/12-2-86 i
I        IT23-Z-WB5                        B  Epoxy-Seal                            0.0/3-1-85          0.0/3-1-85 1                                                                                      0.0/6-5-85          0.0/6-5-85                      '
i i                                                                            Page 24 of 31' 1                                                    i,                  ,
 
O                                                                      O                                                    O      i ATTACHMENT 4A (Continued)                                                          '[
f 1986 LOCAL LEAKAGE RATE TEST DATA                                                        ;
i                                                                                          PRE-REPAIR          POST-REPAIR
'                          TYPE              EQUIPMENT / VALVES                        LEAKAGE /DATE          LEAKGAE/DATE-PENETRATION NO.      TEST                  TESTED                                    (SCF/ hour)          (SCF/ hour)    REPAIR / NOTES
!-    IT23-2-WB6            B                Epoxy' Seal                                  0.0/2-26-85          0.0/2-26-85 0.0/11-18-86            0.0/11-18-86                          ,
IT23-Z-WC1            B                Epoxy Seal                                    0.0/3-1-85          0.0/3-1-85 1                                                                                            0.0/6-5-85          0.0/6-5-85 i    IT23-Z-WC2 Spare      B                Epoxy Seal                                    0.0/4-3-85          0.0/4-3-85                        -
0.0/12-2-86          0.0/12-2-86 I
IT23-Z-WC3 Spare      B                Epoxy Seal                                , 0.0/4-3-85            0.0/4-3-85 0.0/12-3-86          0.0/12-3-86 IT23-Z-WC4            B                Epoxy Seal                                  0.0/2-26-85          0.0/2-26-85
)
0.0/11-18-86            0.0/11-18-86 IT23-Z-WC5            B                Epoxy Seal                                    0.0/3-1-85          0.0/3-1-85
;                                                                                            0.0/6-5-85          0.0/6-5-85 IT23-Z-WC6          'B                Epoxy Seal                                  0.0/2-26-85          0.0/2-26-85 O.0/11-18-86            0.0/11-18 '
1T23-Z-WD1            B                Epoxy Seal                                    0.0/3-1-85          0.0/3-1-85 0.0/6-5-85          0.0/6-5-85
,                                                                                      0.0/10-15-85            0.0/10-15-85 0.0/11-19-85            0.0/11-19-85 IT23-Z-WD2            B                Epoxy Seal                                    0.0/3-7-85          0.0/3-7-85                      .
0.0/10-15-85            0.0/10-15-85                            '
:                                                                                    0.0/11-19-85            0.0/11-19-85 I-
)
l j                                                                                        .                                                              .
Page 25 of 31
 
  - ..            .  . .. --              . . _ _ . . - . . . -.            .      ..-    .=-. - - -          .-_  - . . .    .. .      - _ . - .                - .
O                                                        O                                                              O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA t
PRE-REPAIR              POST'-REPAIR TYPE  EQUIPMENT / VALVES                          LEAKAGE /DATE i                                                                                                          LEAKAGE /DATE PENETRATION NO.      TEST      TESTED l
(SCF/ hour)              (SCF/ hour)          REPAIR / NOTES 1T23-Z-WD3            B  Epoxy Seal                                    0.0/3-1-85 0.0/3-1-85                                                        ,
                                                                                  ~0.0/6-5-85                0.0/6-5-85                                                        .
1T23-Z-WD4            B  Epoxy Seal                                    0.0/4-1-85                0.0/4-1-85 0.0/12-3-86              0.0/12-3-86                                                        -
IT23-Z-WD5            B  Epoxy Seal                                    0.0/4-4-85 0.0/4-4-85 O.0/12-3-86              0.0/12-3-86
}        IT23-Z-WD6 Spare      B  Epoxy Seal                                      0.0/4-4-85                0.0/4-4-85 i
0.0/12-3-86              0.0/12-3-86 i
IT23-Z-EA1              B  Epoxy Seal                                    0.0/2-27-85              0.0/2-27-85 0.0/11-18-86              0.0/11'18-86
:        IT23-Z-EA2            B  Epoxy Seal                                    0.0/2-28-85              0.0/2-28-85 1
0.0/11-18-86              0.0/11-18-86 i
IT23-Z-EA3            B  Epoxy Seal                                    0.0/2-27-85              0.0/2-27-85 0.0/11-19-86              0.0/11-19-86 i      IT23-Z-EB1              B  Epoxy Seal                                    0.0/2-27-85 i
0.0/2-27-85 0.0/11-18-86                0.0/11-18-86
)      1T23-Z-EB2              B  Welded Seal i
0.0/2-27-85              0.0/2-27-85 0.0/11--18-86              0.0/11-18-86 IT23-Z-EB3              B  Epoxy Seal l
                                                                              -0.0/2-28-85                0.0/2-28-85 0.0/11-19-86                0.0/11-19-86 l
t i
Page 26 of 31 P
 
O                                                              O                                            O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR      POST-REPAIR TYPE  EQUIPMENT / VALVES          LEAKAGE /DATE    LEAKAGE /DATE PENETRATION NO.                            TEST        TESTED                  -(SCF/ hour)      (SCF/ hour)  REPAIR / NOTES IT23-Z-EB4 Spare                            B    Epoxy Seal                      0.0/4-4-85      0.0/4-4-85 0.0/11-25-86      0.0/11-25-86 IT23-Z-EB5                                  B    Epoxy Seal                      0.0/3-1-85      0.0/3-1-85 0.0/6-6-85      0.0/6-6-85 IT23-Z-EB6                                  B    Epoxy Seal                    0.0/2-27-85      0.0/2-27-85 0.0/11-19-86      0.0/11-19-86 IT23-Z-EC1 Spare                            B    Epoxy Seal                      0.0/4-3-85      0.0/4-3-85 0.0/11-26-86      0.0/11-26-86 IT23-Z-EC2 Spare                            B    Epoxy Seal                      0.0/4-4-85      0.0/4-4-85 0.0/11-26-86      0.0/11-26-86 IT23-Z-EC3                                  B    Epoxy Seal                      0.0/3-1-85      0.0/3-1-85 0.0/6-6-85      0.0/6-6-85 IT23-Z-EC4 Spare                            B    Epoxy Seal                      0.0/4-4-85      0.0/4-4-85                    :
0.0/11-26-86      0.0/11-26-86 IT23-Z-ECS                                  B    Epoxy Seal                    0.0/2-27-85      0.0/2-27-85 0.0/11-19-86      0.0/11-19-86 IT23-Z-EC6                                  B    Epoxy Seal                    0.0/2-27-85      0.0/2-27-85 0.0/11-19-86      0.0/11-19-86 Page 27 of 31
  . - - _ _ _ _ . . -_ - _ _ _. _ _ _ . _ _ _      _    _  u                                                                      j
 
O                                                                                  O                                                        O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR            POST-REPAIR
,                                                    TYPE    EQUIPMENT / VALVES                      LEAKAGE /DATE              LEAKAGE /DATE i
PENETRATION NO.                            TEST        TESTED                                  (SCF/ hour)              (SCF/ hour)  REPAIR / NOTES IT23-Z-ED1 Spare                            B    Epoxy Seal                                  0.0/4-3-85                0.0/4-3-85 0.0/11-25-86              0.0/11-25-86                                .
l          IT23-Z-ED2 Spare                            B    Epoxy Seal                                  0.0/4-4-85                0.0/4-4-85                                .
O.0/11-26-86              0.0/11-26-86                                  E IT23-Z-ED3 Spare                            B    Epoxy Seal                                  0.0/4-4-85                0.0/4-4-85 0.0/11-26-86                0.0/11-26-86 i
IT23-Z-ED4 Spare                            B    Epoxy Seal                                  0.0/4-4-85                0.0/4-4-85 0.0/11-25-86                0.0/11-25-86 IT23-Z-EDS                                  B    Epoxy Seal                                  0.0/3-1-85                0.0/3-1-85                                ,
0.0/6-6-85                0.0/6-6-85 0.0/10-17-85                0.0/10-17-85                                  '
0.0/11-19-85                0.0/11-19-85 1T23-Z-ED6                                  B    Epoxy Seal                                0.0/2-28-85              0.0/2-28-85
!                                                                                                    0.0/10-17-85                0.0/10-17-85 0.0/11-19-85                0.0/11-19-85 Supp. Pool                                  B    Resilient Seal and                0.D83/11-8-85                0.083/11-18-85 Laval A                                            Single Drn. Valve Supp. Pool                                  B    . Resilient Seal and                      0.0/1-30-86                0.0/1-30-86 Leval B                                            Single Drn. Valve                                                                                            ,
        '1T48*PNL-068A'                                B    "0" Rings                                0.31/3-9-85                0.31/3-9-85
                                                                                                  > 72/12-16-86                                  MWR87-0206, PNL-068A -
34.5/1-7-87              0.24/2-26-87    Rebuilt H    c replaced 00" Rings.
ells and j                                                                                            Page 28 of 31
;                                                                    l'
 
O                                            O                                                  O ATTACFJ4ENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR        POST-REPAIR.                                '
TYPE EQUIPMENT / VALVES          LEAKAGE /DATE      LEAKAGE /DATE PENETRATION NO. TEST    TESTED                    (SCF/ hour)      (SCF/ hour)  REPAIR / NOTES IT48*PNL-068B      B  "O" Rings                    14.60/2-9-85        1.0/4-12-85  MWR85-1555, PNL-0688  -
0,82/12-19-86      0.82/12-19-86  Replaced "0" Rings.
1T48*PNL-069A      B  "O" Rings                    34.49/3-9-85      13.25/4-9-85  MWR85-1554,PNL-065A-14.4/12-18-86      14.4/12-18-86  Replaced "O" Rings.
1T48*PNL-069B      B  "O" Rings                    14.24/3-9-85                    MWR85-1556, PNL-0698 -
Replaced "0" Rings.
34'.65/4-15-85      0.72/5-7-85  MWR85-2185 - Cleaned valve internals and 9.t4/12-23-86      9.44/12-23-86  replaced gasket, (boundary valve).          -
Paraonnel Airlock  B  "0" Rings _and Gaskets      8.51/6-11-85      8.51/6-11-85 53.04/7-13-85      12.26/7-14-85  MWR85-4066 - Machined equalizing valves 1.02/4-17-86      1.02/4-17-86  piping and tightened interlock pressure 6.36/1-17-87      6.36/1-17-87  switch.
Emargency Airlock  B  "O" Rings and Gaskets      12.23/2-11-85      12.23/2-11-85
                                                    > 72/3-12-85        0.50/4-2-85  MWR85-1590 - Tightened 0.51/9-30-85      0.51/9-30-85  fittings on door gages..
1.13/2-11-86      1.13/2-11-86  Cleaned door porthole 0.52/1-14-87      0.52/1-14-87  glass & mating surface and torqued bolts.
l'                                                                _ _ _ _      _
 
