ML20217N744: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:v   .
{{#Wiki_filter:v
                                        ~
~
3/26/98 Science and Engineering Associates, Inc.
3/26/98 Science and Engineering Associates, Inc.
ATTN: llene R. Colina Sr. Contract Administrator 6100 Uptown Blvd. NE, Suite 700             ..
ATTN: llene R. Colina Sr. Contract Administrator 6100 Uptown Blvd. NE, Suite 700 Albuquerque, NM 87110
Albuquerque, NM 87110
' Dear. Ms. Colina
      ' Dear. Ms. Colina


==Subject:==
==Subject:==
Task Order No. 3, Mod.1, entitled, " Technical Assistance for Ukraine MPC&A under the CTR Program: Development of a Reactor Safety System Vital Area Analysis Training Course and Associated Physical Protection Practices." under Contract No. NRC-02-98-005 The purpose of this modifications is to add the cost of the participants workshop and travel costs and correct the obligation amount unoer the basic contract to read $23,251.00 due to typographical error. This effort shall be performed in accordance with the enclosed modification to Statement of Work and the contractor's technical proposal dated March 25,1998.
Task Order No. 3, Mod.1, entitled, " Technical Assistance for Ukraine MPC&A under the CTR Program: Development of a Reactor Safety System Vital Area Analysis Training Course and Associated Physical Protection Practices." under Contract No. NRC-02-98-005 The purpose of this modifications is to add the cost of the participants workshop and travel costs and correct the obligation amount unoer the basic contract to read $23,251.00 due to typographical error. This effort shall be performed in accordance with the enclosed modification to Statement of Work and the contractor's technical proposal dated March 25,1998.
The total estimated cost for this modification is $8,258.00 of which $8,057.00 represents the estimated cost and $201.00 for fixed fee. The total task order ceiling is revised from
The total estimated cost for this modification is $8,258.00 of which $8,057.00 represents the estimated cost and $201.00 for fixed fee. The total task order ceiling is revised from
        $23,251.00 to $31,509.00 of which $30,202.00 represents the estimated costs inclusive of FCCM and $1,307.00 for fixed fee. The amount obligated for this modification is $8,258.00.
$23,251.00 to $31,509.00 of which $30,202.00 represents the estimated costs inclusive of FCCM and $1,307.00 for fixed fee. The amount obligated for this modification is $8,258.00.
      ~ The accounting data for subject task order is as follows:
~ The accounting data for subject task order is as follows:
B & R N o.:           5060815000 ob Code No.:       J5224 3
B & R N o.:
A P P N N o.:           31X0200                                                         '
5060815000
BOC No.:               252A                                                             8 Obligated Amt.:         $8,258.00                                                             )
'ob Code No.:
              ' FFS# 5098R045 gg (Total Obligations for FY98 $31,509.00)
J5224 3
A P P N N o.:
31X0200 BOC No.:
252A 8
Obligated Amt.:
$8,258.00
)
' FFS# 5098R045 gg (Total Obligations for FY98 $31,509.00)
The issuance of this task order does not amend any terms or conditions of the subject contract.
The issuance of this task order does not amend any terms or conditions of the subject contract.
i 1
i 1
i> U L .1 b i
i> U L.1 b
9004090189 900327                                                                                 i PDR       CONTR                                                                                   !
i 9004090189 900327 i
NRC-02-98-OO5 PDR
PDR CONTR NRC-02-98-OO5 PDR
: n. .
 
