ML20235D923: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000344/1987024]]
| number = ML20235D923
| issue date = 09/18/1987
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/87-24
| author name = Zimmerman R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee name = Cockfield D
| addressee affiliation = PORTLAND GENERAL ELECTRIC CO.
| docket = 05000344
| license number =
| contact person =
| document report number = NUDOCS 8709250409
| title reference date = 09-11-1987
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
}}
See also: [[see also::IR 05000344/1987024]]
 
=Text=
{{#Wiki_filter:. - _ _ _ - _ - _ _
  :c - o                                                                                . - . . .
                                                                                      tJSNRC-DS
          Docket No. 50-344                            SEP 181987
                                                                                  M1 SEP 25 A 9 39
          Purtland General Electric Company
          121 S. W. Salmon Street
          Portland, Oregon 97204
        . Attention:                Mr. David W. Cockfield
                                      Vice President, Nuclear
          Gentlemen:
          .Thank you for your letter dated September 11, 1987, in response to our Notice
          of Violation and Inspection Report No. 50-344/87-24, dated August 10, 1987,
          informing us of the steps you have taken to correct the items which we
          brought to your attention.                Your corrective actions will be verified during a
          future inspection.
          Your cooperation with us is appreciated.
                                                                      Sincerely,
                                                                        .    .        .          .
                                                                      R. P/ Zimmerma , Chief
                                                                      Reactor Projects Branch
          cc w/cy ltr dtd 9/11/87:
          W. Dixon, DOE
          bec w/cy ltr dtd 9/11/87:
          RSB/ Document Control Desk (RIDS) (IE01)
          Project Inspector
          Resident Inspector
          B. Faulkenberry
          J. Martin
        'J. Zo111 coffer                                                                                            {
                                                                                                                    .l'
          bcc w/o cy of ltr dtd 9/11/87:
          M. Smith
          Regiong
          [fffE                                'ST COPY ] REQUEST COPY ] REQUEST gOPY          s ] REQUEST COPY ]
          [\Yp%6ST              // NO COPY
                                        ](YES /] NO
                                          "
                                                  AEQ)UI
                                                        ] YES / (RT) "
                                                                          _] YES / rN0 1] YES / NO
                                                                                                                ~
                                                                                      y [$              TO PD
                                                                                                      ~
                                                              itf E
          DPepeira/ norma                  MMendonca      RPZimmerman      AJ  son            efWrsch yg
          9/l1/87                          9/K/87          9/1f/87          9/g 87              9/ /87
                                                                                                        A/ E-
                  8709250409 870918
                              DR ADOCK 0 % 3 4
L
                                                                                                              /E01  i
                                                                                                                      !
 
          _ - - -            - - _ - - _ _ _          _  _
        .
*-    ,              .                        ,
,;- . ..                .
                            -                                                                            REcgigED
                                                                              b'WV                          RE 10H V
                                                David W. Cockfield Vice President, Nuclear            1981 SEP 1ti A O 23
                                                                                            September 11, 1987
                                                                                            Trojan Nucicar Plant
                                                                                            Docket 50-344
                                                                                            License NPF-1
                    U. S. Nucicar Regulatory Commission
                    Attention: Document Control Desk
                    Washington DC 20555
                    Dear Sir:
                                                                      TROJIS NUCLEAR PLANT
                                                                Reply to a Notice of Violation
                    Your letter of August 10, 1987, transmitted a Notice of Violation based
                    upon NRC Inspection Report 50-344/87-24. Attached to this letter is our
                    response to that Notice of Violation. This letter and response is being
                      submitted two days late due to personnel error.
                                                                                        Sincerely,
                                                                                      /
                                                                                  r
                    Attachment
                      c:    Mr. John B. Martin
                            Regional Administrator, Region V
                            U. S. Nuc1 car Regulatory Commission
                            Mr. David Kish, Director
                            State of Oregon
                            Department of Energy
                            Mr. R. C. Barr
                            NRC Resident Inspector
                            Trojan Nuc1 car Plant
                      Subscribed and sworn to before mo this cloventh day of September 1987.                              ;
                                                                                                                          9
                                                                                        M dit          LLU
                                                                                            Nota 6y Public of Oregon
                                                    My Commission Expires:          (
                  n . . ~                      -~      n
        N                [                                    *
 
          -- _ _
-.
                .
    .            .              .
      ~ ~
                      . Trojan Nuclear Plant                                  Document Control Desk
              *
                    e  Docket 50-344                                          September 11, 1987
                      Licence NPF-1                                          Attachment
                                              PCE REPLY TO NOTICE OF VIOLATION
                      Violation
                            10 CFR 50.72(b)(2)(ii) requires that the licensco shall notify the
                            NRC as soon as practical and in all cases, within four hours of he
                            occurrence of any event or condition that results in manual or auto-
                            matic actuation of any Enginecred Safety Feature, including the
                            Reactor Protection System.
                            Contrary to the above, an automatic actuation of the Reactor Protec-
                            tion System occurred at 9:02 p.m. on June 29, 1987, resulting in the
                            opening of reactor trip breakers RTA and RTB and bypass breaker BYB,
                            but this event was not reported to the NRC until 7:05 p.m. on June 30,
                            1987.
                            This is a severity Level V violation (Supplement I).
                      PGE Response
                            PGE acknowledges that the automatic actuation of the Reactor Protoc-
                            tion System (RPS) Which occurred at 9:02 p.m. on June 29, 1987, was
                            not reported to the NRC until 7:05 p.m. on June 30, 1987. This is in
                            violation of 10 CFR 50.72(b)(2)(li) which requires this event to be
                            reported within four hours. The reason for the violation was person-
                            nel error.
                            At the time of the RPS actuation, the plant was in Mode 5 (cold shut-
                            down) with the Reactor Coolant System at about 110*F. The control
                            rods were inserted and the control rod drive mechanisms (CRDM) were
                            deenergized with both CRDM generators shut down. The Plant operators
                            were conducting a simulated loss of offsite power test which involved
                            reactor trip breaker manipulations. Under these conditions, the
                            operators failed to initially recognize roccipt of an unexpected re-
                            actor trip signal as immediately reportable and, therefore, did not
                            meet the four-hour reporting requirement.
                            In addition to discussing the event with operational staff, written
                            instructions worc issued to operators emphasizing the immediato re-
                            porting requirements for RPS actuations. Since that time, there have
                            been no similar occurrences. Since a telephone notification was made
                            on June 30, 1987, with a followup 30-day report submitted July 16,
                            1987 (LER 87-16), correctivo action addressing the operator error is
                            complete and full compliance has been determined to be achieved.
                      DLN/rc
                      1670P
f
l~
    90%/U ^ W~ 1gvj          g ~~)
                        l10 n*2  g. f,                                                              . _ _ _ . - . _____m
}}

Revision as of 05:57, 3 December 2024