O                                          O                                                    O ATTACHMENT 4A (Continued)                                                  -
1986 LOCAL LEAKAGE RATE TEST DATA 4
^
PRE-REPAIR              POST-REPAIR TYPE EQUIPMENT / VALVES          LEAKAGE /DATE            LEAKAGE /DATE i PENETRATION NO. TEST    TESTED                    (SCF/ hour)              (SCF/ hour)    REPAIR / NOTES Equipment Hatch  B    "0" Rings                    0.0/2-11-85              0.0/2-11-85 0.0/3-12-85              0.0/3-12-85 0.0/4-2-85                0.0/4-2-85 0.0/2-11-86              0.0/2-11-86                        -
4  Control Rod      B    "0" Rings                    0.0/11-11-85            0.0/11-11-85    MWR85-5804 - Retest Removal Hatch                                                                                LLRT only. No work performed.
Suppression Pool  B    "0" Rings                  0.316/2-28-85            0.316/2-28-85 Access Hatch - SE                                  0.051/3-28-85            0.051/3-28-85 0.0/5-17-85              0.0/5-17-85 0.052/6-8-85            0.052/6-8-85 0.093/6-19-85            0.093/6-19-85 0.41/6-24-85            0.41/6-24-85
,                                                      1.43/7-5-85              1.43/7-5-85
!                                                    0.082/8-28-85            0.082/8-28-85 1.95/3-24-86            1.95/3-24-86 1
2.68/5-23-86            2.68/5-23-86
,                                                      3.06/8-19-86            3.06/8-19-86 Suppression Pool  B    "0" Rings                    0.0/2-22-85              ~0.0/2-22-85 Access Hatch - NW                                    0.0/6-3-85                0.0/6-3-85 0.0/7-7-85                0.0/7-7-85 0.0/8-28-85              0.0/8-28-85 0.0/2-19-86              0.0/2-19-86 Drywell Head      B    "0" Rings                    > 72/2-5-85            0.062/2-8-85    MWR85-0675, 0676 -
0.61/3-23-86            0.61/3-23-86    Replaced "0" Rings.
                                ,                  Page 30 of 31                                                        ,
 
                                                                  .=- -.        -_      ..-      .-..--_.-      -        -. ---    .          .  .-.
O                                                            O                                                          O ATTACHMENT 4A (Continued) 1986 LOCAL LEAKAGE RATE TEST DATA i
                                      ~
PRE-REPAIR            POST-REPAIR 1                                          TYPE    EQUIPMENT / VALVES                LEAKAGE /DATE            LEAKAGE /DATE l        PENETRATION NO.                  TEST        TESTED                        (SCF/ hour)              (SCF/ hour)        REPAIR / NOTES            :
,'        Hydrogen Recombiner                                                      46.80/1-17-85                                MWR85-0308, 0473, 0474, Loop A                                                                                                          0475, 0476, 0477 -
36.36/1-26-85              0.0/2-6-85        Replaced packing and      -
tightened packing glands on various-      ,
boundary valves.
16.38/1-13-87            10.33/3-30-87        MWR87-0284 - Replaced blower seal.
Tested under Leakage
]                                                                                                                                Reduction Program.      '!
i Hydrogen Recombiner                                                        > 72/1-21-85              0.0/2-6-85        MWR85-0350, Loop B                                                                                                            IT48*01V-0003B -          1 Replaced bonnet gasket,    ;
(boundary valve).          '
14.34/1-13-87            4.30/3-27-87        MWR87-0293 - Replaced blower seal.
3
;                                                                                                                                MWR87-1260 - Cleaned and lapped relief valve.
i
;                                                                                                                                Tested under Leakage l
;-                                                                                                                                Reduction Program.
1 t
1
;                                                                              Page 31 of 31 i
                                                          . l'
 
l I
o                                                                                              o                                                  o        '
l                                                                                                    ATTACHMENT. 4B                                                                  ,
i 1984 LOCAL LEAKAGE RATE TEST DATA                                                                      .
PRE-REPAIR      POST-REPAIR TYPE      EQUIPMENT / VALVES                                              LEAKAGE /DATE      LEAKAGE /DATE i              PENETRATION NO.              TEST              TESTED                                                    (SCF/ hour)      (SCF/ hour)      REPAIR / NOTES X-1A Main Steam                C        IB21*A0V081A (IPC)                                              1.84/3-18-84      1.84/3-18-84                                  .
;                                                    .IB21*A0V082A (OPC)                                              (Combined)        (Combined)                                .l 1B21*A0V061 (OPC)                                                                                                            ,!
LE32*MOV021A (OPC) 4
:              X-1B Main Steam                C        IB21*A0V081B (IPC)                                              > 72/3-15-84                          MWR84-1785, A0V081B -
i IB21*A0V082B (OPC)                                                  (Combined)                        Replaced stem & disc-
,                                                      1B21*MOV062 (OPC)                                                                                      and lapped seat & disc.
1E32*MOV021B (OPC)                                                                                                                ,
j                                                                                                                        2.87/5-1-84      2.18/5-6-84      MWR84-1785, A0V081B -
j                                                                                                                        (Combined)        (Combined)        Tightened packing.-          ,
i X-IC ' Main Steam              C        IB21*A0V081C (IPC)                                              > 72/3-22-84                          MWR84-2039, A0V082C -    .l 1B21*A0V082C (OPC)                                                  (Combined)                        Lapped disc & seat.
l                                                      IB21*MOV063 (OPC)
IE32*MOV021C (OPC)                                                                                  -MWR84-2056,'A0V081C    .
j                                                                                                                                                            Replaced plug & stem.
:i
                                                                                                        ~
                                                                                                                        > 72/5-10-84                          MWR84-3199, A0V081C -
;                                                                                                                            (Combined)                      Machined disc and 4
lapped seat &_ disc.
!                                                                                                                      > 72/6-8-84      0.83/9-21-84      MWR84-3771, A0V082C -
(Combined)    (Combined)        Machined seat and 1apped seat & disc.
i i
  ,                                                                                                      Page,1 of-29
 
O                                                O 1
i l                                            ATTACHMENT 4B (Continued)
;                                        1984 LOCAL LEAKACE RATE TEST DATA                                                  f l                                                                                                                            I i
PRE-REPAIR      POST-REPAIR I
TYPE  EQUIPMENT / VALVES          LEAKAGE /DATE    LEAKAGE /DATE PENETRATION NO. TEST      TESTED                    (SCF/ hour)      (SCF/ hour)      REPAIR / NOTES i
;      X-1D Main Steam  C    IB21*A0V081D (IPC)          58.32/5-4-84                        MWR84-1915, AOV081D    -
1B21*AOV082D (OPC)            1.68/5-4-84                        Lapped seat & disc.            ,
IB21*MOV064 (OPC)              0.0/5-4-84 I
1E32*MOV021D (OPC)              0.0/5-4-84.                                                      l
                                                          > 72/5-15-84                        MWR84-3085, A0V081D-I                                                          6.70/5-15-84                        Loosened packing.'
j                                                          0.0/5-15-84                                                        ,
0.0/5-15-84                        MWR84-3300, A0V081D-            i Cleaned internals &
j                                                                                              adjusted limit switch.
1
                                                            > 72/6-7-84                        MWR84-3772, AOV081D -            ,
l*                                                        24.70/6-7-84                        Inspected internals,          }
O.0/6-7-84                        machined seat, lapped          .
0.0/6-7-84                        seat & disc, &' replaced        ;
packing.                        l MWR84-3773, A0V081D-Tightened packing..          '!
l I                                                                                                                              f 10.98/7-3-84      0.75/9-24-84      MWR84-4309, AOV081D-            i
                                  ,                        2.14/7-3-84.      (Combined)      Machined seat 6 disc            .
0.0/7-3-84                        and lapped seat & disc.-
0.0/7-3-84                                                        -
k l
s                                                                                                                              t i
j                                                      Page 2 of.29 1
^
___                              . l.            .            -      -
 
    -. ._      -    .  -  . - -          -.  -  ..  - -      .~..- -          _ -      - . _ . -    . .- .-    .        - . - - -  ~
O                                                          O                                                        O          .
i j                                                            ATTACHMENT 4B (Continued)                                                          -
1984 LOCAL LEAKAGE RATE TEST DATA                                                        f f
PRE-REPAIR            POST-REPAIR                                i TYPE  EQUIPMENT / VALVES              LEAKAGE /DATE            LEAKAGE /DATE PENETRATION NO.              TEST      TESTED                        (SCF/ hour)            (SCF/ hour)    REPAIR / NOTES            i X-2A Feedwater                C    IB21*18V-1103A(IPC)              0.564/6-2-83              0.564/6-2-83 IB21*A0V036A (OPC)                -0.36/6-2-83              0.36/6-2-83                              i i
                                                                                >>72/4-5-84            8.322/6-15-84    MWR84-2303, 18V-1103A -
16.13/4-5-84              0.0/6-15-84    Cleaned internals.-        ,
MWR84-2304, A0V036A -
Cleaned internals'and
!                                                                                                                        replaced gasket.
X-2B Feedwater                C    IB21*18V-1103B (IPC)            2.074/5-27-83            2.074/5-27-83                              -
l                                            1821*A0V036B (OPC)              1.04/5-27-83              1.04/5-27-83                                ,
                                                                                                                                                  -t i                                                                          5.928/10-28-83            5.928/10-28-83                              !
j;                                                                            2.55/10-28-83            '2.55/10-28-83      ,
X-3    Main Steam            C    IB21*MOV031 (IPC)              > 72/11-30-83                              MWR83-7568 - Added Drains                      IB21*MOV032 (OPC)              >>72/11-30-83                              packing to boundary &'
test connection valves.    [
]                                                                            1.33/2-21-84              0.08/2-23-84    MWR84-1206, 1207, 1208, i                                                                            2.35/2-21-84              0.04/2-23-84    1209 - Tightened packing  l l                                                                                                                      on boundary and test
  ;                                                                                                                    . connection valves.
i                                                                          -
MWR84-1210, MOV031-        ,
Tightened packing.        !
{        X-4 Reactor Water            C    1G33*MOV033 (IPC) 0.41/10-20-83            0.41/10-20-83 Cleanup                      1G33*MOV034 (OPC)                        -                          -
O.0/4-2-84              0.0/4-2-84
  ;                                                                              0.0/4-2-84              0.0/4-2-84 I
i                                                                      Page 3 of 29                                                        -      +
V
 
