TXX-6107, Interim Deficiency Rept CP-86-55 Re Seismic Air Gap Design Adequacy Between Auxiliary & Containment Bldgs.Initially Reported on 860814.Present Air Gap Width Acceptable.Review & Evaluation Continuing.Next Rept to Be Submitted by 870313: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
Log # TXX-6107 File 0 10110 903.7 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER . 400 NORTH OLIVE STREET. LB. 81. DALLAS. TEXAS 75301 November 21, 1986 E.M".hff.00h Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
Log # TXX-6107 File 0 10110 903.7 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OLIVE STREET. LB. 81. DALLAS. TEXAS 75301 November 21, 1986 E.M".hff.00h Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011


==SUBJECT:==
==SUBJECT:==
Line 24: Line 24:


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
 
On August 14, 1986, we verbally notified your Mr. I.~Barnes of a eficiency involving the seismic air gap design adequacy between the Auxiliary Building and Units 1 and 2 Containment Buildings.
On August 14, 1986, we verbally notified your Mr. I.~Barnes of a eficiency involving the seismic air gap design adequacy between the Auxiliary Building and Units 1 and 2 Containment Buildings. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). Our last interim report was logged TXX-5011, dated September 12, 1986.
This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). Our last interim report was logged TXX-5011, dated September 12, 1986.
The specific deficiency involved recent calculations which indicated that a separation gap dimension should be greater than the existing design dimension durir.g extreme high temperature conditions. Using more realistic data, this calculation was refined to demonstrate that the present gap is acceptable.
The specific deficiency involved recent calculations which indicated that a separation gap dimension should be greater than the existing design dimension durir.g extreme high temperature conditions. Using more realistic data, this calculation was refined to demonstrate that the present gap is acceptable.
Review and evaluation of the refined calculations are scheduled for completion by February 20, 1987.
Review and evaluation of the refined calculations are scheduled for completion by February 20, 1987.
We anticipate submitting our next report no later than March 13,-1987.
We anticipate submitting our next report no later than March 13,-1987.
Very truly yours, Wb W. ' G'."Counsil           -
Very truly yours, Wb W. ' G'."Counsil JCH/mlh
                                                          ~
~
JCH/mlh c - NRC Region IV (0 + 1 copy)
c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8612030541 861121
U. S. Nuclear Regulatory Commission Washington, D.C.
{DR ADOCK 05000445 PDR c
20555 8612030541 861121
{DR ADOCK 05000445 PDR
$A c
y/
y/
A ,,,   .,.. ,.. - ,L.T, _ n., ~ , -
A,,,
                                                                                                      $A m                   -
.,..,.. -,L.T, _ n., ~, -
                                                                                                                ;}}
m
;}}

Latest revision as of 01:24, 4 December 2024

Interim Deficiency Rept CP-86-55 Re Seismic Air Gap Design Adequacy Between Auxiliary & Containment Bldgs.Initially Reported on 860814.Present Air Gap Width Acceptable.Review & Evaluation Continuing.Next Rept to Be Submitted by 870313
ML20214N107
Person / Time
Site: Comanche Peak  
Issue date: 11/21/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-55, TXX-6107, NUDOCS 8612030541
Download: ML20214N107 (1)


Text

-

Log # TXX-6107 File 0 10110 903.7 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OLIVE STREET. LB. 81. DALLAS. TEXAS 75301 November 21, 1986 E.M".hff.00h Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 SEISMIC AIR GAP DESIGN ADEQUACY SDAR: CP-86-55 (INTERIM REPORT)

Dear Mr. Johnson:

On August 14, 1986, we verbally notified your Mr. I.~Barnes of a eficiency involving the seismic air gap design adequacy between the Auxiliary Building and Units 1 and 2 Containment Buildings.

This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). Our last interim report was logged TXX-5011, dated September 12, 1986.

The specific deficiency involved recent calculations which indicated that a separation gap dimension should be greater than the existing design dimension durir.g extreme high temperature conditions. Using more realistic data, this calculation was refined to demonstrate that the present gap is acceptable.

Review and evaluation of the refined calculations are scheduled for completion by February 20, 1987.

We anticipate submitting our next report no later than March 13,-1987.

Very truly yours, Wb W. ' G'."Counsil JCH/mlh

~

c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8612030541 861121