ML20215L844: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:~
{{#Wiki_filter:,
        /NEA idae Neuenar snek,ee,e,a L6cnetary 1
/NEA
h May 27, 1987                                   )
~
i iv. M. Carrington, Project Manager Off1t.c *? "ue: lear Reactor Regulation                                                   1
1 idae Neuenar snek,ee,e,a L6cnetary h
    -U.S. Nuclear Regulatory Commission                                                       j Washington, D.C. 20555                                                                   1 TRANSMITTAL OF FINAL REPORT, "CONFORMANCE TO GENERIC LETTER 83-28,                       !
May 27, 1987
ITEM 2.2.2--VENDOR INTERFACE PROGRAMS FOR ALL OTHER SAFETY-RELATED COMPONENTS: BRUNSWICK-1 AND -2,"           EGG-NTA-7552, MAY 1987 (FIN D6001) -
)
EWR-116-87 Ref: NRC Form 189, " Evaluation of Conformance to Generic Letter 83-28 For               !
i iv. M. Carrington, Project Manager Off1t.c *? "ue: lear Reactor Regulation 1
ors (Project 2)" (D6001)                                                         j
-U.S. Nuclear Regulatory Commission j
Washington, D.C. 20555 1
TRANSMITTAL OF FINAL REPORT, "CONFORMANCE TO GENERIC LETTER 83-28, ITEM 2.2.2--VENDOR INTERFACE PROGRAMS FOR ALL OTHER SAFETY-RELATED COMPONENTS: BRUNSWICK-1 AND -2," EGG-NTA-7552, MAY 1987 (FIN D6001) -
EWR-116-87 Ref: NRC Form 189, " Evaluation of Conformance to Generic Letter 83-28 For ors (Project 2)" (D6001) j


==Dear Mr. Carrington:==
==Dear Mr. Carrington:==
Transmitted herewith is the above subject report.
Transmitted herewith is the above subject report.
The report documents INEL's evaluation of the licensee actions in response to NRC Generic' Letter 83-28, Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components. Based on the licensee submittals, we                 '
The report documents INEL's evaluation of the licensee actions in response to NRC Generic' Letter 83-28, Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components.
1 conclude that the plant does not conform to the generic letter on this item. The licensee should initiate formal vendor interface programs with the vendors of major safety-related equipment.                                           j Very truly yours, E. W. oberts, Manager NRC Headquarters Support
Based on the licensee submittals, we 1
                                                                                              ]1 ACU:gp
conclude that the plant does not conform to the generic letter on this item. The licensee should initiate formal vendor interface programs with the vendors of major safety-related equipment.
j Very truly yours,
]
E. W.
oberts, Manager NRC Headquarters Support 1
ACU:gp


==Enclosure:==
==Enclosure:==
 
As Stated i
As Stated                                                                               i cc:   G. L. Jones, DOE-ID e        D. Lasher, SICB (2)
cc:
J. O. Zane, EG&G Idaho, Inc. (w/o Encl.)
G. L. Jones, DOE-ID 4
8706260191 870527 PDR     ADOCK 05000324 P                       PDR EGRG sm, sne.           11428 RockvlNe Pike     Suite 410   Rockville, MD 20852 o                                                                                             i}}
D. Lasher, SICB (2) e J. O. Zane, EG&G Idaho, Inc. (w/o Encl.)
8706260191 870527 PDR ADOCK 05000324 P
PDR EGRG sm, sne.
11428 RockvlNe Pike Suite 410 Rockville, MD 20852 i
o}}

Latest revision as of 21:37, 3 December 2024

Forwards Final EGG-NTA-7552, Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components:Brunswick 1 & 2, Informal Rept. Plant Does Not Conform to Generic Ltr on Subj Item
ML20215L844
Person / Time
Site: Brunswick  
Issue date: 05/27/1987
From: Roberts E
EG&G IDAHO, INC., IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY
To: Carrington M
Office of Nuclear Reactor Regulation
Shared Package
ML20215L847 List:
References
CON-FIN-D-6001 EWR-116-87, GL-83-28, NUDOCS 8706260191
Download: ML20215L844 (1)


Text

,

/NEA

~

1 idae Neuenar snek,ee,e,a L6cnetary h

May 27, 1987

)

i iv. M. Carrington, Project Manager Off1t.c *? "ue: lear Reactor Regulation 1

-U.S. Nuclear Regulatory Commission j

Washington, D.C. 20555 1

TRANSMITTAL OF FINAL REPORT, "CONFORMANCE TO GENERIC LETTER 83-28, ITEM 2.2.2--VENDOR INTERFACE PROGRAMS FOR ALL OTHER SAFETY-RELATED COMPONENTS: BRUNSWICK-1 AND -2," EGG-NTA-7552, MAY 1987 (FIN D6001) -

EWR-116-87 Ref: NRC Form 189, " Evaluation of Conformance to Generic Letter 83-28 For ors (Project 2)" (D6001) j

Dear Mr. Carrington:

Transmitted herewith is the above subject report.

The report documents INEL's evaluation of the licensee actions in response to NRC Generic' Letter 83-28, Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components.

Based on the licensee submittals, we 1

conclude that the plant does not conform to the generic letter on this item. The licensee should initiate formal vendor interface programs with the vendors of major safety-related equipment.

j Very truly yours,

]

E. W.

oberts, Manager NRC Headquarters Support 1

ACU:gp

Enclosure:

As Stated i

cc:

G. L. Jones, DOE-ID 4

D. Lasher, SICB (2) e J. O. Zane, EG&G Idaho, Inc. (w/o Encl.)

8706260191 870527 PDR ADOCK 05000324 P

PDR EGRG sm, sne.

11428 RockvlNe Pike Suite 410 Rockville, MD 20852 i

o