O                                                              O                                              O ATTACHMENT 4B (Continued) 1984 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR        POST-REPAIR TYPE EQUIPMENT / VALVES            LEAKAGE /DATE      LEAKAGE /DATE PENETRATION NO.                    TEST    TESTED                    (SCF/ hour)        (SCF/ hour)    REPAIR / NOTES X-5  RHR from RPV                    C  IE11*MOV047 (IPC)                    -
1.13/5-24-83  MWR83-1344, MOV047 -
1E11*MOV048 (OPC)                    -                  -
Added packing.
1E11*RV163 (OPC) 36.73/2-3-84        0.0/4-9-84  MWR84-0836, MOV047 -
8.12/2-4-84        0.51/4-9-84  Lapped seat and' disc.
(Combined)        (Combined)
MWR84-2024, MOV048-Reset torque switch.-
X-6A RHR Recire.                    C  1E11*A0V081A (IPC)              3.08/5-3-83        3.08/5-3-83 Return                            IE11*MOV081A (IPC)              (Combined)        (Combined) 1E114MOV037A (OPC)                -                  -
1.53/6-27-84  MWR84-0950, MOV081A -
(Combined)    Replaced valve stem, 1.73/6-27-84  housing, and mounting flange.
MWR84-3099, MOV081A -
Replaced mounting flange.
MWR84-3894, MOV081A -
Added packing and replaced expulsion ring.
MWR84-3893, A0V081A -
Flushed valve.
Page 4 of 29 f                .                      -
_        _                        __d
 
;                                      O                                                                                  O                                                                O
)
i ATTACHMENT 4B (Continued) 1984 LOCAL LEAKAGE RATE TEST DATA i
1 i                                                                                                                          PRE-REPAIR                        POST-REPAIR
!                                                                                    TYPE EQUIPMENT / VALVES            LEAKAGE /DATE                      LEAKAGE /DATE I            PENETRATION NO.                                                          TEST      TESTED                    (SCF/ hour)                          (SCF/ hour)  REPAIR / NOTES              ,
j            X-6B RHR Recir.                                                          C  IE11*A0V081B (IPC)            0.724/5-4-83                        0.724/5-4-83 Return                                                        IE11*MOV081B (IPC)            (Combined)                          (Combined) l                                                                                          1E11*MOV037B (OPC)            0.83/5-11-83                        0.83/5-11-83        .
                                                                                                                          > 72/12-3-83                        0.28/1-21-84    MWR83-7771, A0V/MOV081B-'
j                                                                                                                          (Combined)                        (Combined)      Flushed valves.
i                                                                                                                        > 72/12-3-83                          0.0/1-21-84 0.34/1-23-84                        0.34/1-23-84 (combined)                          (combined) l                                                                                                                        1.33/1-23-84                        1.33/1-23-84
;            X-7A RHR Drywell                                                          C  IEll*MOV038A (OPC)          , 0.29/8-5-83                          0.29/8-5-83                              '
!                            Spray                                                          1E11*MOV039A (OPC)            4.20/8-5-83                          4.20/8-5-83 1
{                                                                                                                      , 0.10/11-8-83                        0.10/11-8-83 j                                                                                                                          0.0/11-8-83                          0.0/11-8-83                                  !
3            X-78 RHR Drywell                                                          C  1E11*MOV038B (OPC)            0.0/8-17-83                          0.0/8-17-83 l                            Spray                                                          1E11*MOV039B (OPC)            0.07/8-17-83                        0.07/8-17-83 0.22/11-10-83                      0.22/11-10-83 0.0/11-10-83                        0.0/11-10-83                                  -
X-8A RHR Pool Spray                                                        C  IE11*MOV040A (OPC)            30.0/8-26-83                                                    .
IEll*MOV041A (OPC)            > 72/8-26-83                                                                      '
;                                                                                          IEl1*MOV042A (OPC)              (Combined)
                                                                                                                                                                            ~
l l
i 1
Page 5 of 29 i
i                                                                                                  l.                                                                                                      1
 
    ~ . - _      .  . - - - . _ . - - _ -      - .      . . _ - -              _ .    . - . - - . - . - .-      - . - . . . .                .              -.
;                    O                                                                  O                                                                    O I
ATTACHMENT 4B (Continued) 1984 LOCAL LEAKAGE RATE TEST DATA l'
,                                                                                        PRE-REPAIR              POST-REPAIR
!                                            TYPE EQUIPMENT / VALVES                    LEAKAGE /DATE            LEAKAGE /DATE PENETRATION NO.                TEST      TESTED                            (SCF/ hour)              (SCF/ hour)                    REPAIR / NOTES                    I j                                                                                                                                                MWR83-7154,MOV040A -
                                                                                        > 72/11-9-83
!                                                                                        > 72/11-9-83                                            Machined seat and (Combined)                                          replaced gasket.
                                                                                        > 72/3-22-84                                            MWR84-2827, MOV040A -
                                                                                        > 72/3-22-84                                            Lapped seat and machined (Combined)                                          wedge.                          ,
;                                                                                                                                                MWR84-1992, 2827, 1650,            >
MOV040A-Machined wedge.
-                                                                                                                                                                                    i
                                            .                                            0.0/6-25-84              0.0/7-21-84                    MWR84-4082, MOV042A -
20.34/6-25-84            1.02/7-21-84                    Flushed valve.
(Combined)                (Combined)
:            X-8B RHR Pool Spray                C IE11*MOV040B (OPC)                                -                  -
l                                                IE11*MOV041B (OPC)                                -                  -
MWR83-1989, MOV042B -
;                                                IE11*MOV042B (OPC)                                -
0.51/7-26-83                    Replaced packing and
                                              .                                                                                                  tightened stem nut.
l
!                                                                                      > 72/12-19-83
                                                                                        >>72/12-19-83
                                                                                        > 72/12-19-83 i                                                                                        > 72/3-18-84                                            MWR83-8100, MOV040B -
;                                                                                        > 72/3-18                                            Flushed valve.
}                                                                                        > 72/3-18-84 10.0/3-20-84            0.18/3-21-84.                  .MWR83-8100, MOV040B -
i                                                                                        0.22/3-20-84            0.72/3-21-84                    Reset torque switch.
j                                                                                        (Combined)-              (Combined).
;                                                                                Page 6 of 29
: f.                -              -
 
  - . _ . -              . _  . . . . - - . . -.        . . - - - _ - ~ _ . _                . .    . . - . - ~ _ - . . - - . - . - . _ . -  -      - . _    - -
t O                                                                              O                                            .
O ATTACHMENT 4B (Continued) 1984 LOCAL LEAKAGE RATE TEST DATA                                                              ,
1 l                                                                                                    PRE-REPAIR              POST-REPAIR                                      ;
!                                              TYPE EQUIPMENT / VALVES                              LEAKAGE /DATE            LEAKAGE /DATE
;            PENETRATION NO.                    TEST      TESTED                                      (SCF/ hour)                (SCF/ hour)        REPAIR / NOTES            +
t
-            X-9A RHR Suction                    C  IEll*MG'/031A (OPC)                            > 72/10-4-83            0.0/12-11-83          MWR83-4980, MOV031A -
Cleaned internals.
0.72/4-4-84        MWR84-1523, MOV031A -      ,
Reset torque switch.'
X-9B RHR Suction                    C  IE11*MOV031B (OPC)                        12.24/10-15-83              1.13/12-20-83            MWR83-6490, MOV031B -
Replaced wedge.
X-9C RHR Suction                    C  1E11*MOV031C (OPC)                              > 72/10-4-83          0.62/12-15-83            MWR83-4979, MOV031C.-
Replaced disc.
X-9D RHR Suction                    C  1E11*MOV031D (OPC)                        14.33/10-15-83              3.40/12-11-83            MWR83-6486, MOV031D -
I Adjusted torque switch.
X-10A RHR Test Line                  C  IG41*MOV033A (OPC)                        1.65/5-16-83                    1.65/5-16-83 i                  Return, RHR                                                                0.1 9/8-2-83                      0.19/8-2-83 Test, Pass,                                                                1.89/8-15-83                    1.89/8-15-83 Radwaste, Fuel                                                              5.53/10-7-83                      0.0/3-22-84.        MWR83-3272, MOV033A -
Pool Cooling                                                                                                                      Lapped disc and seat.
;                  and Cleanup,
* l                  Core Spray 1G41*MOV0335 (OPC)                          0.0/5-16-83                    0.0/5-16-83 2.8 5/8-2-83                      2.85/8-2-83 j                                                                                              40.0/8-15-83                                          MWR83-5782, MOV033B -
61.0/10-7-83                      0.0/3-22-83        Lapped disc.
MWR83-3272, MOV033B -
Lapped disc and seat.. L
                                              ^
l                                                                                                                                                                              !
Page 7 of'29 i
g.
 
O                  .
O                                            O ATTACHMENT 4B (Continued) 1984 LOCAL LEAKAGE-RATE TEST DATA-4 PRE-REPAIR      POST-REPAIR TYPE EQUIPMENT / VALVES            LEAKAGE /DATE    LEAKAGE /DATE PENETRATION NO. TEST      TESTED                    (SCF/ hour)      (SCF/ hour)  REPAIR / NOTES IEll*MOV044A (OPC)          0.0/11-11-83      0.0/11-11-83 1E11*MOV045A (OPC)          0.0/11-11-83      0.0/11-11-83 IE11*01V-0047 (OPC)          0.0/11-11-83      0.0/11-11-83 22.0/1-30-84                    MWR84-0758, 01V-0047 -
1.70/2-21-84        0.0/3-29-84  Lapped disc and seat.
MWR84-1361, 01V-0047 -
Lapped seat and replaced gasket.
0.0/11-11-83      0.0/11-11-83 IEll*SOV168 (OPC)
O.0/1-30-84      0.0/1-30-84 0.0/2-21-84      0.0/2-21-84 0.0/3-29-84      0.0/3-29-84 s
1G11*MOV639C (OPC)            3.0/3-16-84      3.0/3-16-84 3.78/4-18-84      0.0/5-24-84  MWR84-2749, MOV639C -
Lapped seat.
IG11*03V-2110C (OPC)          2.80/3-16-84                    MWR84-1876, 03V-2110C -
2.04/4-18-84      0.0/5-24-84  Cleaned internals and replaced gasket.
MWR84-2748, 03V-2110C -
Cleaned internals.
IE21*MOV035A (OPC)            0.15/3-16-84      0.15/3-16-84 IE21*MOV034A (OPC)            0.0/3-16-84      0.0/3-16-84 0.0/12-12-84  MWR84-5696, MOV034A -
Replaced torque switch.
Page 8 of 29 t
 
