TXX-6024, Interim Deficiency Rept CP-86-65 Re Unconsolidated Concrete in Exterior Wall of Reactor Containment Bldg.Initially Reported on 860915.Evaluation Underway Re Effects of Concrete Void.Next Rept by 861217: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:' | {{#Wiki_filter:' | ||
Log # TXX-6024 File # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER . 400 NORTH OLIVE STREP"F. I B. Al . DALLAS. TEXAS 75201 October 15, 1986 | Log # TXX-6024 File # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OLIVE STREP"F. I B. Al. DALLAS. TEXAS 75201 October 15, 1986 | ||
:=~~Yb {_5- \Yll | :=~~Yb {_5 Y. | ||
- \\Yll | |||
__l j | |||
l L | WILLIAM G. COUNSIL | ||
Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 | ,I i | ||
anscunvs vice possionest l | |||
L I | |||
J Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 | |||
==SUBJECT:== | ==SUBJECT:== | ||
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | ||
DOCKET N0. 50-446 UNCONSOLIDATED CONCRETE - UNIT 2 RCB EXTERIOR WALL SDAR: | DOCKET N0. 50-446 UNCONSOLIDATED CONCRETE - UNIT 2 RCB EXTERIOR WALL SDAR: | ||
CP-86-65 (INTERIM REPORT) | |||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On September 15, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving unconsolidated concrete in the exterior wall of CPSES Unit 2 Reactor Containment Building. | |||
On September 15, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving unconsolidated concrete in the exterior wall of CPSES Unit 2 Reactor Containment Building. This is an interim report of a potentially reportable item under .the provision of 10CFR50.55(e). | This is an interim report of a potentially reportable item under.the provision of 10CFR50.55(e). | ||
The condition was identified during the performance of a concrete surface repair which requires chipping of the affected area to sound concrete. Due to the extent of chipping required to reach sound concrete, an evaluation is underway to determine the possible adverse affects of the concrete void. | The condition was identified during the performance of a concrete surface repair which requires chipping of the affected area to sound concrete. Due to the extent of chipping required to reach sound concrete, an evaluation is underway to determine the possible adverse affects of the concrete void. | ||
We anticipate completing our evaluation by November 21, 1986. | We anticipate completing our evaluation by November 21, 1986. | ||
Our next report on this issue will be submitted by December 17, 1986. | |||
Very truly yours, | Very truly yours, | ||
, V710t W. G. Counsil 1 | |||
JCH/mlh c - NRC Region IV (0 + 1 copy) | JCH/mlh c - NRC Region IV (0 + 1 copy) | ||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 861023o064 e61015 PDR S | U. S. Nuclear Regulatory Commission Washington, D.C. | ||
20555 861023o064 e61015 PDR ADOCK 05000446 S | |||
PDR s onuswx or reus crn.rrus n.rcraic cmsnw W MM | |||
?}} | |||
Latest revision as of 23:16, 3 December 2024
| ML20215H277 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/15/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-65, TXX-6024, NUDOCS 8610230064 | |
| Download: ML20215H277 (1) | |
Text
'
Log # TXX-6024 File # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OLIVE STREP"F. I B. Al. DALLAS. TEXAS 75201 October 15, 1986
- =~~Yb {_5 Y.
- \\Yll
__l j
WILLIAM G. COUNSIL
,I i
anscunvs vice possionest l
L I
J Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N0. 50-446 UNCONSOLIDATED CONCRETE - UNIT 2 RCB EXTERIOR WALL SDAR:
CP-86-65 (INTERIM REPORT)
Dear Mr. Johnson:
On September 15, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving unconsolidated concrete in the exterior wall of CPSES Unit 2 Reactor Containment Building.
This is an interim report of a potentially reportable item under.the provision of 10CFR50.55(e).
The condition was identified during the performance of a concrete surface repair which requires chipping of the affected area to sound concrete. Due to the extent of chipping required to reach sound concrete, an evaluation is underway to determine the possible adverse affects of the concrete void.
We anticipate completing our evaluation by November 21, 1986.
Our next report on this issue will be submitted by December 17, 1986.
Very truly yours,
, V710t W. G. Counsil 1
JCH/mlh c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 861023o064 e61015 PDR ADOCK 05000446 S