ML20214L990: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:A
  '
'
                                                                                    A
.
    Docket No. 50-409
Docket No. 50-409
    Dairyland Power Cooperative
Dairyland Power Cooperative
    ATTN:   Mr. J. W. Taylor
ATTN:
            General Manager
Mr. J. W. Taylor
    2615 East Avenue - South
General Manager
    La Crosse, WI 54601
2615 East Avenue - South
    Gentlemen:
La Crosse, WI 54601
    This refers to the routine inspection co.iducted by Mr. Norman Williamsen
Gentlemen:
    and others of this office on August 4-8 and 14, 1986, of activities at
This refers to the routine inspection co.iducted by Mr. Norman Williamsen
    La Crosse Boiling Water Reactor authorized by NRC Operating License DPR-45
and others of this office on August 4-8 and 14, 1986, of activities at
    and to the discussion of our findings with Mr. J. Parkyn and others of your
La Crosse Boiling Water Reactor authorized by NRC Operating License DPR-45
    staff at the conclusion of the inspection.
and to the discussion of our findings with Mr. J. Parkyn and others of your
    The enclosed copy of our inspection report identifies areas examined during
staff at the conclusion of the inspection.
    the inspection. Within these areas, the inspection consisted of a selective
The enclosed copy of our inspection report identifies areas examined during
    examination of procedures and representative records, observations, and
the inspection.
    interviews with personnel.
Within these areas, the inspection consisted of a selective
    During this inspection, certain of your activities appeared to be in violation
examination of procedures and representative records, observations, and
    of NRC requirements, as specified in the enclosed Notice.     A written response
interviews with personnel.
    is required.
During this inspection, certain of your activities appeared to be in violation
    In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
of NRC requirements, as specified in the enclosed Notice.
    this letter, the enclosures, and your response to this letter will be placed
A written response
    in the NRC Public Document Room.
is required.
    The responses directed by this letter and the accompanying Notice are not
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
    suoject to the clearance procedures of the Office of Management and Budget
this letter, the enclosures, and your response to this letter will be placed
    as required by the Paperwork Reduction Act of 1980, PL 96-511.
in the NRC Public Document Room.
    We will gladly discuss any questions you have concerning this inspection.
The responses directed by this letter and the accompanying Notice are not
                                              Sincerely,
suoject to the clearance procedures of the Office of Management and Budget
    8609100492 860826
as required by the Paperwork Reduction Act of 1980, PL 96-511.
            ADOCK 0500       9               W. D. Shafer, Chief
We will gladly discuss any questions you have concerning this inspection.
    $DR
Sincerely,
                                              Emergency Preparedness and
8609100492 860826
                                                Radiological Protection Branch
ADOCK 0500
    Enclosures:
9
    1.   Notice of Violation
$DR
    2.   Inspection Report
W. D. Shafer, Chief
          No. 50-409/86008(DRSS)
Emergency Preparedness and
    See Attached Distribution                                 y               j
Radiological Protection Branch
                                                                          /, A)
Enclosures:
                                    RIII
1.
                                                        }                       '
Notice of Violation
                                                                                  (
2.
    RIII   $                                         RI
Inspection Report
    WGS    F        vRIIb
No. 50-409/86008(DRSS)
                      a              .
See Attached Distribution
                                                    I L\
y
    Willi 5msen/is Snell           Bd
j
                                                    %WJ r
/, A)
    pr              Bl &
}
                      y es
(
RIII
RI
RIII
$
RIIb
.
I L\\
'
WGS F
va
Willi 5msen/is Snell
Bd
%WJ r
Bl &
pr
es
y


T
'
.
.
  '
Dairyland Power Cooperative
                                                  T
2
    Dairyland Power Cooperative     2 AUG 2'61986
AUG 2'61986
    Distribution
Distribution
    cc w/ enclosure:
cc w/ enclosure:
    J. Parkyn, Plant Superintendent
J. Parkyn, Plant Superintendent
    DCS/RSB (RIDS)
DCS/RSB (RIDS)
    Licensing Fee Management Branch
Licensing Fee Management Branch
    Resident Inspector, RIII
Resident Inspector, RIII
    John Stang, NRR
John Stang, NRR
    John J. Duffy, Chief
John J. Duffy, Chief
      Boiler Section
Boiler Section
    Mary Lou Munts, Chairperson
Mary Lou Munts, Chairperson
      Wisconsin Public Service
Wisconsin Public Service
      Comission
Comission
    Spark Burmaster, Coulee
Spark Burmaster, Coulee
      Region Energy Coalition
Region Energy Coalition
    W. Weaver, FEMA, R-V
W. Weaver, FEMA, R-V
    D. Matthews, 01E, EPB
D. Matthews, 01E, EPB
}}
}}

Latest revision as of 01:33, 4 December 2024

Forwards Insp Rept 50-409/86-08 on 860804-08 & 14 & Notice of Violation
ML20214L990
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 08/26/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Taylor J
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20214L992 List:
References
NUDOCS 8609100492
Download: ML20214L990 (2)


See also: IR 05000409/1986008

Text

A

'

.

Docket No. 50-409

Dairyland Power Cooperative

ATTN:

Mr. J. W. Taylor

General Manager

2615 East Avenue - South

La Crosse, WI 54601

Gentlemen:

This refers to the routine inspection co.iducted by Mr. Norman Williamsen

and others of this office on August 4-8 and 14, 1986, of activities at

La Crosse Boiling Water Reactor authorized by NRC Operating License DPR-45

and to the discussion of our findings with Mr. J. Parkyn and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice.

A written response

is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

suoject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

8609100492 860826

ADOCK 0500

9

$DR

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-409/86008(DRSS)

See Attached Distribution

y

j

/, A)

}

(

RIII

RI

RIII

$

RIIb

.

I L\\

'

WGS F

va

Willi 5msen/is Snell

Bd

%WJ r

Bl &

pr

es

y

T

'

.

Dairyland Power Cooperative

2

AUG 2'61986

Distribution

cc w/ enclosure:

J. Parkyn, Plant Superintendent

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

John Stang, NRR

John J. Duffy, Chief

Boiler Section

Mary Lou Munts, Chairperson

Wisconsin Public Service

Comission

Spark Burmaster, Coulee

Region Energy Coalition

W. Weaver, FEMA, R-V

D. Matthews, 01E, EPB