O                                                    .O                                                                      O                  -
ATTACHMENT 4B (Continued)-                                                                              l!
1984 LOCAL LEARACE RATE TEST DATA PRE-REPAIR                        POST-REPAIR TYPE    EQUIPMENT / VALVES                  LEAKACE/DATE                        LEAKAGE /DATE                                      5 PENETRATION NO.      TEST          TESTED                            (SCF/ hour)                        '(SCF/ hour)  REPAIR / NOTES I-10B RHR Test        C      IE11*MOV044B (OPC)                    0.0/11-7-83                            0.0/11-7-83 Line Return,              IEll*MOV0458 (OPC)                  0.03/11-7-83                          0.03/11-7-83              ,
j HPCI, RCIC, Core          IE41*MOV036 (OPC)                    1.23/11-4-83                            1.23/11-4-83                                    .j Spray, Pass,              IE51*MOV036 (OPC)                    0.0/11-11-83                          0.0/11-11-83 Relief to RCIC            IEll*SOV169 (OPC)                    0.05/11-6-83                          0.05/11-6-83                                      1 Pump Suction              IE11*01V-0048 (OPC)                    0.0/11-6-83                            0.0/11-6-83                                    'l IE11*RV155 (OPC)                    18.40/3-21-84.                          0.25/5-11-84  MWR84-1947, RV155 --                  r Lapped seat & disc.                ~t IE21*MOV034B (OPC)                  2.45/3-19-84                          2.45/3-19-84 1E21*MOV035B (OPC)                                -
2.34/3-19-84  MWR84-0246, MOV035B -
Replaced gasket and                1 yoke.
X-11 RHR Head          C      IEll*MOV054 (IPC)                    0.82/3-24-84                          0.82/3-24-84                                        i Spray                  1 Ell *MOV053 (OPC)                  1.02/3-24-84                            1.02/3-24-84 IE11*RV164 (OPC)                    (Combined)                              (Combined)                                  ,
X-12 HPCI Turbine      C      IE41*MOV041 (IPC)              .0.50/10-13-83                            0.50/10-13-83 Steam                                                    0.50/11-28-83                          0.50/11-28-83 IE41*MOV042 (OPC)              7.171/10-13-83                            0.22/11-28-83  MWR83-6483, MOV047          =
IE41*MOV047 (IPC)              (Combined)                                (Combined)      Adjusted packing.
1E41*MOV048 (OPC)
X-13 HPCI Turbine      C      IE41*MOV044 (OPC)                  1.02/10-14-83                                          MWR83-6484, 18V-0022 -
Exhaust                IE41*18V-0021 (CPC)                1.53/10-14-83                                        Cleaned internals.
IE41*18V-0022 (OPC)              >72/10-14-83                                                                                  j
                                                                                                                                                              ,i 2.16/5-22-84                            2.03/6-14-84 WR84-0184, 18V-0022 -
2.88/5-22-84                          0.91/6-14-84  Replaced. swing arm.
20.52/5-22-84                            1.42/6-14-84 Page 9 of 29                                                                                      4 V
 
  . ~ . . . . _ - . . -        - - - . . .  ..- . - _ .                  . _ - . .          , _ - . - . - - . - . - -                  .-  .  . - . ~ . - .    - --              --    -
j                                                          .                                                                                                                                        o ATTACHMENT 4B (Continued) j                                                                                        1984 LOCAL LEAKAGE RATE TEST DATA
                                                              .                                                                                                                                    .!l
}                                                                                                                            PRE-REPAIR          POST-REPAIR                                        ri
                                                                                                                                                                                                    'i TYPE    EQUIPMENT / VALVES                                      LEAKAGE /DATE        LEAKAGE /DATE PENETRATION NO.                            TEST          TESTED                                              (SCF/ hour)            (SCF/ hour)          REPAIR / NOTES                  ,
,                                                                                                                                                                      MWR84-2961, 18V-0021 -          i l                                                                                                                                                                        Replaced disc hinge arm.    ,
MWR84-3491, 18V-0022 -
1                                                                                                                                                                        Lapped seat.
j J            X-14 Spare                                      C                                                              0.0/11-14-83          0.0/11-14-83 f'
X-15 HPCI Pump                                C      IE41*MOV032 (OPC)                                      0.04/10-15-83        0.04/10-15-83 Suction                                                                                                                                                                        -
t i            X-16 RCIC Turbine                              C      IE51*MOV041 (IPC)                                        0.0/10-17-83          0.0/10-17-83 i                        Steam                                      1E51*MOV042 (OPC)                                      0.09/10-17-83        0.09/10-17-83 j                                                                  IE51*MOV047 (IPC)                                      (Combined)            (Combined) 1E51*MOV048 (OPC)                                                ,
!            X-17 RCIC Turbine                              C    .lE51*MOV045 (OPC)                                      36.65/10-12-83              0.11/3-7-84      MWR83-6371, MOV045 -        'f
,                        Exhaust                                    IE51*08V-0020 (OPC)                                      0.19/11-5-83          0.19/11-5-83        Motor operator' reworked
[                                                                  IE51*08V-0021 (OPC)'                                    O.10/11-5-83          0.10/11-5-83          and lapped seat.                '
X-18 RCIC Vacuum                              C      1E51*MOV046 (OPC)                                      ~ > 72/10-18-83            0.0/3-14'-84      MWR83-6684, 02V-0025 -          ,
j                        Pump                                      IE51*02V-0025 (OPC)                                      (Combined)              (Combined)        Cleaned internals,            ,
,                                                                                                                                                                          lapped disc'and            ..
j                                                                                                                                                                        replaced gasket.            -l l                                                                                                                                                                        MWR84-0702, MOV046 -
!                                                                                                                                                                        Rebuilt operator, .        .i replaced disc & packing.        ;
i I                                                                                                                                                                                                        ;
r i
4 Page 10 of 29
]
              . _ _ _                      _                  _          f.        _      _                              . _ .      ,_ -                          _    _    . _. __ -_
 
O                                                                                        O                                                        O ATTACHMENT 4B (Continued) 1984 LOCAL LEAKAGE RATE TEST DATA                      -
PRE-REPAIR          POST-REPAIR TYPE                  EQUIPMENT / VALVES                        LEAKAGE /DATE        LEAKAGE /DATE PENETRATION NO.                TEST                                  TESTED                      (SCF/ hour)          (SCF/ hour)          REPAIR / NOTES i
X-19 RCIC Pump                  C                    IE51*MOV032 (OPC)                        0.35/10-18-83        0.35/10-18-83                                        ,
Suction X-20A Core Spray                C                    IE21*AOV081A (IPC)                            0.0/12-2-83        0.0/12-2-83
* IE21*MOV081A (IPC)                          0.0/12-2-83        0.0/12-2-83 IE21*MOV033A (OPC)                          0.04/12-2-83        0.04/12-2-83
* X-20B Core Spray                C                    IE21*A0V081B (IPC)                            0.13/6-6-83        0.13/6-6-83 IE21*MOV081B (IPC)                            (Combined)          (Combined)
IE21*MOV033B (OPC)                              -                    -
0.0/12-1-83        0.0/12-1-83 (Combined)          (Combined) 0.0/12-1-83        0.0/12-1-83 0.28/7-17-84        0.28/7-17-84 (Combined)          (Combined) 0.32/7-17-84        0.32/7-17-84 i
X-21A Core Spray                C                    IE21*MOV031A (OPC)                    28.74/10-16-83          0.29/11-21-83          MWR83-6489, MOV031A -
Suction                                                                                                                              Cleaned disc and seat.
0.16/4-9-84        0.16/4-9-84 14.33/10-23-84                                  MWR84-4732, MOV031A -
Replaced limit switch and inspected internals.
46.0/11-8-84                              MWR84-5988, MOV031A -          1 Replaced torque switch.        ,
5.11/12-8-84      10.031/3-4-85          MWR84-6306, MOV031A -
Inspected valve internals.
!                                                                                            Page 11 of 29 l                                                                            r                                                                                            __
 
O                                                O                                            O ATTACHMENT 4B (Continued).                    -    ,
1984 LOCAL LEAKAGE RATE TEST DATA                          '
PRE-REPAIR      POST-REPAIR TYPE EQUIPMENT / VALVES          ' LEAKAGE /DATE    LEAKAGE /DATE                                  ,
PENETRATION NO.        TEST      TESTED                    (SCF/ hour)      (SCF/ hour)    REPAIR / NOTES I-21B Core Spray        C  IE21*MOV031B (OPC)            0.83/10-16-83    0.83/10-16-83 Suction                                            0.05/11-28-84    0.05/11-28-84                              .
I-22A RBCLCW            C  IP42*MOV035 (OPC)              0.0/10-30-83    0.10/12-15-83    MWR83-5529, MOV035 -
Added packing and anti-extrusion ring.
I-22B RBCLCW            C  IP42*MOV047 (OPC)              0.05/11-2-83    0.05/11-2-83 0.'0/12-1-84  MWR84-5212, MOV047 -
Adjusted packing.
.I-23A RBCLCW            C  IP42*MOV036 (OPC)            0.18/10-30-83    0.18/10-30-83 I-23B RBCLCW            C  IP42*MOV048 (OPC)            0.037/11-2-83    0.037/11-2-83    MWR84-5213, MOV048 -
0.18/12-1-84    Adjusted packing.
X-24A RBCLCW to        C  IP42*03V-0037AA (IPC)        > 72/ l'0-31-83  0.064/1-25-84    MWR83-6854, 03V-0037AA -
Drywell Coolers      IP42*MOV232 (OPC)            0.06/10-31-83      0.0/1-25-84    Cleaned and lapped disc.
0.14/12-5-84    0.14/12-5-84 0.15/12-5-84    0.15/12-5-84 I-24B RBCLCW to          C  IP42*03V-0037AB (IPC)          0.0/11-1-83      0.'0/11-1-83 Dryvell Coolers      IP42*MOV233 (OPC)              0.07/11-1-83    0.07/11-1-83                                ,
I-24C RBCLCW to          C  IP42*03V-0037AC (IPC)          0.24/11-1-83    0.24/11-1-83 Drywell Coolers      IP42*MOV234 (OPC)              0.08/11-1-83    0.08/11-1-83 0.22/12-5-84    0.22/12-5-84 0.22/12-5-84    0.22/12-5-84 Page 12 of 29 l'
 
