TXX-7000, Deficiency Rept CP-87-24 Re Containment Liner Nelson Stud Bending in Excess of FSAR Requirements.Initially Reported on 870629.Evaluation Continuing.Next Rept Anticipated by 880210: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_- - - | {{#Wiki_filter:_- - - | ||
M | M== | ||
Log # TXX-7000 | |||
.d File # 10110 | |||
_= | |||
wmiam c. coun u | = | ||
906.2 nlELECTRIC | |||
"'''#I0""U'00('} | |||
wmiam c. coun u November 25, 1987 ILxuthe %' Pinident U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. | |||
20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 27: | Line 31: | ||
DOCKET N05. 50-445 AND 50-446 CONTAINMENT LINER NELSON STUD BENDING SDAR: CP-87-24 (INTERIM REPORT) | DOCKET N05. 50-445 AND 50-446 CONTAINMENT LINER NELSON STUD BENDING SDAR: CP-87-24 (INTERIM REPORT) | ||
Gentlemen: | Gentlemen: | ||
On June 29, 1987, we verbally notified your Mr. H. S. Phillips of a deticiency involving engineering approval provided to allow bending of Nelson Stud anchors on the containment liner in excess of FSAR requirements. Our latest interim report on this issue, logged TXX-6696, was submitted on August 27, 1987. | On June 29, 1987, we verbally notified your Mr. H. S. Phillips of a deticiency involving engineering approval provided to allow bending of Nelson Stud anchors on the containment liner in excess of FSAR requirements. | ||
Our latest interim report on this issue, logged TXX-6696, was submitted on August 27, 1987. | |||
We are continuing our evaluation and anticipate submitting our next report by February 10, 1988. | We are continuing our evaluation and anticipate submitting our next report by February 10, 1988. | ||
Very truly yours, W . C . C. . | Very truly yours, W. C. C.. | ||
W. G. Counsil By: M. h -/ | W. G. Counsil By: M. h -/ | ||
JGfn W. Beck Vice President, Nuclear Engineering JCH/grr c - Mr. IL D. Martin, Region IV Resident inspectors, CPSES (3) kk 0 | JGfn W. Beck Vice President, Nuclear Engineering JCH/grr c - Mr. IL D. Martin, Region IV Resident inspectors, CPSES (3) kk | ||
[ | |||
400 North Olne Street | 0 | ||
.cg 2-7 l | |||
l l} D 400 North Olne Street LI3 HI D:slie. Texas 75201 g | |||
_}} | |||
Latest revision as of 23:58, 2 December 2024
| ML20236S820 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/25/1987 |
| From: | Beck J, Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-87-24, TXX-7000, NUDOCS 8711300112 | |
| Download: ML20236S820 (1) | |
Text
_- - -
M==
Log # TXX-7000
.d File # 10110
_=
=
906.2 nlELECTRIC
"#I0""U'00('}
wmiam c. coun u November 25, 1987 ILxuthe %' Pinident U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCllE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 CONTAINMENT LINER NELSON STUD BENDING SDAR: CP-87-24 (INTERIM REPORT)
Gentlemen:
On June 29, 1987, we verbally notified your Mr. H. S. Phillips of a deticiency involving engineering approval provided to allow bending of Nelson Stud anchors on the containment liner in excess of FSAR requirements.
Our latest interim report on this issue, logged TXX-6696, was submitted on August 27, 1987.
We are continuing our evaluation and anticipate submitting our next report by February 10, 1988.
Very truly yours, W. C. C..
W. G. Counsil By: M. h -/
JGfn W. Beck Vice President, Nuclear Engineering JCH/grr c - Mr. IL D. Martin, Region IV Resident inspectors, CPSES (3) kk
[
0
.cg 2-7 l
l l} D 400 North Olne Street LI3 HI D:slie. Texas 75201 g
_