ML20236C375: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:..   , ,
{{#Wiki_filter:..
-                                            JUL 2 31987 3
JUL 2 31987 3
Docket No. 50-237 Docket No. 50-249-Commonwealth Edison Company ATTN:     Mr. Cordell Reed Senior Vice President Post Office Box 767.
Docket No. 50-237 Docket No. 50-249-Commonwealth Edison Company ATTN:
Mr. Cordell Reed Senior Vice President Post Office Box 767.
Chicago,.IL 60690
Chicago,.IL 60690


==Dear Mr. Reed:==
==Dear Mr. Reed:==
==SUBJECT:==
==SUBJECT:==
REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. Steven Styles, Training Supervisor, and Mr. Gregory M. Nejfelt, Nuclear Regulatory Commission, on July 15 and 16, 1987, arrangements were made for an evaluation of the requalification program at the Dresden Nuclear Power Station. The evaluation visit is scheduled for the weeks of October 19 and 26, 1987.
REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. Steven Styles, Training Supervisor, and Mr. Gregory M. Nejfelt, Nuclear Regulatory Commission, on July 15 and 16, 1987, arrangements were made for an evaluation of the requalification program at the Dresden Nuclear Power Station.
For this visit, the NRC examiner will administer NRC prepared written examinations and operating tests. When the NRC examiner arrives at the site, he will meet with the appropriate facility personnel to review the schedule for these examinations. For the examiner to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," at least 60 days prior to the examination date. Mr. Styles has been advised of our reference material-requirements and where they are to be sent.
The evaluation visit is scheduled for the weeks of October 19 and 26, 1987.
For this visit, the NRC examiner will administer NRC prepared written examinations and operating tests.
When the NRC examiner arrives at the site, he will meet with the appropriate facility personnel to review the schedule for these examinations.
For the examiner to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," at least 60 days prior to the examination date.
Mr. Styles has been advised of our reference material-requirements and where they are to be sent.
This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989.
This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989.
Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D. C. 20503.
Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D. C. 20503.
Thank you for your consideration in this matter. If you have any questions on the evaluation process, please contact Gregory M. Nejfelt (312) 790-5528.
Thank you for your consideration in this matter.
Sincerely, 8707300034 870723                                             '/
If you have any questions on the evaluation process, please contact Gregory M. Nejfelt (312) 790-5528.
Charles W. H6hl, Chief PDR    ADDCK 05000237 V                     PDR                     Operations Branch
Sincerely, 8707300034 870723
'/
PDR ADDCK 05000237 Charles W. H6hl, Chief V
PDR Operations Branch


==Enclosure:==
==Enclosure:==
As stated See Attached Distribution Ye%
As stated See Attached Distribution Ye%
RIII             RIII         RIII               II   y h             ?N             brd/4%
RIII RIII RIII II y
Nejfelt/nma       Hills         Burdick             .I b Y                                                                 \\     Qn
h
?N brd/4%
Nejfelt/nma Hills Burdick
.I b Y
\\ \\
Qn


t' .. .
t' 1
l JUL al 31997 1
l JUL al 31997 1
Commonwealth Edison Company         2 Distribution                                                                                 l cc w/ enclosure:
Commonwealth Edison Company 2
D. Butterfield, Nuclear Licensing Nanager J. Eenigenburg, Plant Manager DCS/RSB (RIDS)                                                                             1 Licensing Fee Management Branch                                                           l
Distribution l
        ~ Resident . Inspector, RIII Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division                                                                   1
cc w/ enclosure:
D. Butterfield, Nuclear Licensing Nanager J. Eenigenburg, Plant Manager DCS/RSB (RIDS) 1 Licensing Fee Management Branch l
~ Resident. Inspector, RIII Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division 1
: 8. Zank,' Training Supervisor cc w/o enclosure:
: 8. Zank,' Training Supervisor cc w/o enclosure:
M. Grothenhuis, Project Manager, NRR J. N. Hannon, Branch Chief, OLB-M. A. Ring, Section Chief, DRP R. W. Cooper, NRR l
M. Grothenhuis, Project Manager, NRR J. N. Hannon, Branch Chief, OLB-M. A. Ring, Section Chief, DRP R. W. Cooper, NRR l
Line 48: Line 62:


