TXX-6773, Forwards Wg Counsil 870923 Cover Ltr & Impell Calculations & Position Papers,Including Rev 0 to IM-P-011, Unbraced Lengths Used to Evaluate Lateral Torsional Buckling of Trapeze Support Post Members, as Requested by Cygna: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 19: | Line 19: | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
(- | (- | ||
e l | e l | ||
Log # TXX-6773 1 | |||
== | |||
Log # TXX-6773 1 | |||
wmism c. counsit | 2 File #~10068 | ||
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.'C. 20555 | .-T C' | ||
10010 clo 1UELECTRIC g | |||
wmism c. counsit September 23, 1987 Executive Vice President i' | |||
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.'C. | |||
20555 I- | |||
==SUBJECT:== | ==SUBJECT:== | ||
'COMANCllE PEAVs STEAM ELECTRIC STATION.(CPSES) | 'COMANCllE PEAVs STEAM ELECTRIC STATION.(CPSES) | ||
DOCKET N05. 50-445 AND 50-446 DOCUMENTS REQUESTED BY CYGNA | |||
' Gentlemen: | |||
Attached are 15 copies of the {{letter dated|date=September 23, 1987|text=letter dated September 23, 1987}},;from W. G. | Attached are 15 copies of the {{letter dated|date=September 23, 1987|text=letter dated September 23, 1987}},;from W. G. | ||
Counsil to N. II. Williams (with enclosures), transmitting information requested by CYGNA. | |||
The Atomic Safety and Licensing Board will be notified of the transmittal by a separate letter from our attorney. | The Atomic Safety and Licensing Board will be notified of the transmittal by a separate letter from our attorney. | ||
L Very truly yours, | L Very truly yours, 1d W. G. Counsil By: | ||
b, | |||
G. S. Keeley | .s_- | ||
PDR | r G. S. Keeley i | ||
ADOCK 05000445 PDR | Manager, Nuclear Lics ing JDS/mgt Attachmen; c-Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) b | ||
400 North Olive Street LB 8I Dallas. Texas 75201 | / | ||
8709290233 870923 PDR ADOCK 05000445 I | |||
A PDR jp l | |||
400 North Olive Street LB 8I Dallas. Texas 75201 l | |||
4 M | 4 M | ||
lllllllll' ':lllllllll | lllllllll' ':lllllllll Log # TXX-6772 File # 2260 10068 clo it/ ELECTRIC | ||
["j' [l"j, September 23, 1987 CYGNA Energy Services AlTN: Ms. N. H. Williams, Project Manager Comanche Peak Project 2121 N. California Blvd. | |||
Suite 390 Walnut Creek, CA 94596 | |||
["j' [l"j, | |||
Suite 390 Walnut Creek, CA 94596 | |||
==SUBJECT:== | ==SUBJECT:== | ||
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) i TRANSMITTAL OF DOCUMENTS REQUESTED BY CYGNA | ||
TRANSMITTAL OF DOCUMENTS REQUESTED BY CYGNA | |||
==Dear Ms. Williams:== | ==Dear Ms. Williams:== | ||
Enclosed please find three copies of the following documents: | Enclosed please find three copies of the following documents: | ||
Impell Document | Impell Document Related Generic Issue Calculation B-04 Rev. O Issue 4 B Calculation M-12 Rev. 3 Issue 7 Calculation M-27 Rev. 2 Issue 19 Calculation M-39 Rev. 2 Issue 21 D Calculation M-59 Rev. 2 Issue 16 G Calculation M-65 Rev. 2 Issue 9 Position Paper IM-P-011, Issue 14 B "Unbraced Lengths Used to Evaluate Buckling of Trapeze Support Post Members" Position Paper IM-P-012, Issue 26 B | ||
" Stress Evaluation of Angles" Position Paper IM-P-013, Issue 18 | |||
" Justification for Use of Rigid Clamp Stiffnesses" 400 North Ohve Street LB 81 Dntlas. Tens 75201 | |||
~ | |||
D t | D t | ||
Calculation M-15 Rev. 3 | Calculation M-15 Rev. 3 Issue 26 B Calculation M-28 Rev. 3 | ||
*This document was requested by CYGNA during an audit at the Impell office in Walnut Creek. (8/4/87 - 8/6/87) | |||
Very truly yours, W. G. Counsil | Very truly yours, GY W. G. Counsil l | ||
^ | |||
By: | |||
z. | |||
G. S. Keeley & | G. S. Keeley & | ||
-/- | |||
Manager, Nuclear Lfgsnsing JDS/mgt Enclosures | Manager, Nuclear Lfgsnsing JDS/mgt Enclosures | ||
- ~ ~ ~ ~ ' - ' ~ ~ ~ | |||
'~}} | |||
Latest revision as of 05:45, 3 December 2024
| ML20235F610 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/23/1987 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20235F613 | List:
|
| References | |
| TXX-6773, NUDOCS 8709290233 | |
| Download: ML20235F610 (3) | |
Text
.
