ML20236A151: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:--
{{#Wiki_filter:--
                                                                    .                                                              n October 15, 1987                   q b;                                                                                             EN 87-86 1
n October 15, 1987 q
0FFICE OF ENFORCEMENT                                             I NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Florida Power and Light Company             (EA 87-05)               g (Turkey Point, Units 3 and 4)                                       s Docket Nos. 504 50g 50-251                                         gg subject:   ORDER AND NOTICE OF VIOLATION AND PROPOSED IMPOSITION               C2 b L                                               OF CIVIL PENALTY - $225,000                                             ?
b; EN 87-86 1
ca j
0FFICE OF ENFORCEMENT I
l This is to infom the Commission that an Order and Notice of "Violation aI Proposed Imposition of Civil Penalty in the amount of Two Hundred and Tw y                       '
NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Florida Power and Light Company (EA 87-05) g (Turkey Point, Units 3 and 4) s Docket Nos. 504 50g 50-251 gg subject:
Five Thousand Collars ($225,000) will be issued on or about October 19,           7         -
ORDER AND NOTICE OF VIOLATION AND PROPOSED IMPOSITION C2 b L
to Florida Power end Light Company. The Order confirms the licensee's alan to                   )
OF CIVIL PENALTY - $225,000
have an independent third party review activities at Turkey Point and t1e                       1 company's corporate offices to determine the root causes of the facility's                     j poor past performance. Further, the Order directs the licensee to put in                       i place a corporate operations audit program until the results of the independent                 q appraisal have been received. The Notice of Violation and Proposed Imposition                     i of Civil Penalty is based on three violations including (1) loss of emergency                   !
?
boration flow paths for b0th units because of the failure of operations personnel s
j This is to infom the Commission that an Order and Notice of Violation a ca" I
to use or follow approved procedures, (2) isolation of the backup nitrogen system for the Unit 4 Auxiliary Feedwater System flow control valves for approximate.ly 20 hours, again due to failure to follow approved procedures, and (3) operation of the Unit 3 Intake Cooling Water System outside the plant                   ,
Proposed Imposition of Civil Penalty in the amount of Two Hundred and Tw y
design basis because of poor communications among members of the plant staff.                   I It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:
Five Thousand Collars ($225,000) will be issued on or about October 19, 7
Mailing of Notice                     October 19, 1987 l
to Florida Power end Light Company.
Telephone Notification of Licensee October 19, 1987 The State of Florida will be notified.
The Order confirms the licensee's alan to
The licensee has thirty days from the date of the Notice in which to respond.                   )
)
Followirg,NRC evaluation of the response, the civil penalty may be remitted,                   '
have an independent third party review activities at Turkey Point and t1e 1
mitigated, or imposed by Order.
company's corporate offices to determine the root causes of the facility's j
poor past performance. Further, the Order directs the licensee to put in i
place a corporate operations audit program until the results of the independent q
appraisal have been received.
The Notice of Violation and Proposed Imposition of Civil Penalty is based on three violations including (1) loss of emergency boration flow paths for b0th units because of the failure of operations personnel s
to use or follow approved procedures, (2) isolation of the backup nitrogen system for the Unit 4 Auxiliary Feedwater System flow control valves for approximate.ly 20 hours, again due to failure to follow approved procedures, and (3) operation of the Unit 3 Intake Cooling Water System outside the plant design basis because of poor communications among members of the plant staff.
I It should be noted that the licensee has not been specifically informed of the enforcement action.
The schedule of issuance and notification is:
l Mailing of Notice October 19, 1987 Telephone Notification of Licensee October 19, 1987 The State of Florida will be notified.
The licensee has thirty days from the date of the Notice in which to respond.
)
Followirg,NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.