l 1
l 1
L o                                                                                                     j ENCLOSURE 1 1
L o
REFERENCE MATERIAL REQUIREMENTS FOR REQUALIFICATION PROGRAM. EVALUATION                       l
j ENCLOSURE 1 1
: 1. An'index of administrative, operating, abnormal.and emergency procedures.
REFERENCE MATERIAL REQUIREMENTS FOR REQUALIFICATION PROGRAM. EVALUATION l
: 2. All' administrative procedures (as applicable to reactor. operation or                       )
1.
safety)                                                                                     1
An'index of administrative, operating, abnormal.and emergency procedures.
: 3. All integrated plant procedures (normal or general operating procedures)                     ;
2.
                                                                                                        )
All' administrative procedures (as applicable to reactor. operation or
: 4. Emergency procedures (emergency instructions, abnormal, or special procedures)                                                                                 l
)
: 5.   -Standing orders (important orders which are safety-related to and may supersede t5e regular procedures)
safety) 1 3.
: 6. Fuel-handling and core-loading procedures (initial core-loading                             ,
All integrated plant procedures (normal or general operating procedures)
)
4.
Emergency procedures (emergency instructions, abnormal, or special procedures) l 5.
-Standing orders (important orders which are safety-related to and may supersede t5e regular procedures) 6.
Fuel-handling and core-loading procedures (initial core-loading
~,
procedure, when appropriate).
procedure, when appropriate).
                                                                                                      ~
7.
: 7. Annunciator procedures (alarm procedures, including set points)                             l
Annunciator procedures (alarm procedures, including set points) l i
: 8. Radiation protection manual (radiation control manual or procedures)                       i
8.
: 9.   -Emergency plan
Radiation protection manual (radiation control manual or procedures) 9.
: 10. Technical Specifications                                                                   l
-Emergency plan 10.
: 11. Plant technical data (curve) book
Technical Specifications l
: 12. Lesson plans (training manuals, learning objectives, plant orientation manual, systems descriptions)
11.
: 13. Systems operating procedures                                                               ,
Plant technical data (curve) book 12.
f
Lesson plans (training manuals, learning objectives, plant orientation manual, systems descriptions) 13.
: 14. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
Systems operating procedures f
: 15. Copies of facility R0 and SR0 requalification examinations administered                     y during the past 2 years
14.
: 16. Simulator malfunction list with descriptive summary of malfunction effects.
Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams 15.
All of .the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.
Copies of facility R0 and SR0 requalification examinations administered y
during the past 2 years 16.
Simulator malfunction list with descriptive summary of malfunction effects.
All of.the above referenced material should be approved, final issues and should be so marked.
Uncontrolled, preliminary, or other such issues will not be acceptable.
All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.
a}}
a}}

Latest revision as of 02:50, 3 December 2024

Informs of Visit to Evaluate Requalification Program During Wks of 871019 & 26,per 870715-16 Telcons W/S Styles.Written Exams & Operating Tests Will Be Administered.List of Necessary Ref Matls Encl
ML20236C375
Person / Time
Site: Dresden  
Issue date: 07/23/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8707300034
Download: ML20236C375 (3)


Text

..

JUL 2 31987 3

Docket No. 50-237 Docket No. 50-249-Commonwealth Edison Company ATTN:

Mr. Cordell Reed Senior Vice President Post Office Box 767.

Chicago,.IL 60690

Dear Mr. Reed:

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. Steven Styles, Training Supervisor, and Mr. Gregory M. Nejfelt, Nuclear Regulatory Commission, on July 15 and 16, 1987, arrangements were made for an evaluation of the requalification program at the Dresden Nuclear Power Station.

The evaluation visit is scheduled for the weeks of October 19 and 26, 1987.

For this visit, the NRC examiner will administer NRC prepared written examinations and operating tests.

When the NRC examiner arrives at the site, he will meet with the appropriate facility personnel to review the schedule for these examinations.

For the examiner to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," at least 60 days prior to the examination date.

Mr. Styles has been advised of our reference material-requirements and where they are to be sent.

This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989.

Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D. C. 20503.

Thank you for your consideration in this matter.

If you have any questions on the evaluation process, please contact Gregory M. Nejfelt (312) 790-5528.

Sincerely, 8707300034 870723

'/

PDR ADDCK 05000237 Charles W. H6hl, Chief V

PDR Operations Branch

Enclosure:

As stated See Attached Distribution Ye%

RIII RIII RIII II y

h

?N brd/4%

Nejfelt/nma Hills Burdick

.I b Y

\\ \\

Qn

t' 1

l JUL al 31997 1

Commonwealth Edison Company 2

Distribution l

cc w/ enclosure:

D. Butterfield, Nuclear Licensing Nanager J. Eenigenburg, Plant Manager DCS/RSB (RIDS) 1 Licensing Fee Management Branch l

~ Resident. Inspector, RIII Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division 1

8. Zank,' Training Supervisor cc w/o enclosure:

M. Grothenhuis, Project Manager, NRR J. N. Hannon, Branch Chief, OLB-M. A. Ring, Section Chief, DRP R. W. Cooper, NRR l

4 l

_______-__Q

l 1

L o

j ENCLOSURE 1 1

REFERENCE MATERIAL REQUIREMENTS FOR REQUALIFICATION PROGRAM. EVALUATION l

1.

An'index of administrative, operating, abnormal.and emergency procedures.

2.

All' administrative procedures (as applicable to reactor. operation or

)

safety) 1 3.

All integrated plant procedures (normal or general operating procedures)

)

4.

Emergency procedures (emergency instructions, abnormal, or special procedures) l 5.

-Standing orders (important orders which are safety-related to and may supersede t5e regular procedures) 6.

Fuel-handling and core-loading procedures (initial core-loading

~,

procedure, when appropriate).

7.

Annunciator procedures (alarm procedures, including set points) l i

8.

Radiation protection manual (radiation control manual or procedures) 9.

-Emergency plan 10.

Technical Specifications l

11.

Plant technical data (curve) book 12.

Lesson plans (training manuals, learning objectives, plant orientation manual, systems descriptions) 13.

Systems operating procedures f

14.

Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams 15.

Copies of facility R0 and SR0 requalification examinations administered y

during the past 2 years 16.

Simulator malfunction list with descriptive summary of malfunction effects.

All of.the above referenced material should be approved, final issues and should be so marked.

Uncontrolled, preliminary, or other such issues will not be acceptable.

All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.

a