r -
ATTACHMENT 4B (Continued)
                                                                *1984 LOCAL, LEAKAGE RATE TEST DATA                                                                                        g PRE-REPAIR                    POST-RENAIR TYPE                  EQUIPMENT / VALVES            LEAKAGE /DATE                  LEAKAGE /DATE                            ,
J PENETRATION NO.
    ~~
TEST                      TESTED                    (SCF/ hour)                    (SCF/ hour)                          .[' REPAIR / NOTES*                    ,
X-24D RBCLCW to        C                    IP42*03V-0037AD (IPC)        >72/11-1-83                    0.05/1-10-84                              MWR83-6855, 03V-0038AD'-          ,
Drywell Coolers                        IP42*MOV235 (OPC)            >72/11-1-83                    0.04/1-10-84                                Cleaned and lapped disc and replaced gasket, (boundary valve).
X-24E RBCLCW to        C                    IP42*03V-0037BA (IPC)          2.6/11-3-83                                                              MWR83-6956, 03V-0037BA -
Drywell Coolers                        IP42*MOV237 (OPC)            0.09/11-3-83                                                              Cleaned and lapped disc.
4 1.53/12-5-83                  0.05/1-16-84                                MWR83-7712, 04V-0038BA -
1.74/12-5-83                  0.00/1-16-84                                Lapped disc, (boundary valve).
0.11/1-16-84 X-24F RBCLCW to        C                    IP42*03V-0037BB (IPC)        22.30/11-3-83                                                              MWR83-6951, 03V-0038BB -
Drywell Coolers                        IP42*MOV238 (OPC)'            3.58/11-3-83                  0.41/1-16-84                                Cleane'd-internals and lapped' disc and replaced gasket, . (boundary valve).
    ..X-24G RBCLCW to        C                    IP42*03V-0037BC (IPC)          0.0/11-3-83                    0.0/11-3-83                                                                ,
Drywell Coolers                        IP42*MOV239 (OPC)            0.12/11-3-83                  0.12/11-3-83 X-24H RBCLCW to        C                    IP42*03V-0037BD (IPC)        0.031/11-3-83                                                              MWR83--6958, MOV240 '-
Drywell Coolers                        IP42*MOV240-(OPC)            3.99/11-3-83                                                              Cleaned internals and lapped disc and replaced gasket.
3.27/12-4-83                                                              MWR83-7713, 03V-0037BD -        t 0.05/12-4-83                                                              Cleaned and inspected          .
internals and replaced gasket.
Page 13 of 29 l'              _
 
O                                                O                                                  O          i i
!                                                ATTACHMENT 4B (Co,ntinued) 1984 LOCAL LEAKAGE RATE TEST DATA                                              ,
PRE-REPAIR          POST-REPAIR                              -
!                            TYPE EQUIPMENT / VALVES            LEAKAGE /DATE        LEAKAGE /DATE t
PENETRATION NO.        TEST    TESTED                    (SCF/ hour)          (SCF/ hour)    REPAIR / NOTES 3
0.19/1-19-84        0.12/2-16-84      MWR84-0485, MOV240 -
28.50/1-19-84          0.07/2-16-84      Cleaned internals and lapped wedge and replaced packing. .    'I X-25A RBCLCW from        C IP42*MOV147 (IPC)            10.36/5-13-83                          MWR83-2224, MOV147 -    i Drywell Coolers      IP42*MOV231 (OPC)          0.031/3-71-83          0.12/5-17-83      Lapped seat and        i IP42*RV291A (OPC)            (Combined)            (Combined)        disc.
MWR83-2104, RV291A -
l                                                                                                      Removed and calibrated J                                                                                                      valve.
4                                                                                                      MWR83-4660, MOV147'-
)                                                                                                    Set limits and stroked q                                                                                                    valve.
0.0/10-31-83        0.0/10-31-83
;                                                            1.84/10-31-83      -1.84/10-31-83 (Combined)            (Combined)
O.0/12-3-84        0.0/12-18-84      MWR84-5228, MOV231 -
:                                                              1.01/12-3-84        0.62/12-18-84      Adjusted packing.
2 (Combined)          (Combined)
MWR84-6690, MOV231 -
l                                                                                                    Added packing and
  ;                                                                                                  . replaced anti
  )                                                                                                ,
extrusion ring.
I l
i Page 14 of 29 I,                                  e                                                                                        ,
 
O                                                                            O                                                              O' ATTACHMENT 4B (Continued) 1984 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR      POST-REPAIR TYPE          EQUIPMENT / VALVES                            LEAKAGE /DATE    LEAKAGE /DATE m  PENETRATION NO.            TEST              TESTED                                    (SCF/ hour)          (SCF/ hour)                REPAIR / NOTES X-25B RBCLCW from          C            1P42*MOV148 (IPC)                          0.154/5-16-83    0.154/5-16-83                    'MWR83.2251, MOV236 -
Drywell Coolers                    IP42*MOV236 (OPC)                            0.23/5-16-83    0.82/5-18-83                      Retest LLRT only.
IP42*RV291B (OPC)                            0.0/5-17-83          0.0/5-17-83                No work performed.
0.0/11-4-83                MWR83-1708, MOV148 -
0.38/11-4-83    0.38/11-4-83                      Replaced torque switch.
(Combined)        (Combined)
  - X-26 Purge Air            C            IT46*A0V038A (IPC)                          > 72/12-7-83            0.0/3-8-84                MWR83-7772, A0V038A -
IT46*A0V038B (OPC)                              (Combined)          (Combined)                Cleaned seat and lubricated.
X-27 Purge Air              C            1T46*A0V039A (IPC) ~                        5.11/12-7-83      5.11/12-7-83 IT46*A0V039B (OPC)                          (Combined)        (Combined)
                                                                                          > 72/6-4-84      1.43/6-20-84                    MWR84-3205, A0V039A -
(Combined)      (Combined)                      Cleaned seat and lubricated.
X-28 Purge Air,            C          .IT46*A0V038C (OPC)                          > 72/12-18-83      0.52/1-13-84 SC Inerting                        IT46*A0V038D (OPC)                        > 72/12-18-83      0.31/1-13-84                    MWR83-8058,'AQV038D -
1T24*A0V004A (OPC)                        > 72/12-18-83            0.0/1-13-84                Adjusted packing.
1T24*A0V004B (OPC)                          > 72/12-18-83          0.0/1-13-84
                                                                                        > 72/12-28-84                                      MWR84-7274,:A0V038D -
                                                                                        > 72/12-28-84                                      Tightened packing gland.
                                                                                        > 72/12-28-84
                                                                                        > 72/12-28-84 Page 15 of 29 r
:                  O                                                    O                                              O ATTACHMENT 4B (Continued) 1984 LOCAL LEAKAGE RATE TEST DATA 1
PRE-REPAIR      POST-REPAIR TYPE EQUIPMENT / VALVES              LEAKAGE /DATE    LEAKAGE /DATE PENETRATION NO.        TEST          TESTED                    (SCF/ hour)      (SCF/ hour)    REPAIR / NOTES X-29 Purge Air          C  IT46*A0V039C (OPC)              > 72/12-17-83                      MWR83-8089,A0V039C-IT46*A0V039D (OPC)              0.0/12-17-83                      Cleaned and adjusted IT46*A0V079A (OPC)              > 72/12-17-83                      seat and T-ring.          ;
1T46*A0V079B (OPC)              2.74/12-17-83 MWR83-8090, 01V-3016 -
Replaced packing, (test connection).
0.32/1-7-84      0.84/1-28-84  MWR84-0259, A0V079A -
1.50/1-7-84      1.20/1-28-84  Cleaned internals
!                                                                        7.20/1-7-84      1.20/1-28-84  and replaced gasket.
1.76/1-7-84      2.06/1-28 i          X-30 Reactor Recir.      C  IB31*A0V081 (IPC)                0.10/2-13-84      0.10/2-13-84 4
Sample                  IB31*A0V082 (OPC)                0.10/2-13-84      0.10/2-13-84 X-31 Equipment          C  IG11*MOV248 (OPC)                0.0/10-25-83        0.0/12-4-83  MWR83-6681, MOV249 -
Drains                  1G11*MOV249 (OPC)            20.53/10-25-83            0.0/12-4-83 Lapped seats and wedge.    ;
X-32 Floor Drains        C  1G11*MOV246 (OPC)                0.0/10-26-83      0.0/10-26-83 IG11*MOV247 (OPC)              0.72/10-26-83      0.72/10-26-83 X-33 Spare              C                                    0.0/11-14-83      '0.0/11-14-83
)
j          X-34 Spare              C                                  'O.0/11-13-83      0.0/11-13-84 1
)          X-35 Spare              C                                    0.0/11-13-83      0.0/11--13-84                                ,
X-36 Standby Liquid      C  1C41*02V-0008 (IPC)            0.30/10-26-83      0.30/10-26-83  MWR83-6857, 02V-0010 -
l              Control                IC41*02V-0010 (OPC)                    --
1.32/10-26-83  Added packing and replaced. anti-extrusion ring.
l                                                                          .
i Page 16 of 29
__.                      __ _                .f                                                                _    ____    __
 
n' ~                                      .
;                                                                ATTACHMENT 4B (Continued) i                                                              1984 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR        . POST-REPAIR TYPE EQUIPMENT / VALVES          LEAKAGE /DATE        LEAKAGE /DATE PENETRATION NO.                TEST      TESTED                  (SCF/ hour)'          (SCF/ hour)      REPAIR / NOTES i
X-37A TIP                      C  IC51*SOV801A (OPC)                    -                  -
B  "O" Rings                    0.0/12-14-83          0.0/12-14-83 X-37B TIP                      C  IC51*SOV801B (OPC)                    -                  -
I B  "O" Rings                    0.0/12-14-83          0.0/12-14-83 X-37C TIP                        C  IC51*S0V801C (OPC)                    -                  -
B  "0" Rings                    0.0/12-14-83          0.0/12-14-83 i                                                                                                                                                        ,
i            X-37D TIP                        C  IC51*SOV801D (OPC)                    -                  -s                          -                '
B  "O" Rings                    0.0/12-14-83          0.0/12-14-83
{
X-38 TIP                        C  IC51*SOV028 (OPC)            0.215/3-7-84.        0.'04/3-12-84    MWR84-1613 - Tightened IC51*01V-0867 (OPC)          0.614/3-7-84'      0.614/3-12-84      panel connection.
B  "0" Rings                    7.16/12-14-83                          MWR83-3030, 3717,                  '
,                                                                                3.33/3-7        0.0/4-17-84    1612, "0" Rings -
Machined flange and 4                                                                                                                      recut "0" Ring grooves.
    .      X-39A Instrument Air            C  IP50*01V-698A (IPC)          0.23/3-10-84          0.03/3-24-84    MWR83-8350, 84-1154, IP50*MOV106 (OPC)            0.51/3-10-84          0.22/3-24-84    MOV106 - Cleaned'and j                                                                                                                      inspected internals.
MWR84-1678, MOV106 -
]                                                                                                                      Adjusted packing.
X-39B Instrument Air            C  IP50*01V-698B (IPC)            0.0/3-26-84          0.0/3-26-84                                        :
j                                                1P50*MOV104 (OPC)              0.0/3-26-84          0.0/3-26 .                                  .;
j          X-40 Spare                      C                                0.0/11-13-83          0.0/11-13-83                                      .I l
3                                                                          Page 17 of 29
 