n.
j;
j;
                                      ~
~
NRC-02-98-005
NRC-02-98-005
                                                    ~
~
T.O. 3, Mod. 1 Page 2 of 2 Please indicate your acceptance of this task order by having an official, authorized to bind your organization, execute three copies of this document in the space provided and return two '
T.O. 3, Mod. 1 Page 2 of 2 Please indicate your acceptance of this task order by having an official, authorized to bind your organization, execute three copies of this document in the space provided and return two '
copies to the U.S. Nuclear Regulatory Com,rnission, ATTN: Sharlene McCubbin, Division of Contracts and Property Management, M/S T-7-1-2, Washington, D.C. 20555 You should retain the third copy for your records.
copies to the U.S. Nuclear Regulatory Com,rnission, ATTN: Sharlene McCubbin, Division of Contracts and Property Management, M/S T-7-1-2, Washington, D.C. 20555 You should retain the third copy for your records.
Should you have any questions conceming this letter, please contact Sharlene McCubbin, C3ntract Specialist, on (301) 415-6565.
Should you have any questions conceming this letter, please contact Sharlene McCubbin, C3ntract Specialist, on (301) 415-6565.
Sincerely, a
Sincerely, k
k
a
                                                                . Mace, Con:r eti Officer Contracts Management Branch No.1 Division of Contracts and Property Management Office of Administration
. Mace, Con:r eti Officer Contracts Management Branch No.1 Division of Contracts and Property Management Office of Administration


==Enclosure:==
==Enclosure:==
As stated ACCEPTED: T.O. No. 3, Mod.1 NAMil Y
4 AL d.
TITLE a /o7/n DATE 4


As stated ACCEPTED: T.O. No. 3, Mod.1 NAMil 4 ALYd .                ''
.u MODIFICATION TO STATEMENT OF WORK TASK ORDER NO.,3 1.0 Backaround -
TITLE DATE a /o7/n 4
. As stated in Section C.3 of the basic contract,' the objective of SEA's contract is to provide assistance, as requested, to the Regulatory and international Safeguards Branch, Division of Fuel Cycle Safety and Safeguards, NMSS, for jointly agreed-upon activities related to regulatory development of physical protection programs within the FSU republics.
 
  ,- .u MODIFICATION TO STATEMENT OF WORK TASK ORDER NO. ,3 1.0 Backaround -
        . As stated in Section C.3 of the basic contract,' the objective of SEA's contract is to provide assistance, as requested, to the Regulatory and international Safeguards Branch, Division of Fuel Cycle Safety and Safeguards, NMSS, for jointly agreed-upon activities related to regulatory development of physical protection programs within the FSU republics.
Work related to regulatory development shall include developing, reviewing, or analyzing regulations, guidance documents, licensing and inspection procedures, and facility plans; developing and conducting training programs; participating in and evaluating facilities, facility inspections, and site surveys; participating in familiarization and accompaniment visits and other activities related to regulatory development; and administrative support for meetings and foreign visitor travel. ~
Work related to regulatory development shall include developing, reviewing, or analyzing regulations, guidance documents, licensing and inspection procedures, and facility plans; developing and conducting training programs; participating in and evaluating facilities, facility inspections, and site surveys; participating in familiarization and accompaniment visits and other activities related to regulatory development; and administrative support for meetings and foreign visitor travel. ~
As a part of the administrative support for workshops under Section C.3 of the basic contract,
As a part of the administrative support for workshops under Section C.3 of the basic contract,
        - .the NRC requests that the following in-scope work be added:
-.the NRC requests that the following in-scope work be added:
2.0 SCOPE OF WORK                                                                     ^
^
The contractor shall provide for workshop venue rental costs and for travel, lodging and meals for FSU agency personnel attending this workshop in coordination with FSU agency in charge.
2.0 SCOPE OF WORK The contractor shall provide for workshop venue rental costs and for travel, lodging and meals for FSU agency personnel attending this workshop in coordination with FSU agency in charge.
Funds for each participant shall not exceed maximum per diem rates as provided in the Federal Travel Regulations.
Funds for each participant shall not exceed maximum per diem rates as provided in the Federal Travel Regulations.
t
t
                                                                  .}}
.}}

Latest revision as of 07:51, 3 December 2024

Ltr Contract:Task Order 3,mod 1, Technical Assistance for Ukraine Mpc&A Under Ctr Program:Development of Reactor Safety Sys VA Analysis Training Course & Associated Physical Protection Practices, Under Contract NRC-02-98-005
ML20217N744
Person / Time
Issue date: 03/27/1998
From: Mace M
NRC OFFICE OF ADMINISTRATION (ADM)
To: Colina I
SCIENCE & ENGINEERING ASSOCIATES, INC.
References
CON-FIN-J-5224, CON-NRC-02-98-005, CON-NRC-2-98-5 NUDOCS 9804090189
Download: ML20217N744 (3)


Text

v

~

3/26/98 Science and Engineering Associates, Inc.