==Contact:==
==Contact:==
J. Luehman, OE 28822-                 J. Lieberman, OE 28214 Distribution:
J. Luehman, OE 28822-J. Lieberman, OE 28214 Distribution:
H Street             MNBB h 7)       Phillips //fD         EW M       Willste /, S'O Chairman ec           ED0             NRR                   OSP         NMSS Comm. Roberts         DED/ROGR                               NRR Comm. Bernthal       OGC Comm. Carr           RM                                                                       i Comm. Rogers         AEOD ACRS                 PA                                                                         .
H Street MNBB h 7)
SECY                                                                                             i OGC                   Air Rights M /L       Regional Offices       MAIL                           i GPA CA SP                   RI //fb RIV /r To     ADM: Doc. Mgt. Br.
Phillips //fD EW M Willste /, S'O Chairman ec ED0 NRR OSP NMSS Comm. Roberts DED/ROGR NRR Comm. Bernthal OGC Comm. Carr RM i
RII g RV h re         PDR       OI RIII 411p             RES       OIA PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL PUBLICLY ANNSUNCED.           0 01710220076 871015 F4jm   I 8cE EN-87-086           PDR   g                                                         [1 ,M4
Comm. Rogers AEOD ACRS PA SECY i
____ _ _ _ _ _ _ _ _ _ . . _ _ _                                                                                              _;}}
OGC Air Rights M /L Regional Offices MAIL GPA SP RI //fb RIV /r To ADM: Doc. Mgt. Br.
CA RII g RV h re PDR OI RIII 411p RES OIA PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL PUBLICLY ANNSUNCED.
0 01710220076 871015
[1,M4 F4jm I 8cE EN-87-086 PDR g
_;}}

Latest revision as of 03:15, 3 December 2024

EN-87-086:on 871019,order & Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $225,000 Will Be Issued Based on Loss of Emergency Boration Flow Paths & Failure of Personnel to Follow Procedures
ML20236A151
Person / Time
Site: Turkey Point  
Issue date: 10/15/1987
From: Lieberman J, Luehman J
NRC OFFICE OF ENFORCEMENT (OE)
To:
References
EA-87-085, EA-87-85, EN-87-086, EN-87-86, NUDOCS 8710220076
Download: ML20236A151 (1)


Text

--

n October 15, 1987 q

b; EN 87-86 1

0FFICE OF ENFORCEMENT I

NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Florida Power and Light Company (EA 87-05) g (Turkey Point, Units 3 and 4) s Docket Nos. 504 50g 50-251 gg subject:

ORDER AND NOTICE OF VIOLATION AND PROPOSED IMPOSITION C2 b L

OF CIVIL PENALTY - $225,000

?

j This is to infom the Commission that an Order and Notice of Violation a ca" I

Proposed Imposition of Civil Penalty in the amount of Two Hundred and Tw y

Five Thousand Collars ($225,000) will be issued on or about October 19, 7

to Florida Power end Light Company.

The Order confirms the licensee's alan to

)

have an independent third party review activities at Turkey Point and t1e 1

company's corporate offices to determine the root causes of the facility's j

poor past performance. Further, the Order directs the licensee to put in i

place a corporate operations audit program until the results of the independent q

appraisal have been received.

The Notice of Violation and Proposed Imposition of Civil Penalty is based on three violations including (1) loss of emergency boration flow paths for b0th units because of the failure of operations personnel s

to use or follow approved procedures, (2) isolation of the backup nitrogen system for the Unit 4 Auxiliary Feedwater System flow control valves for approximate.ly 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />, again due to failure to follow approved procedures, and (3) operation of the Unit 3 Intake Cooling Water System outside the plant design basis because of poor communications among members of the plant staff.

I It should be noted that the licensee has not been specifically informed of the enforcement action.

The schedule of issuance and notification is:

l Mailing of Notice October 19, 1987 Telephone Notification of Licensee October 19, 1987 The State of Florida will be notified.

The licensee has thirty days from the date of the Notice in which to respond.

)

Followirg,NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.

Contact:

J. Luehman, OE 28822-J. Lieberman, OE 28214 Distribution:

H Street MNBB h 7)

Phillips //fD EW M Willste /, S'O Chairman ec ED0 NRR OSP NMSS Comm. Roberts DED/ROGR NRR Comm. Bernthal OGC Comm. Carr RM i

Comm. Rogers AEOD ACRS PA SECY i

OGC Air Rights M /L Regional Offices MAIL GPA SP RI //fb RIV /r To ADM: Doc. Mgt. Br.

CA RII g RV h re PDR OI RIII 411p RES OIA PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL PUBLICLY ANNSUNCED.

0 01710220076 871015

[1,M4 F4jm I 8cE EN-87-086 PDR g

_;