ML20215G308: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:., | {{#Wiki_filter:x | ||
., | |||
[ | |||
JUN 161987 | |||
. | |||
,. | ,. | ||
Docket 1No.-50-266' | |||
Docket No. 50-301= | |||
Wisconsin Electric Power Company. | |||
ATTN: .Mr. C..W; Fay | |||
'Vice President | |||
Nuclear Power Department | |||
231 West, Michigan,. Room 308 | |||
Milwaukee,.WI: .53201 | |||
Gentlemen: | |||
This refers to the safety inspection conducted by Messrs. R. A. Paul and | |||
D. E. Miller of this. office during the period April 28 through May.19, 1987, | |||
. | |||
ofl activities at Point Beach Nuclear Plant, Units 1 and'2, authorized by NRC- | |||
' Operating. Licenses No. DPR-24 and No. DPR-27, and to the discussion of our | |||
findings with Mr. J. Zach and other members'of your staff. | |||
The enclosed copy of our inspection report identifies areas examined during | |||
the inspection. Within these areas, the inspection consisted of a selective | |||
examination'of procedures and representative records, observations, and | |||
interviews with personnel. | |||
During this inspection, certain of your activities appeared to be in violation | |||
of NRC requirements. | |||
We are releasing this report at this time for your | |||
information. .You will be notified by separate correspondence of our decision | |||
regarding enforcement action _ based on the findings of this inspect. ion. | |||
No | |||
written response is required until you are notified of the proposed | |||
'' | '' | ||
enforement action. | |||
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of | |||
this letter.and the enclosures will be placed in the NRC Public Document | |||
. | |||
' | |||
Room. | |||
N | |||
/s | |||
Y s\\3 | |||
8706230200 070616 | |||
ADOCK0500g6 | |||
PDR | |||
G | |||
a | a | ||
; | |||
,, | |||
.. . | |||
. Wisconsin Electric Power | |||
2 'JUN 161987- | |||
. Company.. | |||
We will gladly discuss any questions you have concerning this inspection. | |||
Sincerely, | |||
" Original signed by W.D. Shafer" | |||
W. D. Shafer, Chief | |||
Emergency Preparedness and | |||
Radiological Protection Branch | |||
] | |||
1 | |||
Enclosure: | |||
Inspection Reports | |||
-; | |||
No. 50-266/87011(DRSS); | |||
' | |||
No. 50-301/87010(DRSS) | |||
l | |||
cc w/ enclosure: | |||
! | |||
J. J. Zach, Plant Manager' | |||
i | |||
DCS/RSB (RIDS) | |||
Licensing Fee Management Branch | |||
! | |||
Resident' Inspector,;RIII | |||
; | |||
Virgil Kanable, Chief | |||
' | |||
. | |||
Boiler Section | |||
' | ' | ||
Mary Lou Munts, Chairperson | |||
Wisconsin Public Service | |||
Commission | |||
.Collette Blum-Meister (SLO),. | |||
WI Div. of Emergency Government | |||
Lawrence J. McDonnell, Chief | |||
Radiation Protection Section | |||
WI Department of Health and | |||
Social Services, Division | |||
of Health | |||
RII | |||
RI I | |||
RIII | |||
R1 | |||
(e | |||
} | |||
h | |||
w\\K | |||
lib | |||
Mil er | |||
er | |||
De ayette | |||
Schultz | |||
er | |||
- | |||
4 -is-t? | |||
1 | |||
.J | |||
}} | }} | ||
Latest revision as of 22:23, 3 December 2024
| ML20215G308 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/16/1987 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20215G310 | List: |
| References | |
| NUDOCS 8706230208 | |
| Download: ML20215G308 (2) | |
See also: IR 05000266/1987011
Text
x
.,
[
JUN 161987
.
,.
Docket 1No.-50-266'
Docket No. 50-301=
Wisconsin Electric Power Company.
ATTN: .Mr. C..W; Fay
'Vice President
Nuclear Power Department
231 West, Michigan,. Room 308
Milwaukee,.WI: .53201
Gentlemen:
This refers to the safety inspection conducted by Messrs. R. A. Paul and
D. E. Miller of this. office during the period April 28 through May.19, 1987,
.
ofl activities at Point Beach Nuclear Plant, Units 1 and'2, authorized by NRC-
' Operating. Licenses No. DPR-24 and No. DPR-27, and to the discussion of our
findings with Mr. J. Zach and other members'of your staff.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination'of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements.
We are releasing this report at this time for your
information. .You will be notified by separate correspondence of our decision
regarding enforcement action _ based on the findings of this inspect. ion.
No
written response is required until you are notified of the proposed
enforement action.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter.and the enclosures will be placed in the NRC Public Document
.
'
Room.
N
/s
Y s\\3
8706230200 070616
ADOCK0500g6
G
a
,,
.. .
. Wisconsin Electric Power
2 'JUN 161987-
. Company..
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original signed by W.D. Shafer"
W. D. Shafer, Chief
Radiological Protection Branch
]
1
Enclosure:
Inspection Reports
-;
No. 50-266/87011(DRSS);
'
No. 50-301/87010(DRSS)
l
cc w/ enclosure:
!
J. J. Zach, Plant Manager'
i
DCS/RSB (RIDS)
Licensing Fee Management Branch
!
Resident' Inspector,;RIII
Virgil Kanable, Chief
'
.
Boiler Section
'
Mary Lou Munts, Chairperson
Wisconsin Public Service
Commission
.Collette Blum-Meister (SLO),.
WI Div. of Emergency Government
Lawrence J. McDonnell, Chief
Radiation Protection Section
WI Department of Health and
Social Services, Division
of Health
RII
RI I
RIII
R1
(e
}
h
w\\K
lib
Mil er
er
De ayette
Schultz
er
-
4 -is-t?
1
.J