                          ._.-      ._-.            ..      . . _ .  -    --    .      -    . - . -  - --. ~ ~ _ - _          .~ -      - . _
i O                                                          O                                                            O
;                                                          ATTACHMENT 4B (Continued)
I
!                                                      1984 LOCAL LEAKAGE RATE TEST DATA
!                                                                              PRE-REPAIR    POST-REPAIR TYPE      EQUIPMENT / VALVES.              LEAKAGE /DATE      LEAKAGE /DATE PENETRATION No.          TEST          TESTED                          (SCF/ hour)      (SCF/ hour)                REPAIR / NOTES X-41 HPCI Vacuum          C        IE41*MOV049 (OPC)              1.02/10-14-83        0.05/2-17-84              Tested with X-13 i
Breaker I
MWR83-7245, MOV049 -
,                                                                                                                          Replaced packing.
;-                                                                                                                        MWR84-0018, 02V-0035 -
l                                                                                                                          Cleaned disc and seats (boundary valve).
X-42 RCIC Vacuum          C        IE51*MOV049 (OPC)              0.31/10-12-83      0.31/10-12-83                Tested with X-17 i          Breaker
    .X-43 RHR                  C                                                                                        Tested with XS-5 l    X-44A Cont. Atmos.        C        IT48*MOV033A.(OPC)              0.0/10-23-83        'O.0/10-23-83
!            Control                      IT48*MOV038A (OPC)              0.03/10-23-83      0.03/10-23-83 1
i    X-44B Drywell Floor        C        IT23*MOV031A (OPC)              > 72/3-17-84          0.0/4-23-84              MWR84-2321, MOV031A -
Seal Pressur-                                                                                                Cleaned torque switch ization                                                                                                      contacts.-
X-45A Cont. Atmos.        C        IT48*MOV033B (OPC)            10.26/10-25-83                                    R/R-T48-186 Control                      IT48*MOV038B'(OPC)              0.0/'3-25-83 4.0/12-20-83        0.12/2-14-84              MWR83-7072, MOV033B -
i                                                                      .0.50/12-20-83        0.23/2-14-84              Flushed valve and. reset    '
j                                                                                                                        clutch trippers.
X-45B Drywell Floor        C        IT23*MOV031B (OPC)            0.041/10-26-83      0.041/10-26-84                                          ,
Seal Pressur-                                                0.06/2-14-84        0.06/2-14-84 i        ization
)
l                                                                  .Page 18 of 29 4                                              l,                                                    .
 
4 O                                                O                                                      O                            .
ATTACHMENT 4B (Continued) i l                                                  1984 LOCAL LEAKAGE RATE TEST DATA l
l PRE-REPAIR      POST-REPAIR TYPE    EQUIPMENT / VALVES          LEAKAGE /DATE      ~ LEAKAGE /DATE PENETRATION NO.        TEST          TESTED                    (SCF/ hour)        (SCF/ hour)          REPAIR / NOTES '
X-46 Cont. Atmos.      C      IT48*MOV031A (IPC)              0.0/2-10-84        0.0/2-10-84 Control, DW            IT48*MOV035A (OPC)              0.05/2-10-84      0.05/2-10-84 Inerting              IT24*A0V001A (OPC)              0.07/2-10-84      0.07/2-10-84 1T24*A0V001B (OPC)              0.05/2-10-84      0.05/2-10-84                                                    ,
X-47 Cont. Atmos.      C      1T48*MOV031B (IPC)              0.0/3-22-84        0.0/3-22-84 1                Control                IT48*MOV035B (OPC)              0.0/3-22-84        0.0/3-22-84 i      XS-1 Spare              C                                      0.0/11-13-83        0.0/1-4-84        MWR83-7131, XS      -
Retapped and cleaned cap.
XS-2 Spare              C                                      0.0/11-13-83      0.0/11-13-84 t
XS-3 Spare              C                                      0.0/11-13-83      0.0/11-13-83 l
XS-4 Spare              C                                      0.0/11-13-83      0.0/11-13-83                                                    ,
l      XS-5 RHR                C      1E11*MOV055A (OPC)              >.72 /3-18                      -
MWR84-1877, MOV055A/
056A- Lapped seats.
IE11*MOV056A (OPC)                (Combined) 1E11*MOV055B (OPC)              0.0/3-18-84        0.0/3-18-84
:                                      IE11*MOVD16B (OPC)                (Combined)        (Combined) i                                      1E11*RV157A (OPC)              0.16/3-14-84      0.16/3-14-84 IE11*RV157B (OPC)              6.71/3-14-84        0.0/3-15-84          MWR84-1771,RV157B -
!                                      1E11*RV152A (OPC)                0.0/3-14-84        0.0/3-14-84          Replaced operator handle 1E11*RV152B (OPC).              0.0/3-14-84        0.0/3-14-84          packing.
,                                      IE11*01V-3144 (OPC)              0.0/3-17-84        0.0/3-17-84 1E11*01V-3145 (OPC)            0.10/3-18-84      0.10/3-18-84 i
XS-6 Supp. Pool        C      1G41*MOV034A (OPC)              0.0/10-17-83      0.0/10-17-84 j              Pump Down              1G41*MOV034B (OPC)          0.30/10-17-83      0.30/10-17-84 4
l d
l                                                                Page 19 of 29 i                                                p
 
                            . . . . - - - - -                -      -.  - _ - - - -          . - . . .  . . - . - . . - . . - -  . =.      -    . . . ,
l          O                                                                  o                                                                    o        ->
l                                                            ATTACHMENT 4B (Continued) i j                                                          1984 LOCAL LEAKAGE RATE TEST DATA                              -
PRE-REPAIR            POST-REPAIR TYPE                  EQUIPMENT / VALVES                LEAKAGE /DATE            LEAKAGE /DATE
!  PENETRATION NO. TEST                        TESTED                          (SCF/ hour)            (SCF/ hour)              ' REPAIR / NOTES 1                                                                                                                                                                l XS-7 Cont. Atmos. C                    IT48*MOV034B (OPC)                  0.0/10-21-83            0.0/10-21-83
:        Control                              IT48*MOV040B (OPC)                0.29/10-21-83            0.29/10-21-83 1
XS-8 Cont. Atmos. C                    IT48*MOV034A (OPC)                  0.0/10-20-83            0.0/10-20-83 4        Control                              IT48*MOV040A (OPC)                1.40/10-20-83            1.40/10-20-83 1
XS-11 Spare        C                                                          0.0/11-13-83            0.0/11-13-83                                        1 j
XS-12 Spare        C                                                          0.0/11-13-83            0.0/11-13-83 l
l    XS-13 Spare        C                                                          0.0/11-13-83            0.0/11-13-83 f    XS-14 Spare        C                                                          0.0/11-13-83            0.0/11-13-83
!    XS-15 Spare        C                                                          0.0/11-12-83            0.0/11-12 !
l    XS-16A Service Air  C                    IP50*02V-0603 (IPC)              0.41/10-21-83              0.41/10-21-83 j                                              IP50*02V-0601 (OPC)              0.72/10-21-83            0.72/10-21-83 i    XS-16B Rad. Mon. C                    ID11*MOV032A (IPC)                -0.0/10-25-83            0.0/10-25-83
!                                              ID11*MOV032B (OPC)                  0.0/10-25-83            0.0/10-25-83                                        ,
XS-16C Rad. Mon. C                    ID11*MOV033A (IPC)              0.05/10-25-83              0.05/10-25-83:
1D11*MOV033B (OPC)                  0.0/10-25-83            0.0/10-25-83 i
!    XS-17 Spare        C                                                        .0.0/11-12-83            0.0/11-12-83 j    XS-18 Spare        C                                                          0.0/11-12-83            0.0/11-12-83 i
l    XS-19 Spare        C                                                          0.0/11-12-83            0.0/11-12-83
;                                                                        Page 20 of 29
}                                                    . p..
 
                                                                                                                                                                                        ~ _ _ ,_
i O                                                                                      O                                                                        O                :
t i                                                                                                                                                                                                        .
j                                                                                                                                                                                                        t
]                                                                                        ATTACHMENT 4B (Continued)                                                                                      ;
l                                                                                    1984 LOCAL LEAKAGE RATE TEST DATA                                                                              -_ ,
i
]                                                                                                              PRE-REPAIR                      POST-REPAIR                                          :6
'                                              TYPE                                                          LEAKAGE /DATE                    LEAKAGE /DATE                                            <
      .                                                                EQUIPMENT / VALVES l        PENETRATION NO.                        TEST                          TESTED                            (SCF/ hour)                        (SCF/ hour)            REPAIR / NOTES                .
]                                                                                                                                                                                                      '
4      XS-20 Cont. Atmos.                        C                    IT48*MOV032A (IPC)                        .21/2-8-84                      0.21/2-8-84 Control                                            IT48*MOV037A (OPC)                    0.05/2-8-84                        0.05/2-8-84                                          !
l 3
XS-21 Cont. Atmos.                        C                    IT48*MOV032B (IPC)                    1.43/2-11-84                      1.43/2-11-84 Control                                            IT48*MOV037B (OPC)                    0.03/2-11-84                      0.03/2-11-84                                          .;
                                                                                                                                                                    ^
2.04/2-25-84                      2.04/2-25-84 1-                                                                                                            0.08/2-25-84                      0.08/2-25-84                                            i L
)
XS-22 DW Vent                              C                    IT46*A0V078A (IPC)                    0.51/12-7-83                      0.51/12-7-83 1T46*A0V078B (OPC)                    (combined)                        (combined)                                              !
l 1.53/12-20-84                  1.53/12-20-84                Retested A0V078A in the O.61/12-20-84                  0.61/12-20-84"              forward direction.
i        XS-23 Spare                              C                                                          > 72/1-14-84                        0.0/2-11-84            MWR84-0034, 0327, XS ;                                                                                                                                                                          Retorqued flange.
j'      XS-24 Spare                                C                                                        0.041/11-12-83                        0.0/2-6-84            MWR84-0335, XS                                                                                                                                                                            Replaced inside and            ,
outside flanges.
XS-25 Spare                              C                                                          0.0/11-12-83                    '0.0/11-12-83 i        XS-26 Spare                              C                                                          0.0/11-12-83                      0.0/11-12-83 l        XS-27 Spare                                                                                                          -                            -
Changed to instrument          !
i penetration.
                                                                                                              .0.0/11-12-83                      0.0/11-12-83
  ~
XS-28 Spare                              C I
i
:                                                                                                          Page 21 of 29 p.
1                                                                                          -            .        .          _ ,                .        -
                                                                                                                                                                                        -        1
 
