ML20235R758

From kanterella
Jump to navigation Jump to search
Advises That Design Baseline & Verification Program (Dbvp) Phase I Rept for Unit 2, Issued on 870529,sent to Util Bethesda,Md Ofc for NRC Review & Made Available to NRC Insp Team Members Performing Final Dbvp Insp on Unit 2
ML20235R758
Person / Time
Site: Sequoyah  
Issue date: 07/13/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8707210420
Download: ML20235R758 (2)


Text

,

1 l

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 1

l SN 157B Lookout Place JUL 131987 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

i In the Matter of

)

Docket Nos. 50-327 Tennessea Valley Authority

)

50-328 i

SEQUOYAH NUCLEAR PLANT (SQN) - DESIGN BASELINE AND VERIFICATION PROGRAM (DBVP)

PHASE I REPORT FOR UNIT 2 l

The DBVP Phase I report (prerestart) for unit 2 was issued on May 29, 1987.

It discusses the activitiw cnd findin s associated with the review of the adequacy of plant functional configuration modifications and supporting engineering analysis, and adherence to licensing commitments / requirements for 1

the critical safety-related systems.

Copies of the report have been made available to NRC inspection team members who are performing the final DBVP inspection on unit 2.

In addition, a copy l

of the report has been sent to the TVA Bethesda Office and is available there for NRC review.

)

Very truly yours, i

i TENNESSEE VALLEY AUTHORITY R.

ridley, I) rector i

Nuclear Safefy and Licensing cc:

See page 2 l

l 8707210420 870713 30 PDR ADOCK 05000327

,0,

G PDR

0 l

An Eqaat Opportunity Employer Y

____-_--_-___-___--_____-_____N

r-I e

l

-2 U.S. Nuclear Regulatory Commission JUL 131987

)

i cc:

Mr. G. G. Zech, Assistant Director I

for Inspection Programs l

Office of Special Projects l

U.S. Nuclear Regulatory Commission I

Region II 101 Marietta Street, N'd, Suite 2900 Atlanta, Georgia 30323 I

Mr. J. A. Zwolinski, Assistant Director l

for Projects l

Division of TVA Projectu l

l Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East West Highway EWW 322 Bethesda, Maryland 20814 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road l

Soddy Daisy, Tennessec 37379 I

l i

k I

i l

1 l

l 4

a__-_______

,