ML20236H983: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_ _-
{{#Wiki_filter:_ _-
              9
-
        -
9
        ,
,
                                                            JUL 18IW
JUL 18IW
                  In Reply Refer To:
In Reply Refer To:
                  Dockets:   50-313/87-21
Dockets:
                              50-368/87-21
50-313/87-21
                ' Arkansas Power & Light Company
50-368/87-21
                ATTN:     Gene Campbell, Vice President -
' Arkansas Power & Light Company
                              Nuclear Operations
ATTN:
                  P. 0.. Box 551-
Gene Campbell, Vice President -
                  Little Rock, Arkansas 72203
Nuclear Operations
                  Gentlemen:
P. 0.. Box 551-
                This refers to the inspection conducted by Messrs. P. H. Harrell and
Little Rock, Arkansas 72203
                  C. C. Harbuck of this office during the period July 6-10, 1987, of at.tivities
Gentlemen:
                  authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
This refers to the inspection conducted by Messrs. P. H. Harrell and
                  Units 1 and 2, and to the discussion of our findings with Mr. J. M. Levine and
C. C. Harbuck of this office during the period July 6-10, 1987, of at.tivities
                  other membrs of your staff at the conclusion of the inspection.
authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
                  Areas examined during the inspection i~cluded
Units 1 and 2, and to the discussion of our findings with Mr. J. M. Levine and
                                                            n          licensed-operator training and
other membrs of your staff at the conclusion of the inspection.
                  requalification programs, and the nonlicensed staff training program. Within
Areas examined during the inspection i~cluded licensed-operator training and
                  these areas, the inspection consisted 0:7 selective examination of procedures and
n
                  representative records, interviews with personnel, and observations by the NRC
requalification programs, and the nonlicensed staff training program.
                  inspectors. The inspection findings are documentec! in the enclosed inspection
Within
                  report.
these areas, the inspection consisted 0:7 selective examination of procedures and
                  During this inspection, it was found that certain of your activities were
representative records, interviews with personnel, and observations by the NRC
                  potential violations of NRC requirements.       However, since the potential
inspectors.
                  violations are related to training, they are not cited herein as violations but
The inspection findings are documentec! in the enclosed inspection
                  are considered to be unresolved items in accordance with the Commission Policy
report.
                  Statement on Training and Qualification of Nuclear Power Plant Personnel
During this inspection, it was found that certain of your activities were
                  (50 FR 11147). No response is required; however, your attention to the
potential violations of NRC requirements.
                  unresolved items that have the potential of becoming violations in the future is
However, since the potential
                  warranted.     The unresolved items.are identified in paragraph 4 of the enclosed
violations are related to training, they are not cited herein as violations but
                  inspection report.
are considered to be unresolved items in accordance with the Commission Policy
                  We have also examined actions you have taken with regard to previously
Statement on Training and Qualification of Nuclear Power Plant Personnel
                  identified inspection findings.       The status of these items is identified in
(50 FR 11147).
                  paragraph 2 of the enclosed report.
No response is required; however, your attention to the
                  Should you have any questions concerning this inspection, we will be pleased to
unresolved items that have the potential of becoming violations in the future is
                  discuss them with you.
warranted.
                                                              Sincerelydned
The unresolved items.are identified in paragraph 4 of the enclosed
                                                              Or%1as e       By
inspection report.
                                                                11. E. Gag!!ardo
We have also examined actions you have taken with regard to previously
                                                              J. E. Gagliardo, Chief                 ,
identified inspection findings.
                                                              Reactor Projects Branch                 '
The status of these items is identified in
                                                                                                      !
paragraph 2 of the enclosed report.
                  Enclosure:     (see next page)
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerelydned By
Or%1as e
11. E. Gag!!ardo
J. E. Gagliardo, Chief
,
Reactor Projects Branch
'
!
Enclosure:
(see next page)
l
l
                  RI/FCS           RI/Ak t     RI/ C       PI/           C:RPB     C:RPB   ,
RI/FCS
                  PHHarrell/nct CCHarbuck       RPMullikin   MEM Jhy p RHunter       JEGagl'     o   (
RI/Ak t
                1/y9(/87       W 7/y(/87       '"]/f/87     1/p2/87       y/;f/87   7 /sk'/
RI/ C
                            B708060011 870728
PI/
                            PDR   ADOCK 05000313
C:RPB
                            o                   PDR
C:RPB
    _ _ _ _ _                                                                                       !
,
(
PHHarrell/nct CCHarbuck
RPMullikin
MEM Jhy p RHunter
JEGagl'
o
1/y9(/87
W 7/y(/87
'"]/f/87
1/p2/87
y/;f/87
7 /sk'/
B708060011 870728
PDR
ADOCK 05000313
o
PDR
_ _ _ _ _
!


