TXX-7008, Interim Deficiency Rept CP-87-83 Re Seismic Analysis of Svc Water Discharge Structure.Initially Reported on 870902. Evaluation Continuing.Next Rept Will Be Submitted No Later than 880215: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
{{#Wiki_filter:- __. | {{#Wiki_filter:- __. | ||
E log # TXX-7008 Fi1e # 10110 | E log # TXX-7008 Fi1e # 10110 | ||
.= | |||
= | |||
903.8 HlELECTR/C-Ref. # 10CFR50.55(e) | |||
. wmiam c. counsu November 30, 1987 Executive Vice Preshkat V. S. Nuclear Regulatory Commission Attn: Document Control Desk | |||
. Washington, D. C. | |||
20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 26: | Line 29: | ||
DOCKET NOS. 50-445 AND 50-446 SEISMIC ANALYSIS OF SERVICE WATER DISCHARGE STRUCTURE SDAR: CP-87-83 (IN1ERIM REPORT) | DOCKET NOS. 50-445 AND 50-446 SEISMIC ANALYSIS OF SERVICE WATER DISCHARGE STRUCTURE SDAR: CP-87-83 (IN1ERIM REPORT) | ||
Gentlemen: | Gentlemen: | ||
On September 2, 1987, we verbally notified your Mr. H. S. Phillips of a deficiency identified during the design validation piocess involving the Service Water Discharge Structure. This is an intarim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our last report on this issue was logged TXX-6800, dated October 2, 1987. | On September 2, 1987, we verbally notified your Mr. H. S. Phillips of a deficiency identified during the design validation piocess involving the Service Water Discharge Structure. | ||
This is an intarim report of a potentially reportable item under the provisions of 10CFR50.55(e). | |||
Our last report on this issue was logged TXX-6800, dated October 2, 1987. | |||
We are continuing our evaluation and our next report on this issue will be submitted no later than February 15, 1988. | We are continuing our evaluation and our next report on this issue will be submitted no later than February 15, 1988. | ||
Very truly yours, 4/,6, Cou.nScE W. G. Counsil-By: | Very truly yours, 4/,6, Cou.nScE W. G. Counsil-By: | ||
J."S. Marshall Supervisor, Generic Licensing CBC/grr l | J."S. Marshall Supervisor, Generic Licensing CBC/grr l | ||
c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) i m oMaM E6sjyp | c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) i m oMaM E6sjyp S*O S | ||
S*O 400 North Olne Street LB 81 | h 400 North Olne Street LB 81 Dallas, Texas 73201 | ||
. _ - _ - - - _ _ _ - _.}} | |||
Latest revision as of 21:06, 2 December 2024
| ML20236V596 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/30/1987 |
| From: | Counsil W, John Marshall TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-87-83, TXX-7008, NUDOCS 8712040396 | |
| Download: ML20236V596 (1) | |
Text
- __.
E log # TXX-7008 Fi1e # 10110
.=
=
903.8 HlELECTR/C-Ref. # 10CFR50.55(e)
. wmiam c. counsu November 30, 1987 Executive Vice Preshkat V. S. Nuclear Regulatory Commission Attn: Document Control Desk
. Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 SEISMIC ANALYSIS OF SERVICE WATER DISCHARGE STRUCTURE SDAR: CP-87-83 (IN1ERIM REPORT)
Gentlemen:
On September 2, 1987, we verbally notified your Mr. H. S. Phillips of a deficiency identified during the design validation piocess involving the Service Water Discharge Structure.
This is an intarim report of a potentially reportable item under the provisions of 10CFR50.55(e).
Our last report on this issue was logged TXX-6800, dated October 2, 1987.
We are continuing our evaluation and our next report on this issue will be submitted no later than February 15, 1988.
Very truly yours, 4/,6, Cou.nScE W. G. Counsil-By:
J."S. Marshall Supervisor, Generic Licensing CBC/grr l
c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) i m oMaM E6sjyp S*O S
h 400 North Olne Street LB 81 Dallas, Texas 73201
. _ - _ - - - _ _ _ - _.