l N            :
l
:u ATTACHMENT 4B (Continued)                                                                                                                  ,
i                                                                                                                            1984 LOCAL LEAKAGE RATE TEST DATA                                                                                                            ;
                                                                                                                                              -PRE-REPAIR                          POST-REPAIR j                                                                                                      TYPE    EQUIPMENT / VALVES            LEAKAGE /DATE                        LEAKAGE /DATE l                PENETRATION NO.                                                                      TEST        TESTED                    (SCF/ hour)                              (SCF/ hour)                            . REPAIR / NOTES XS-29 Spare                                                                                                                                -                                          -
Changed to instrument.                      '
,                                                                                                                                                                                                                                penetration.                              !
1 XS-30 Pass                                                                                C    IT48*SOV131 (OPC)              0.0/10-24-83                        0.05/2-11-84                                MWR84-0041, IT48*01V-                      i l                                                                                                              IT48*01V-0016B (OPC)          0.41/10-24-83                        0.22/2-11-84                                  3047B - Rewelded per,,
l                                                                                                                                                                                                                                E&DCR          L269A, j                                                                                                                                                                                                                                (vent valve).
!                                                                                                                                                                                                                                                                          4 F-10 Reactor Recir.                                                                      C    IB31*01V-0002A (IPC)          4.08/10-18-83                                                                      MWR83-6491, 01V-3209A -
l                                  Pump Seal                                                                    IB31*01V-1028A (OPC)          0.0/10-18-83                                                                      Added packing'and            .
I                                                                                                                                                                                                                                replaced extrusion ring, (test connection).                      jl l
!                                                                                                                                            2.90/11-29-83                                                                      MWR83-8145, 01V-0002A -                    :
: l.                                                                                                                                            0.03/11-29-83                                                                      Replaced valve.
)                                                                                                                                            10.20/1-26-84                          0.51/2-18-84                                MWR83-8144, 01V-1028A -                    '
:                                                                                                                                              6.13/1-26-84                          0.08/2-18-84                                Re'placed valve.                      -i t
;                                                                                                                                                                                                                                MWR84-0634, 01V-1028A'-                    .
j                                                                                                                                                                                                                                Lapped seat.and disc.
i 1                                                                                                                                                                                                                              .MWR84-0635, 01V-4015A j                                                                                                                                                                                                                                Adjusted packing,:(drain valve).
3                                                                                                                                                                                                                                MWR84-0636, 01V-0002A -
  !                                                                                                                                                                                                                          - Lapped seat.
l Page 22 of 29 L                                                                                                                  r                                                                                                                                        . _ . .
 
    =  .      _ - . - . . - - . - - . _ . _ - ~      _ _ - . . - - . - . . . . - . - .                      - - - . _ _ - .  ..    .  ,_    - - . . - .    . . . - .
l~
1 O                                                                                          O                                                              O          .
l ATTACHMENT 4B (Continued)                                                              !
t 1984 LOCAL LEAKAGE RATE TEST DATA                                                        .
i PRE-REPAIR        POST-REPAIR j                                                TYPE EQUIPMENT / VALVES                                LEAKAGE /DATE      LEAKAGE /DATE' i
PENETRATION NO.                            TEST              TESTED                                (SCF/ hour)          (SCF/ hour)              REPAIR / NOTES
!      F-11 Reactor Recir.                        C    IB31*01V-0002B (IPC)                            12.285/10-19-83                                  MWR83-8143, 01V-1028B -
l          Pump Seal                                  IB31*01V-1028B (OPC)                              > 72/10-19-83                                  Replaced valve.          <
4
;                                                                                                                                                        MWR83-8146, 01V-00028 -
j                                                                                                                                                        Replaced valve.
8.15/2-13-84        0.82/3-28-84              MWR84-1013, 01V-0002B -
1                                                                                                          6.11/2-13-84          0.0/3-28-84            Lapped seat and disc.
,                                                                                                                                                        MWR84-1014. 01V-1028B -
Lapped seat and disc.
i l      B-3 Pass                                    C    IT48*SOV128A (OPC)                                0.0/10-22-83        0.0/10-22-83 IT48*SOV128B (OPC)                                0.04/10-22-83      0.04/10-22-83 0
I      B-7 Inst. Air                              C    IP50*02V-695B (IPC)                              12.30/12-16-83          0.0/1-27-84            MWR83-8278, to Drywell                                  IP50*MOV103A (OPC)                                > 72/12-16-83        0.13/1-27-84              IP50*01V-3029B -
i                                                                                                                                                        Adjusted packing, (test connection).
i      C-2 Pass                                                                                            0.04/12-6-83 C    IB21*SOV313A (OPC)                                                    _0.04/12-6-83 IB21*SOV3138 (OPC)                                0.04/12-6-83        0.04/12-6-83 D-5 Inst. Air                              C    IP50*02V-0695A (IPC)                              0.05/10-22-83      0.05/10-22-83 i          to Drywell                                  IP50*MOV103B (OPC)                                  0.0/10-22-83        0.0/10-22-83                                      i L
i l
l 1
:                                                                                                  Page 23 of 29 i
i                                                                          f
 
l O                                                                                                  O                                                                O
)                                                                                                ATTACHMENT 4B (Continued) i
!                                                                                            1984 LOCAL LEAKAGE RATE TEST DATA i
!                                                                                                                                    PRE-REPAIR        POST-REPAIR
.                                                          TYPE    EQUIPMENT / VALVES                                          LEAKAGE /DATE        . LEAKAGE /DATE
: j.                    PENETRATION NO.                      TEST            TESTED                                                  (SCF/ hour)          (SCF/ hour)      REPAIR / NOTES I                                                                                                                                                                                                              '
!                  J-2 Pass                                  C    IT48*01V-0016A (OPC)                                          0.34/10-24-83        0.34/10-24-83 l                                                                    IT48*SOV130 (OPC)                                            0.41/10-24-83        0.41/10-24-83 i
I J-10 Pass                                C    IT48*SOV126A-(OPC)                                              0.0/10-24-83        0.0/10-24-83 IT48*SOV126B (OPC)                                              0.0/10-24-83        0.0/10-24-83 l                    SP-N Pass                                C    IT48*SOV129A (OPC)                                          0.04/10-23-83        0.04/10-23-83 i                                                                    1T48*SOV129B.(OPC)                                          0.07/10-23-83        0.07/10-23-83 J
l                    SP-SE Pass                              C    IT48*SOV127A (OPC)                                              0.0/10-24-83        0.0/10-24-83
)                                                                    IT48*SOV127B (OPC)                                              0.0/10-24-83        0.0/10-24-83 I
a 1
e d
j l
l i                                                                                                                                                                                                          -;
l
!                                                                                                                    Page 24 of 29                                                                            ,
1 l'              _
 
O                                              O                                            O ATTACHMENT 48-(Continued) 1984 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR      POST-REPAIR.
TYPE  EQUIPMENT / VALVES          LEAKAGE /DATE    LEAKAGE /DATE PENETRATION NO. TEST      TESTED                    (SCF/ hour)      (SCF/ hour)  REPAIR / NOTES IT23-Z-WAl Spare    B    Epoxy Seal                  0.0/11-16-83      0.0/11-16-83 IT23-Z-WA2          B    Welded Seal                  0.0/11-16-83      0.0/11-1F,-83 IT23-Z-WA3          B    Welded Seal                  0.0/11-16-83      0.0/11-16-83 IT23-Z-WB1          B    Epoxy Seal                  0.0/11-17-83      0.0/11-17-83 IT23-Z-WB2          B    Epoxy Seal                  0.0/11-17-83      0.0/11-17-83 IT23-Z-WB3          B    Epoxy Seal                  0.0/11-17-83      0.0/11-17-83 IT23-Z-WB4'          B    Epoxy Seal                  0.0/11-18-83      0.0/11-18-83                  ,
IT23-Z-WB5          B    Epoxy Seal                  0.0/11-18-83      0.0/11-18-83 IT23-2-WB6          B    Epoxy Seal                  0.0/11-18-83      0.0/11-18-83 IT23-Z-WC1          .B    Epoxy Seal                  0.0/11-18-83      0.0/11-18-83                -
IT23-Z-WC2 Spare    B    Epoxy Seal                  0.0/11-18-83      0.0/11-18-83 IT23-Z-WC3 Spare    B    Epoxy Seal                  0.0/11-18-83      0.0/11-18-83 IT23-Z-WC4          B    Epoxy' Seal                  0.0/11-17-83      0.0/11-17-83 IT23-Z-WC5      .B        Epoxy Seal                  0.0/11-18-83      0.0/11-18-83 IT23-Z-WC6          B  . Epoxy Seal                  0.0/11-18-83      0.0/11-18-83
.1T23-Z-WD1          B  . Epoxy Seal                  0.0/11-17-83      0.0/11-17-83 Page:25 of 29 f                        _
 
                                                                                                                                                                . _ _ - - - _ _ _ _ _ . _ _ _ . . _ _ _ _ _ ~ _ . -
l                          O                                                                                                        O                                                                  O l
;                                                                                                                      ATTACHMENT 4B (Continued)                                                                        ,
l l                                                                                                                  1984 LOCAL LEAKAGE RATE TEST DATA i
?                                                                                                                                                                                                                        ,
PRE-REPAIR      POST-REPAIR TYPE                      EQUIPMENT / VALVES            LEAKAGE /DATE    LEAKAGE /DATE l                  PENETRATION NO.                                          TEST                          TESTED                    (SCF/ hour)      (SCF/hcur)                    REPAIR / NOTES I
l                  IT23-Z-WD2                                                    B                    Epoxy Seal                    0.0/11-17-83    0.0/11-17-83                                                    -
i j                  IT23-Z-WD3                                                  B                    Epoxy Seal                    0.0/11-17-83    0.0/11-17-83 i
}                  IT23-Z-WD4                                                    B                    Epoxy Seal                    0.0/11-18-83    0.0/11-17-83
                                                                                                                                                                                                                      'f IT23-Z-WD5                                                    B                    Epoxy Seal                    0.0/11-18-83    0.0/11-18-83
: j.                                                                                                                                                                                          '
j                  IT23-Z-WD6 Spare                                              B                    Epoxy Seal                    0.0/11-18-83    0.0/11-18-83
}-                                                                                                                                                                                                                    Ei
]                '1T23-Z-EA1                                                    B                    Epoxy Seal                    0.0/11-20-83    0.0/11-20-83 i
1.
1                  IT23-Z-EA2                                                    B                    Epoxy Seal                    0.0/11-20-83      0.0/11-20-83.                  MWR84-6695, EA2.-
: j.                                                                                                                                                                                    Replaced fittings.
i                  IT23-Z-EA3                                                    B                    Epoxy Seal                    0.0/11-20-83      0.0/11-20-83 i
i                  IT23-Z-EB1                                                  B                    Epoxy Seal                    0.0/11-20-83    _0.0/11-20-83 1
IT23-Z-EB2                                                    B                    Welded Seal                    0.0/11-20-83      0.0/11-20-83                                                    i
;                  IT23-Z-EB3                                                    B                    Epoxy Seal
* 0.0/11-20-83      0.0/11-20-83 4
3                                                                                                                                                            -
;                IT23-Z-EB4 Spare                                              B                    Epoxy Seal                    0.0/11-19-83      0.0/11-19-83 i
f                  IT23-Z-EB5                                                    B                    Epoxy Seal                    0.0/11-20-83      0.0/11-20-83 i
{-                IT23-Z-EB6                                                    B                    Epoxy Seal                    0.0/11-20-83      0.0/11-20-83                                                .
i-IT23-Z-EC1 Spare                                              B                    Epoxy Seal                    0.0/11-19-83      0.0/11-19-83                                  .
1T23-Z-EC2 Spare                                              B                  . Epoxy Seal-                  0.0/11-19-83      0.0/11-19-83 i                                                                                                                                                                    .
Page 26 of 29                                                    -
f 1                                                              ..
r          __                                    .            _
 