                      _-_ __-
_-_ __-
                                                                                                                ,
_
                                                              _
,
                                                                                                                  !
!
                              ',
',
                . .
. .
                                                                                                                  !
I
                                                                                                                  I
Arkansas Power & Light Company
                                                                                                                  l
-2-
                                Arkansas Power & Light Company                   -2-                           J
J
                                                                                                                  !
Enclosure:
                                Enclosure:
Appendix - NRC Inspection Report
                                Appendix - NRC Inspection Report                                                 ,
,
                                                                                                                o
50-313/87-21
                                              50-313/87-21
o
                                              50-368/87-21                                                       j
50-368/87-21
                                                                                                                  !
j
                                cc w/ enclosure:                                                                 i
!
                                J. M. Levine, Director                                                           l
cc w/ enclosure:
                                              Site Nuclear Operations
i
                                Arkansas Nuclear One                                                             )
J. M. Levine, Director
                                                                                                                  j
Site Nuclear Operations
                                P. 0; Box 608                                                                   (
)
                                Russellville, Arkansas               72801                                     j
Arkansas Nuclear One
                                                                                                                  i
j
                                Arkansas Radiation Control Program Director                                   .J
P. 0; Box 608
                                bcc to DMB (IE01)                                                               ;
(
                                bec distrib. by RIV:
Russellville, Arkansas
                                *RPB                           *RRI                     Robert D. Martin, RA   l
72801
                                *EP&RPB                         *Section Chief (RPB/B)   *D. Weiss, RM/ALF.     )
j
                                *RIV                             DRSP                   *RSB                     '
i
                                * MIS SYSTEM                   *RSTS Operator           * Project Inspector
Arkansas Radiation Control Program Director
                                *R. Hall                       *P. Harrell, Ft. Calhoun Bob Lee (NRR)         4
.J
                                                                                          George Dick (NRR)       i
bcc to DMB (IE01)
                                *w/766
;
                                                                                                                ;
bec distrib. by RIV:
m_____._____________.             . _ _ _ _ _ _ . _ . _ . _ .                                                   $
*RPB
*RRI
Robert D. Martin, RA
*EP&RPB
*Section Chief (RPB/B)
*D. Weiss, RM/ALF.
)
*RIV
DRSP
*RSB
'
* MIS SYSTEM
*RSTS Operator
* Project Inspector
*R. Hall
*P.
Harrell, Ft. Calhoun
Bob Lee (NRR)
4
George Dick (NRR)
i
*w/766
;
m_____._____________.
. _ _ _ _ _ _ . _ . _ . _ .
$
}}
}}

Latest revision as of 01:43, 3 December 2024

Forwards Insp Repts 50-313/87-21 & 50-368/87-21 on 870706-10.Potential Violations of NRC Requirements Re Training Noted
ML20236H983
Person / Time
Site: Arkansas Nuclear  
Issue date: 07/28/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20236H985 List:
References
NUDOCS 8708060011
Download: ML20236H983 (2)


See also: IR 05000313/1987021

Text

_ _-

-

9

,

JUL 18IW

In Reply Refer To:

Dockets:

50-313/87-21

50-368/87-21

' Arkansas Power & Light Company

ATTN:

Gene Campbell, Vice President -

Nuclear Operations

P. 0.. Box 551-

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. P. H. Harrell and

C. C. Harbuck of this office during the period July 6-10, 1987, of at.tivities

authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,

Units 1 and 2, and to the discussion of our findings with Mr. J. M. Levine and

other membrs of your staff at the conclusion of the inspection.

Areas examined during the inspection i~cluded licensed-operator training and

n

requalification programs, and the nonlicensed staff training program.

Within

these areas, the inspection consisted 0:7 selective examination of procedures and

representative records, interviews with personnel, and observations by the NRC

inspectors.

The inspection findings are documentec! in the enclosed inspection

report.

During this inspection, it was found that certain of your activities were

potential violations of NRC requirements.

However, since the potential

violations are related to training, they are not cited herein as violations but

are considered to be unresolved items in accordance with the Commission Policy

Statement on Training and Qualification of Nuclear Power Plant Personnel

(50 FR 11147).

No response is required; however, your attention to the

unresolved items that have the potential of becoming violations in the future is

warranted.

The unresolved items.are identified in paragraph 4 of the enclosed

inspection report.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerelydned By

Or%1as e

11. E. Gag!!ardo

J. E. Gagliardo, Chief

,

Reactor Projects Branch

'

!

Enclosure:

(see next page)

l

RI/FCS

RI/Ak t

RI/ C

PI/

C:RPB

C:RPB

,

(

PHHarrell/nct CCHarbuck

RPMullikin

MEM Jhy p RHunter

JEGagl'

o

1/y9(/87

W 7/y(/87

'"]/f/87

1/p2/87

y/;f/87

7 /sk'/

B708060011 870728

PDR

ADOCK 05000313

o

PDR

_ _ _ _ _

!

_-_ __-

_

,

!

',

. .

I

Arkansas Power & Light Company

-2-

J

Enclosure:

Appendix - NRC Inspection Report

,

50-313/87-21

o

50-368/87-21

j

!

cc w/ enclosure:

i

J. M. Levine, Director

Site Nuclear Operations

)

Arkansas Nuclear One

j

P. 0; Box 608

(

Russellville, Arkansas

72801

j

i

Arkansas Radiation Control Program Director

.J

bcc to DMB (IE01)

bec distrib. by RIV:

  • RPB
  • RRI

Robert D. Martin, RA

  • EP&RPB
  • Section Chief (RPB/B)
  • D. Weiss, RM/ALF.

)

  • RIV

DRSP

  • RSB

'

  • MIS SYSTEM
  • RSTS Operator
  • Project Inspector
  • R. Hall
  • P.

Harrell, Ft. Calhoun

Bob Lee (NRR)

4

George Dick (NRR)

i

  • w/766

m_____._____________.

. _ _ _ _ _ _ . _ . _ . _ .

$