ATTN: llene R. Colina Sr. Contract Administrator 6100 Uptown Blvd. NE, Suite 700 Albuquerque, NM 87110

' Dear. Ms. Colina

Subject:

Task Order No. 3, Mod.1, entitled, " Technical Assistance for Ukraine MPC&A under the CTR Program: Development of a Reactor Safety System Vital Area Analysis Training Course and Associated Physical Protection Practices." under Contract No. NRC-02-98-005 The purpose of this modifications is to add the cost of the participants workshop and travel costs and correct the obligation amount unoer the basic contract to read $23,251.00 due to typographical error. This effort shall be performed in accordance with the enclosed modification to Statement of Work and the contractor's technical proposal dated March 25,1998.

The total estimated cost for this modification is $8,258.00 of which $8,057.00 represents the estimated cost and $201.00 for fixed fee. The total task order ceiling is revised from

$23,251.00 to $31,509.00 of which $30,202.00 represents the estimated costs inclusive of FCCM and $1,307.00 for fixed fee. The amount obligated for this modification is $8,258.00.

~ The accounting data for subject task order is as follows:

B & R N o.:

5060815000

'ob Code No.:

J5224 3

A P P N N o.:

31X0200 BOC No.:

252A 8

Obligated Amt.:

$8,258.00

)

' FFS# 5098R045 gg (Total Obligations for FY98 $31,509.00)

The issuance of this task order does not amend any terms or conditions of the subject contract.

i 1

i> U L.1 b

i 9004090189 900327 i

PDR CONTR NRC-02-98-OO5 PDR

n.

j;

~

NRC-02-98-005

~

T.O. 3, Mod. 1 Page 2 of 2 Please indicate your acceptance of this task order by having an official, authorized to bind your organization, execute three copies of this document in the space provided and return two '

copies to the U.S. Nuclear Regulatory Com,rnission, ATTN: Sharlene McCubbin, Division of Contracts and Property Management, M/S T-7-1-2, Washington, D.C. 20555 You should retain the third copy for your records.

Should you have any questions conceming this letter, please contact Sharlene McCubbin, C3ntract Specialist, on (301) 415-6565.

Sincerely, k

a

. Mace, Con:r eti Officer Contracts Management Branch No.1 Division of Contracts and Property Management Office of Administration

Enclosure:

As stated ACCEPTED: T.O. No. 3, Mod.1 NAMil Y

4 AL d.

TITLE a /o7/n DATE 4

.u MODIFICATION TO STATEMENT OF WORK TASK ORDER NO.,3 1.0 Backaround -

. As stated in Section C.3 of the basic contract,' the objective of SEA's contract is to provide assistance, as requested, to the Regulatory and international Safeguards Branch, Division of Fuel Cycle Safety and Safeguards, NMSS, for jointly agreed-upon activities related to regulatory development of physical protection programs within the FSU republics.

Work related to regulatory development shall include developing, reviewing, or analyzing regulations, guidance documents, licensing and inspection procedures, and facility plans; developing and conducting training programs; participating in and evaluating facilities, facility inspections, and site surveys; participating in familiarization and accompaniment visits and other activities related to regulatory development; and administrative support for meetings and foreign visitor travel. ~

As a part of the administrative support for workshops under Section C.3 of the basic contract,

-.the NRC requests that the following in-scope work be added:

^

2.0 SCOPE OF WORK The contractor shall provide for workshop venue rental costs and for travel, lodging and meals for FSU agency personnel attending this workshop in coordination with FSU agency in charge.

Funds for each participant shall not exceed maximum per diem rates as provided in the Federal Travel Regulations.

t

.