_._._______.-___.____.._._._.__.___-.-__..4-_.__._                                                                      _ _ _
                                                                                                                  ~
l i
1 O                                                                          O                                                        O ATTACHMENT 4B (Continued) 1984 LOCAL LEAKAGE RATE TEST DATA 1                                                                                                                                .
1                                                                                                  PRE-REPAIR      POST-REPAIR                                        ;
]                            TYPE  EQUIPMENT / VALVES                                          LEAKAGE /DATE      LEAKAGE /DATE PENETRATION NO. TEST                TESTED                                            (SCF/ hour)-    (SCF/ hour)          REPAIR / NOTES I
IT23-Z-EC3,        B    Epoxy Seal                                                  0.0/11-19-83        0.0/11-19-83 j        IT23-Z-EC4 Spare    B    Epoxy Seal                                                  0.0/11-19-83        0.0/11-19-83 IT23-Z-ECS          B    Epoxy Seal                                                  0.0/11-20-83        0.0/11-20-83
{        IT23-Z-EC6          B    Epoxy Seal                                                  0.0/11-20-83        0.0/11-20-83
.        1T23-Z-EDI Spare    B    Epoxy Seal                                                  0.0/11-19-83        0.0/11-19-83 IT23-Z-ED2 Spare  .B    Epoxy Seal                                                  0.0/11-19-83        0.0/11-19-83 l
i
!        IT23-Z-ED3 Spare    B    Epoxy Seal                                                  0.0/11-19-83        0.0/11-19-83                                    -i 0
IT23-Z-ED4 Spare    B    Epoxy Seal                                                  0.0/11-19-83        0.0/11-19-83                                          ;
IT23-Z-ED5          B    Epoxy Seal                                                  0.0/11-20-83        0.0/11-20-83                                      .
I f        IT23-Z-ED6          B    Epoxy Seal                                                  0.0/11-20-83        0.0/11-20-83                                          ,
i i        Supp. Pool          B    Resilient Seal and                                          0.0/11-22-83        0.0/11-22-83 Level A                  Single Drn. Valve
                                                                                                                          ~
i i
l l                                -
)
i
!                                                                                        Page 27 of 29 g.
 
O                                                        O                                            O ATTACHMENT 4B (Continued) 1984 LOCAL LEAKAGE RATE TEST DATA PRE-REPAIR      POST-REPAIR TYPE EQUIPMENT / VALVES            LEAKAGE /DATE    LEAKAGE /DATE PENETRATION NO.              TEST      TESTED                    (SCF/ hour)      (SCF/ hour)  REPAIR / NOTES            -
Supp. Pool                    B  Resilient Seal and            0.33/11-23-83                  MWR83-7551,    01V-8001B -
Leval B                            Single Drn. Valve              4.0/1-17-84    1.33/3-25-84  Replaced packing.
MWR83-7552, 01V-7034B -
Replaced packing.
MWR84-0637, 01V-8001B -
Cleaned and inspected
                                                              ,                                internals.
MWR84-1296, 01V-8001B -
Replaced valve.
1T48*PNL-068A                  B  "0" Rings                          -                -
IT48*PNL-068B                  B  "0" Rings                          -                -
IT48*PNL-069A                  B  "O" Rings                          -                -                    .
1T48*PNL-069B                  B  "O" Rings                          -                -
Page'28 of 29 f
 
    . - . - - - . ~ - . . - - . . . - .        _ _ . -      - . _ . . _ .            ~ . - - -
4 i                                                                                                                                                          .
l                                                                              ATTACHMENT 45 (Continued) l                                                                          1984 LOCAL LEAKAGE RATE TEST DATA L                                                                                                                                                .    -
t                                                                                                . PRE-REPAIR  POST-REPAIR
!                                              TYPE      EQUIPMENT / VALVES                    LEAKAGE /DATE  LEAKAGE /DATE                                    '
j              PENETRATION NO.                  TEST            TESTED                            (SCF/ hour)  (SCF/ hour)    REPAIR / NOTES' i
!              Parsonnel Airlock                  B      "O" Rings and Gaskets                > 72/2-15-84                  WR84-0856 - Cleaned f                                                                                                > 72/3-6-84                . door-joint pins and dogs.
I
!              Emergency Airlock                  B      "O" Rings and Gaskets                    2.65/3-3-84  2.65/3-3-84 Equipment Hatch                    B      "O" Rings                                0.0/3-3-84  0.0/3-3-84
,,            Control Rod                        B      "O" Rings                            0.0/10-13-83  0.0/10-13-84
,            Removal Hatch Supp.-Pool                        B      "O" Rings                              0.0/1-20-84  0.0/1-20-84 Access Hatch - SE 1              Supp. Pool                        B      "O" Rings                            0.29/1-20-84  0.29/1-20-84                                    "
j              Access Hatch - NW l
l              Drywell Head                      B      "O" Rings                                    -            -
I j              Hydrogen Recombiner                      ,
Tested under Leakage' l                                      Loop A                                                                                Reduction Program.
* j              Hydrogen Recombiner                                                                    -            -
Tested under Leakage l                                      Loop B                                                                                Reduction Program.
}
l                                                                                                -
1 l'
Page 29 of 29 l'                                                                    -          .-
 
ATTACHMENT 4C                                              -l l                                LEAKAGE PENALTIES'ADDED TO TYPE A LEAKAGE O                                        .
Penetration leakage to be added since tihe.se penetrations were isolated or could not be vented and drained during the Type A Test.                        The leakage assigned is the recorded value for minimum pathway analysis.
Leakage
: i. Type B Penalties                Description                  (SCF/ hour)          Remarks IT48*PNL-068A                    "0" Rings                      0.24            See Note 1 IT48*PNL-068B                    "0" Rings                      0.82            See Note 1
,          IT48*PNL-069A                    "0" Rings                    14.40            _See Note,1 1T48*PNL-0698                    "O" Rings                      9.44            See Note 1
;          Electrical                      Epoxy Seals                    0.0              See Note 2 4
Penetrations Total Type B Leakage 24.90 SCFH i                                        Total Type B Leakage 0.044019 percent / day l                                                                        Leakage
;    ii. Type C Penalties                Description                  (SCF/ hour)          Remarks X-2A                      Feedwater                        0.036            See Note 3 i              X-2B                        Feedwater                      2.57            See Note 3 X-4                        Reactor Water                    0.10            See Note 3 i                                        Cleanup X-30                      Reactor Recire.                  0.07            See Note 3 l                                          Sample i
F-10                      Reactor Recire.                  0.031            See Note 3 Pump Seal F-11                      Reactor Recire.                  0.0              See Note 3 i                                          Pump Seal 4!                                                                                                        .,
Total Type C Leakage 2.807 SCFH Total Type C Leakage 0.004962 percent / day i
?i j                                                                            Leakage 111. H-2Recombiner Penalties                Description                (SCF/ hour)      Remarks l          Hydrogen Recombiner                  Atmos. Cont.                  10.33        See Note 4 i          Loop A                                System
{          Hydrogen Recombiner                  Atmos. Cont.                  4.30        See Note 4 j          Loop B                                System i                                          Total H Recombiner Leakage 14.63 SCFH
!                                          Total H Recombiner Leakage 0.025863 percent / day Page 1 of 3 i
L
 
ATTACHMENT 4C (Continued)
LEAKAGE PENALTIES ADDED TO TYPE A LEAKAGE O
Leakage
  .iv. Instrument Penalties      Description            (SCF/ hour)      Remarks-1Z93*LT012A              Supp. Pool Level          3.80        See Note 1 1Z93*LT012B              Supp. Pool Level          1.20        See Note.1 IT49-Manometer          IT49 Test                  0.0-        See Note 1 Manifold                  Instrumentation            0.0
      -1821*LT-155A            Rx Level                              See Note 1.
(As-Left)
Total Instrument Leakage 5.0 SCFH Total Instrument Leakage 0.008839 percent / day IB21*LT-155A                                        0.05 (As-Found)
Leakage-
: v. Flowmater Correction      Description            (SCF/ hour)    Remarks Correction for            Local Leakage              2.37 Flowmeter                Rate Test Inaccuracies - 5% of O      Total. Type A Penalties Instrumentation Total Flowmeter Correction 2.37 SCFH Total Flowmeter Correction 0.004190 percent / day Leakage vi. Water Level Corrections          Description      (SCF/ hour)    Remarks Supp. Pool          0.0                        ._
Rx Vessel          0.0 D.W. Equip. Sump    0.0 D.W. Floor Sump    0.0 Total Water Level Correction 0.0 SCFH Total Water Level Correction 0.0 percent / day Page 2 of 3
 
          - . ~ . . . .    .                                      -      , -.        -
ATTACHMENT 4C (Continued)
LEAKAGE PENALTIES ADDED TO TYPE A LEAKAGE Leakage                  ,
vii. Total Corrections          Description            (SCF/ hour)        Remarks Total Type A              Penalties &              49.707 Corrections              Corrections (i. through vi.)
Total Type A Correction 49.707 SCFH Total Type A Correction 0.087873 percent / day NOTES:
: 1. Isolated during Type A Test.
: 2. Not vented during Type A Test.
: 3. Water filled during Type A Test.
: 4. Added under Leakage Reduction Program.
O O
Page 3 of 3 A}}

Revision as of 03:56, 4 December 2024

Reactor Containment Bldg Integrated Leakage Rate Test,Types A,B & C Periodic Test
ML20212Q950
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 01/31/1987
From:
STONE & WEBSTER ENGINEERING CORP.
To:
Shared Package
ML20212Q936 List:
References
NUDOCS 8704240158
Download: ML20212Q950 (104)


Text