TXX-6720, Interim Deficiency Rept CP-86-55 Re Seismic Air Gap Design Adequacy Between Auxiliary Bldg & Unit 1 & 2 Containment Bldgs.Initially Reported on 860814.Evaluation Continuing. Next Rept Will Be Submitted by 871111

From kanterella
(Redirected from TXX-6720)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-55 Re Seismic Air Gap Design Adequacy Between Auxiliary Bldg & Unit 1 & 2 Containment Bldgs.Initially Reported on 860814.Evaluation Continuing. Next Rept Will Be Submitted by 871111
ML20238F339
Person / Time
Site: Comanche Peak  
Issue date: 09/11/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-55, TXX-6720, NUDOCS 8709160090
Download: ML20238F339 (1)


Text

_ _ _

Log # TXX-6720

==

File # 10110 2

903.7 E

C Ref: 10CFR50.5S(e) 1UELECTRIC William G. Counsil Execuuve Vwe l'resuknr U. S. Nuclear Regulatory Commission Attn: Document Control Desk

.c Washington, D.C. 20555 m

. c.

1

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 Y,

SEISMIC AIR GAP DESIGN ADEQUACY

.2 SDAR: CP-86-55 (INTERIM REPORT) gQ i

Gentlemen:

g:

On August 14, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving the seismic air gap design adequacy between the Auxiliary Building and Units 1 and 2 Containment Buildings. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

Our latest interim report, logged TXX-6553, was submitted on July 8, 1987.

i We are continuing our evaluation of the impact of this issue upon the safety l

of plant operations.

Our next report on the issue will be submitted no later than November 11, 1987.

Very truly yours, i

ppfgz W. G. Counsil JCH/mlh c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 8709160090 070911 PDR ADOCK 05000445