ML20235R758: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:,                             .-
{{#Wiki_filter:,
1 l
1 l
TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 1
TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 1
l SN 157B Lookout Place JUL 131987 U.S. Nuclear Regulatory Commission ATTN:   Document Control Desk Washington, D.C. 20555 Gentlemen:                                                                                                       i In the Matter of                           )                   Docket Nos. 50-327 Tennessea Valley Authority                 )                               50-328 i
l SN 157B Lookout Place JUL 131987 U.S. Nuclear Regulatory Commission ATTN:
SEQUOYAH NUCLEAR PLANT (SQN) - DESIGN BASELINE AND VERIFICATION PROGRAM (DBVP)                               _
Document Control Desk Washington, D.C.
20555 Gentlemen:
i In the Matter of
)
Docket Nos. 50-327 Tennessea Valley Authority
)
50-328 i
SEQUOYAH NUCLEAR PLANT (SQN) - DESIGN BASELINE AND VERIFICATION PROGRAM (DBVP)
PHASE I REPORT FOR UNIT 2 l
PHASE I REPORT FOR UNIT 2 l
The DBVP Phase I report (prerestart) for unit 2 was issued on May 29, 1987.
The DBVP Phase I report (prerestart) for unit 2 was issued on May 29, 1987.
It discusses the activitiw cnd findin s associated with the review of the adequacy of plant functional configuration modifications and supporting engineering analysis, and adherence to licensing commitments / requirements for                                 1 the critical safety-related systems.
It discusses the activitiw cnd findin s associated with the review of the adequacy of plant functional configuration modifications and supporting engineering analysis, and adherence to licensing commitments / requirements for 1
Copies of the report have been made available to NRC inspection team members who are performing the final DBVP inspection on unit 2.           In addition, a copy l
the critical safety-related systems.
of the report has been sent to the TVA Bethesda Office and is available there                                   !
Copies of the report have been made available to NRC inspection team members who are performing the final DBVP inspection on unit 2.
for NRC review.                                                                                                 )
In addition, a copy l
Very truly yours,                                                   i i
of the report has been sent to the TVA Bethesda Office and is available there for NRC review.
TENNESSEE VALLEY AUTHORITY R. ridley, I) rector                                             i Nuclear Safefy and Licensing                                         !
)
cc: See page 2                                                                                                 l l
Very truly yours, i
8707210420 870713 PDR G
i TENNESSEE VALLEY AUTHORITY R.
ADOCK 05000327 PDR
ridley, I) rector i
                                                                                              ,030 ,
Nuclear Safefy and Licensing cc:
0               :
See page 2 l
l An Eqaat Opportunity Employer Y   --                                                                          ._      ____-_--_-___-___--_____-_____N
l 8707210420 870713 30 PDR ADOCK 05000327
,0,
G PDR
'' 0 l
An Eqaat Opportunity Employer Y
____-_--_-___-___--_____-_____N


r-I e                                                                     l
r-I e
      ,                                                      -2                   ,
l
U.S. Nuclear Regulatory Commission                     JUL 131987 )
-2 U.S. Nuclear Regulatory Commission JUL 131987
i cc:             Mr. G. G. Zech, Assistant Director                 I for Inspection Programs                           l Office of Special Projects                         l U.S. Nuclear Regulatory Commission                 I Region II 101 Marietta Street, N'd, Suite 2900 Atlanta, Georgia 30323                             !
)
I Mr. J. A. Zwolinski, Assistant Director           l for Projects                                     l Division of TVA Projectu                           l l                             Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East West Highway EWW 322 Bethesda, Maryland 20814 Sequoyah Resident Inspector Sequoyah Nuclear Plant                             .
i cc:
2600 Igou Ferry Road                               l Soddy Daisy, Tennessec 37379                       I l
Mr. G. G. Zech, Assistant Director I
i k
for Inspection Programs l
I i
Office of Special Projects l
l 1
U.S. Nuclear Regulatory Commission I
l l
Region II 101 Marietta Street, N'd, Suite 2900 Atlanta, Georgia 30323 I
4 a__-_______   _ _ _ _ _ _ _ _              _  ._
Mr. J. A. Zwolinski, Assistant Director l
                                                                                ,}}
for Projects l
Division of TVA Projectu l
l Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East West Highway EWW 322 Bethesda, Maryland 20814 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road l
Soddy Daisy, Tennessec 37379 I
l i
k I
i l
1 l
l 4
a__-_______
,}}

Latest revision as of 04:28, 3 December 2024

Advises That Design Baseline & Verification Program (Dbvp) Phase I Rept for Unit 2, Issued on 870529,sent to Util Bethesda,Md Ofc for NRC Review & Made Available to NRC Insp Team Members Performing Final Dbvp Insp on Unit 2
ML20235R758
Person / Time
Site: Sequoyah  
Issue date: 07/13/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8707210420
Download: ML20235R758 (2)


Text

,

1 l

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 1

l SN 157B Lookout Place JUL 131987 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

i In the Matter of

)

Docket Nos. 50-327 Tennessea Valley Authority

)

50-328 i

SEQUOYAH NUCLEAR PLANT (SQN) - DESIGN BASELINE AND VERIFICATION PROGRAM (DBVP)

PHASE I REPORT FOR UNIT 2 l

The DBVP Phase I report (prerestart) for unit 2 was issued on May 29, 1987.

It discusses the activitiw cnd findin s associated with the review of the adequacy of plant functional configuration modifications and supporting engineering analysis, and adherence to licensing commitments / requirements for 1

the critical safety-related systems.

Copies of the report have been made available to NRC inspection team members who are performing the final DBVP inspection on unit 2.

In addition, a copy l

of the report has been sent to the TVA Bethesda Office and is available there for NRC review.

)

Very truly yours, i

i TENNESSEE VALLEY AUTHORITY R.

ridley, I) rector i

Nuclear Safefy and Licensing cc:

See page 2 l

l 8707210420 870713 30 PDR ADOCK 05000327

,0,

G PDR

0 l

An Eqaat Opportunity Employer Y

____-_--_-___-___--_____-_____N

r-I e

l

-2 U.S. Nuclear Regulatory Commission JUL 131987

)

i cc:

Mr. G. G. Zech, Assistant Director I

for Inspection Programs l

Office of Special Projects l

U.S. Nuclear Regulatory Commission I

Region II 101 Marietta Street, N'd, Suite 2900 Atlanta, Georgia 30323 I

Mr. J. A. Zwolinski, Assistant Director l

for Projects l

Division of TVA Projectu l

l Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East West Highway EWW 322 Bethesda, Maryland 20814 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road l

Soddy Daisy, Tennessec 37379 I

l i

k I

i l

1 l

l 4

a__-_______

,