(-
e l
==
Log # TXX-6773 1
2 File #~10068
.-T C'
10010 clo 1UELECTRIC g
wmism c. counsit September 23, 1987 Executive Vice President i'
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.'C.
20555 I-
SUBJECT:
'COMANCllE PEAVs STEAM ELECTRIC STATION.(CPSES)
DOCKET N05. 50-445 AND 50-446 DOCUMENTS REQUESTED BY CYGNA
' Gentlemen:
Attached are 15 copies of the letter dated September 23, 1987,;from W. G.
Counsil to N. II. Williams (with enclosures), transmitting information requested by CYGNA.
The Atomic Safety and Licensing Board will be notified of the transmittal by a separate letter from our attorney.
L Very truly yours, 1d W. G. Counsil By:
b,
.s_-
r G. S. Keeley i
Manager, Nuclear Lics ing JDS/mgt Attachmen; c-Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) b
/
8709290233 870923 PDR ADOCK 05000445 I
A PDR jp l
400 North Olive Street LB 8I Dallas. Texas 75201 l
4 M
lllllllll' ':lllllllll Log # TXX-6772 File # 2260 10068 clo it/ ELECTRIC
["j' [l"j, September 23, 1987 CYGNA Energy Services AlTN: Ms. N. H. Williams, Project Manager Comanche Peak Project 2121 N. California Blvd.
Suite 390 Walnut Creek, CA 94596
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) i TRANSMITTAL OF DOCUMENTS REQUESTED BY CYGNA
Dear Ms. Williams:
Enclosed please find three copies of the following documents:
Impell Document Related Generic Issue Calculation B-04 Rev. O Issue 4 B Calculation M-12 Rev. 3 Issue 7 Calculation M-27 Rev. 2 Issue 19 Calculation M-39 Rev. 2 Issue 21 D Calculation M-59 Rev. 2 Issue 16 G Calculation M-65 Rev. 2 Issue 9 Position Paper IM-P-011, Issue 14 B "Unbraced Lengths Used to Evaluate Buckling of Trapeze Support Post Members" Position Paper IM-P-012, Issue 26 B
" Stress Evaluation of Angles" Position Paper IM-P-013, Issue 18
" Justification for Use of Rigid Clamp Stiffnesses" 400 North Ohve Street LB 81 Dntlas. Tens 75201
~
D t
Calculation M-15 Rev. 3 Issue 26 B Calculation M-28 Rev. 3
- This document was requested by CYGNA during an audit at the Impell office in Walnut Creek. (8/4/87 - 8/6/87)
Very truly yours, GY W. G. Counsil l
^
By:
z.
G. S. Keeley &
-/-
Manager, Nuclear Lfgsnsing JDS/mgt Enclosures
- ~ ~ ~ ~ ' - ' ~ ~ ~
'~