ML20213E582: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:- . .                                                                                                -.
{{#Wiki_filter:-..
t August 31, 1983 DISTRIBUTION                                                             '
t August 31, 1983 DISTRIBUTION ading DHFS R/F Docket No. 50-397 HBClayton GRMazetis WOLong MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing Division of Licensing FROM:
ading DHFS R/F Docket No. 50-397                                                                                                                 HBClayton GRMazetis
Dennis L. Ziemann, Acting Deputy Director Division of Human Factors Safety
* WOLong
.            MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing                                                                                                                                                       -
Division of Licensing FROM:                     Dennis L. Ziemann, Acting Deputy Director Division of Human Factors Safety                                                                                                                                       .


==SUBJECT:==
==SUBJECT:==
WNP-2 DELAYS IN PREOPERATIONAL AND ACCEPTANCE TESTS                                                                                                                   -
WNP-2 DELAYS IN PREOPERATIONAL AND ACCEPTANCE TESTS In a letter from G. C. Sorensen (WPPSS) to A. Schwencer (NRR/LB-2) dated July 26,1933, WPPSS identified preoperational and acceptance tests to be deferred until after fuel load and provided a schedule'for each test.
In a letter from G. C. Sorensen (WPPSS) to A. Schwencer (NRR/LB-2) dated                                                                                                                       .
Based on the absence of a significant source term (decay heat or radiation) prior to power operation, the tests may be safely delayed provided that they are completed prior to entry into reactor operational condition #2 (Startup).
July 26,1933, WPPSS identified preoperational and acceptance tests to be deferred until after fuel load and provided a schedule'for each test.
Since WPPSS did not indicate what wde the plant will be in on a given date, we cannot evaluate the acceptability of the proposed schedule.
Based on the absence of a significant source term (decay heat or radiation) prior to power operation, the tests may be safely delayed provided that they are completed prior to entry into reactor operational condition #2 (Startup). Since WPPSS did not indicate what wde the plant will be in on a given date, we cannot evaluate the acceptability of the proposed schedule.
We suggest that the delays be approved subject to the condition that the delayed tests must be completed prior to entry into operational condition 2.
We suggest that the delays be approved subject to the condition that the delayed tests must be completed prior to entry into operational condition 2.                                                                                                                    .
It should be noted that delaying some of these tests until after fuel loading will require exceptions to Technical Specifications.
It should be noted that delaying some of these tests until after fuel loading will require exceptions to Technical Specifications.
PleasecontactW.Long(X24579)oftheProceduresandSystemsReviewBranch, if further discussion is required.                                                     _                  ..,
PleasecontactW.Long(X24579)oftheProceduresandSystemsReviewBranch, if further discussion is required.
      -                                                                          Drich.D.1Sigr.edb7%
Drich.D.1Sigr.edb7%
Ec.nis L. Eic1M j                                                                                                         ,,
Ec.nis L. Eic1M j Dennis L. Ziemann, Acting Deputy Director Division.of Human Factors Safety cc:
Dennis L. Ziemann, Acting Deputy Director Division.of Human Factors Safety cc:   A. Schwencer R. Auluck                                                                                                                                                                                 ,
A. Schwencer R. Auluck R. Dodds, Region V R. Gruel, PNL i
R. Dodds, Region V i
44
R. Gruel, PNL                                                                                                                                                                             ,
^w G309090012 830031 GE.
44                   ^w                                                                                                                                                   !
ADOCK 05000397 4[
G309090012 830031                               ;
w
GE.
~
ADOCK '      05000397 w                      4[
vd k
                  ~
IHM,;pSRB,,,,,,,QHhgSRB,,,
vd             '
0,(ifs 1P. SRB,f,DHFSM,/ DD,,,
k                                                                                                                                                                           !
: omer, sumor >.Watong:ah......Gatt& t.1 s......HB.c.1w. tan....0Lz.iemann....
omer, IHM,;pSRB,,,,, ,,QHhgSRB,,,
om) 8/.ht;/83......... 8/.3.9/.83..........fl.).U.83.....
                      ,                                      0,(ifs 1P. SRB,f,DHFSM,/ DD ,,,             , , , , , , , , , , , , , ,      , , , , , , , , , , , ,            , , . . . . . . . . . . . . .
T/ $/ 83........
sumor > .Watong:ah.... ..Gatt& t.1 s.... ..HB.c.1w. tan... .0Lz.iemann... .                        ..................                . . . . . . . . . . . . . . . . .    ...................
.~.-~~~l
om) 8/.ht;/83........ . 8/.3.9/.83..........fl.).U.83.... . T/ $/ 83.. ......                   . . . . . . . . . . . . . . . . .  . . . . . . ~ . . . . . . .    ..
...... ~.......
                                                                                                                                                                                      .~.-~~~l mc rosu m oo.aon.ncu om                                   OFFICIAL RECORD COPY                                                                                               wo w-m-m l
mc rosu m oo.aon.ncu om OFFICIAL RECORD COPY wo w-m-m l
                                                                                                                                              .. . .. _ . - - _ _ - - __ _.}}
.}}

Latest revision as of 03:20, 4 December 2024

Suggests That Applicant 830726 Requests for Deferral of Preoperational & Acceptance Tests Until After Fuel Load Be Approved,Subj to Condition That Delayed Tests Be Completed Prior to Entry Into Operational Condition 2
ML20213E582
Person / Time
Site: Columbia 
Issue date: 08/31/1983
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
References
CON-WNP-0646, CON-WNP-646 NUDOCS 8309090012
Download: ML20213E582 (1)


Text

-..

t August 31, 1983 DISTRIBUTION ading DHFS R/F Docket No. 50-397 HBClayton GRMazetis WOLong MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing Division of Licensing FROM:

Dennis L. Ziemann, Acting Deputy Director Division of Human Factors Safety

SUBJECT:

WNP-2 DELAYS IN PREOPERATIONAL AND ACCEPTANCE TESTS In a letter from G. C. Sorensen (WPPSS) to A. Schwencer (NRR/LB-2) dated July 26,1933, WPPSS identified preoperational and acceptance tests to be deferred until after fuel load and provided a schedule'for each test.

Based on the absence of a significant source term (decay heat or radiation) prior to power operation, the tests may be safely delayed provided that they are completed prior to entry into reactor operational condition #2 (Startup).

Since WPPSS did not indicate what wde the plant will be in on a given date, we cannot evaluate the acceptability of the proposed schedule.

We suggest that the delays be approved subject to the condition that the delayed tests must be completed prior to entry into operational condition 2.

It should be noted that delaying some of these tests until after fuel loading will require exceptions to Technical Specifications.

PleasecontactW.Long(X24579)oftheProceduresandSystemsReviewBranch, if further discussion is required.

Drich.D.1Sigr.edb7%

Ec.nis L. Eic1M j Dennis L. Ziemann, Acting Deputy Director Division.of Human Factors Safety cc:

A. Schwencer R. Auluck R. Dodds, Region V R. Gruel, PNL i

44

^w G309090012 830031 GE.

ADOCK 05000397 4[

w

~

vd k

IHM,;pSRB,,,,,,,QHhgSRB,,,

0,(ifs 1P. SRB,f,DHFSM,/ DD,,,

omer, sumor >.Watong:ah......Gatt& t.1 s......HB.c.1w. tan....0Lz.iemann....

om) 8/.ht;/83......... 8/.3.9/.83..........fl.).U.83.....

T/ $/ 83........

.~.-~~~l

...... ~.......

mc rosu m oo.aon.ncu om OFFICIAL RECORD COPY wo w-m-m l

.