TXX-6494, Interim Deficiency Rept CP-86-76 Re Configuration & Dimensions of Gould Battery Racks Deviating from Drawing Requirements.Initially Reported on 861021.Evaluation in Final Stage of Review.Next Rept Will Be Submitted by 870810: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Log # TXX-6494 1"l" """-- | ||
File # 10110 L | |||
File # 10110 L | 908.3 | ||
~ | |||
= | |||
= | |||
Ref # 10CFR50.55(e) 1UELECTRIC June 12, 1987 wminm c. coumu E ecutne he Presklent U.~ S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. | |||
20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 25: | Line 29: | ||
DOCKET NOS. 50-445 AND 50-446 DEVIATIONS IN G0ULD BATTERY RACK DIMENSIONS SDAR: CP-86-76 (INTERIM REPORT) | DOCKET NOS. 50-445 AND 50-446 DEVIATIONS IN G0ULD BATTERY RACK DIMENSIONS SDAR: CP-86-76 (INTERIM REPORT) | ||
Gentlemen: | Gentlemen: | ||
On October 21, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving the configuration and dimensions of Gould Battery Racks deviating from drawing requirements. This is an interim report of a potentially | On October 21, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving the configuration and dimensions of Gould Battery Racks deviating from drawing requirements. | ||
reportable item under the provisions of 10CFR50.55(e). We have submitted | This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). | ||
interim reports logged TXX-6110 and TXX-6407, dated November 20, 1986, and April 29, 1987, respectively. On June 5,1987, we also verbally rcquested and received from the NRC an extension until June 12, 1987 to respond to this issue. | We have submitted interim reports logged TXX-6110 and TXX-6407, dated November 20, 1986, and April 29, 1987, respectively. On June 5,1987, we also verbally rcquested and received from the NRC an extension until June 12, 1987 to respond to this issue. | ||
Class 1E battery racks for Trains A and B, which were designed and fabricated by Gould, were found to have configurations and dimensions which deviated from the vendor design drawings. These deviations could result in violation of battery cell spacing requirements for Class IE batteries. Our review has determined that the conditions are applicable to Units 1 and 2. | Class 1E battery racks for Trains A and B, which were designed and fabricated by Gould, were found to have configurations and dimensions which deviated from the vendor design drawings. | ||
Currently our evaluation is in the final stage of review. We are also evaluating the generic implications of this issue. Our next report will be submitted by August 10, 1987. | These deviations could result in violation of battery cell spacing requirements for Class IE batteries. | ||
Very truly yours, | Our review has determined that the conditions are applicable to Units 1 and 2. | ||
Currently our evaluation is in the final stage of review. | |||
We are also evaluating the generic implications of this issue. Our next report will be submitted by August 10, 1987. | |||
S | Very truly yours, j | ||
. G. Counsil RWH/gj c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 9 8706170310 B70612 dcp V | |||
PDR ADOCK 05000445 | |||
/ | |||
S PDR iO 400 North Ohve Street LB 81 Dallas, Texas 75201}} | |||
Latest revision as of 00:16, 4 December 2024
| ML20215B389 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/12/1987 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-86-76, TXX-6494, NUDOCS 8706170310 | |
| Download: ML20215B389 (1) | |
Text
Log # TXX-6494 1"l" """--
File # 10110 L
908.3
~
=
=
Ref # 10CFR50.55(e) 1UELECTRIC June 12, 1987 wminm c. coumu E ecutne he Presklent U.~ S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 DEVIATIONS IN G0ULD BATTERY RACK DIMENSIONS SDAR: CP-86-76 (INTERIM REPORT)
Gentlemen:
On October 21, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving the configuration and dimensions of Gould Battery Racks deviating from drawing requirements.
This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
We have submitted interim reports logged TXX-6110 and TXX-6407, dated November 20, 1986, and April 29, 1987, respectively. On June 5,1987, we also verbally rcquested and received from the NRC an extension until June 12, 1987 to respond to this issue.
Class 1E battery racks for Trains A and B, which were designed and fabricated by Gould, were found to have configurations and dimensions which deviated from the vendor design drawings.
These deviations could result in violation of battery cell spacing requirements for Class IE batteries.
Our review has determined that the conditions are applicable to Units 1 and 2.
Currently our evaluation is in the final stage of review.
We are also evaluating the generic implications of this issue. Our next report will be submitted by August 10, 1987.
Very truly yours, j
. G. Counsil RWH/gj c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 9 8706170310 B70612 dcp V
PDR ADOCK 05000445
/