TXX-6720, Interim Deficiency Rept CP-86-55 Re Seismic Air Gap Design Adequacy Between Auxiliary Bldg & Unit 1 & 2 Containment Bldgs.Initially Reported on 860814.Evaluation Continuing. Next Rept Will Be Submitted by 871111: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:_ _ _
{{#Wiki_filter:_ _ _
                                                                                        .--.                  Log # TXX-6720
Log # TXX-6720
                                                                                  ==
 
File # 10110
==
                                                                                  --      2                          903.7 E       C___                Ref: 10CFR50.5S(e) 1UELECTRIC William G. Counsil Execuuve Vwe l'resuknr U. S. Nuclear Regulatory Commission Attn: Document Control Desk                                                                   .c Washington, D.C. 20555                                                                       m
File # 10110 2
                                                                                                                                >      . c. 1
903.7 E
C Ref: 10CFR50.5S(e) 1UELECTRIC William G. Counsil Execuuve Vwe l'resuknr U. S. Nuclear Regulatory Commission Attn: Document Control Desk
.c Washington, D.C. 20555 m
. c.
1


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446                                                 ;    Y, SEISMIC AIR GAP DESIGN ADEQUACY                                               ,
DOCKET NOS. 50-445 AND 50-446 Y,
                                                                                                                                        .2 SDAR: CP-86-55 (INTERIM REPORT)                                             gQ i
SEISMIC AIR GAP DESIGN ADEQUACY
Gentlemen:                                                                                   g:
.2 SDAR: CP-86-55 (INTERIM REPORT) gQ i
On August 14, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving the seismic air gap design adequacy between the Auxiliary Building and Units 1 and 2 Containment Buildings. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our latest interim report, logged TXX-6553, was submitted on July 8, 1987.
Gentlemen:
i We are continuing our evaluation of the impact of this issue upon the safety                               l of plant operations.
g:
On August 14, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving the seismic air gap design adequacy between the Auxiliary Building and Units 1 and 2 Containment Buildings. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
Our latest interim report, logged TXX-6553, was submitted on July 8, 1987.
i We are continuing our evaluation of the impact of this issue upon the safety l
of plant operations.
Our next report on the issue will be submitted no later than November 11, 1987.
Our next report on the issue will be submitted no later than November 11, 1987.
Very truly yours,                           i ppfgz W. G. Counsil JCH/mlh c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 8709160090 070911 PDR     ADOCK 05000445 S                           PDR                                                                           )e k!'
Very truly yours, i
                                                                                                                                /     If
ppfgz W. G. Counsil JCH/mlh c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 8709160090 070911 PDR ADOCK 05000445
                                                                .m North Olive Street LB 81 Dallas. Texas 75201
)e S
PDR k!'
/
If
.m North Olive Street LB 81 Dallas. Texas 75201


o-M df' en O $   8 U        Lt>
o-M df' enO $
E       -
8U Lt>
Z (n L D N lii
E Z(n L D N lii
__ - _ _ - -    -.}}
-.}}

Latest revision as of 06:17, 2 December 2024

Interim Deficiency Rept CP-86-55 Re Seismic Air Gap Design Adequacy Between Auxiliary Bldg & Unit 1 & 2 Containment Bldgs.Initially Reported on 860814.Evaluation Continuing. Next Rept Will Be Submitted by 871111
ML20238F339
Person / Time
Site: Comanche Peak  
Issue date: 09/11/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-55, TXX-6720, NUDOCS 8709160090
Download: ML20238F339 (1)


Text

_ _ _

Log # TXX-6720

==

File # 10110 2

903.7 E

C Ref: 10CFR50.5S(e) 1UELECTRIC William G. Counsil Execuuve Vwe l'resuknr U. S. Nuclear Regulatory Commission Attn: Document Control Desk

.c Washington, D.C. 20555 m

. c.

1

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 Y,

SEISMIC AIR GAP DESIGN ADEQUACY

.2 SDAR: CP-86-55 (INTERIM REPORT) gQ i

Gentlemen:

g:

On August 14, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving the seismic air gap design adequacy between the Auxiliary Building and Units 1 and 2 Containment Buildings. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

Our latest interim report, logged TXX-6553, was submitted on July 8, 1987.

i We are continuing our evaluation of the impact of this issue upon the safety l

of plant operations.

Our next report on the issue will be submitted no later than November 11, 1987.

Very truly yours, i

ppfgz W. G. Counsil JCH/mlh c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 8709160090 070911 PDR ADOCK 05000445