ND-20-1014, Vogtie Electric Generating Plant, Unit 3, ITAAC Closure Notification on Completion of 2.1.02.09b.ii (Index Number 043): Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Southern Nuclear                               Michael J. Yox Regulatory Affairs Director 7825 River Road Waynesboro, GA 30830 Vogtie 3 & 4                706-848-6459 AUG 2 8 2020 Docket No.:     52-025 ND-20-1014 10 CFR 52.99(c)(1)
{{#Wiki_filter:Southern Nuclear Michael J. Yox Regulatory Affairs Director Vogtie 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6459 AUG 2 8 2020 Docket No.:
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtie Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of 2.1.02.09b.ii [Index Number 0431 Ladies and Gentlemen:
52-025 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 ND-20-1014 10 CFR 52.99(c)(1)
In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC)of the completion of Vogtie Electric Generating Plant(VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.1.02.09b.ii [Index Number 043]. This ITAAC confirms controls in the main control room operate to cause the pressurizer spray valves to open and close. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.
Southern Nuclear Operating Company Vogtie Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of 2.1.02.09b.ii [Index Number 0431 Ladies and Gentlemen:
In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtie Electric Generating Plant (VEGP) Unit 3
Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.1.02.09b.ii [Index Number 043]. This ITAAC confirms controls in the main control room operate to cause the pressurizer spray valves to open and close. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.
This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) request NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.
This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) request NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.
If there are any questions, please contact Tom Petrak at 706-848-1575.
If there are any questions, please contact Tom Petrak at 706-848-1575.
Line 25: Line 27:


==Enclosure:==
==Enclosure:==
Vogtie Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.1.02.09b.ii [Index Number 043]
MJY/RAS/sfr Vogtie Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.1.02.09b.ii [Index Number 043]
MJY/RAS/sfr


U.S. Nuclear Regulatory Commission ND-20-1014 Page 2 of 3 To:
U.S. Nuclear Regulatory Commission ND-20-1014 Page 2 of 3 To:
Line 33: Line 34:
Mr. M. D. Meier (w/o enclosures)
Mr. M. D. Meier (w/o enclosures)
Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:
Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:
Nuclear Requlatorv Commission M . C. P. Patel M . G. J. Khouri Ms. S. E. Temple M    N. D. Karlovich M    A. Lerch M    C. J. Even M    8. J. Kemker Ms. N. C. Coovert M    C. Welch M    J. Gaslevic M    V. Hall M    G. Armstrong M    M. Webb M    T. Fredette M    S. Smith M    C. Santos s. M. Bailey M    S. Rose M    B. Davis M    J. Vasquez M    J. Eargle Ms. K. Carrington M    P. Heher . M. King M    E. Davidson
Nuclear Requlatorv Commission M
M Ms. S. E. Temple M
M M
M Ms. N. C. Coovert M
M M
M M
M M
M M
M M
M M
M M
M
. C. P. Patel
. G. J. Khouri N. D. Karlovich A. Lerch C. J. Even
: 8. J. Kemker C. Welch J. Gaslevic V. Hall G. Armstrong M. Webb T. Fredette S. Smith C. Santos
: s. M. Bailey S. Rose B. Davis J. Vasquez J. Eargle Ms. K. Carrington P. Heher
. M. King E. Davidson


U.S. Nuclear Regulatory Commission ND-20-1014 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)
U.S. Nuclear Regulatory Commission ND-20-1014 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)
Line 39: Line 56:
Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NU8, Inc.
Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NU8, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GD8 Associates, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GD8 Associates, Inc.
Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L .Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch BIngham
Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L.Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch BIngham


U.S. Nuclear Regulatory Commission ND-20-1014 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-20-1014 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of iTAAC 2.1.02.09b.ii [index Number 043]
U.S. Nuclear Regulatory Commission ND-20-1014 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-20-1014 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of iTAAC 2.1.02.09b.ii [index Number 043]


U.S. Nuclear Regulatory Commission ND-20-1014 Enclosure Page 2 of 3 ITAAC Statement Design Commitment 9.b) The RCS provides the means to control system pressure.
U.S. Nuclear Regulatory Commission ND-20-1014 Enclosure Page 2 of 3 ITAAC Statement Design Commitment 9.b) The RCS provides the means to control system pressure.
Line 47: Line 64:
Acceptance Criteria ii) Controls in the MCR operate to cause the pressurizer spray valves to open and close.
Acceptance Criteria ii) Controls in the MCR operate to cause the pressurizer spray valves to open and close.
ITAAC Determination Basis Multiple ITAAC are performed to demonstrate that the Reactor Coolant System (RCS) provides the means to control system pressure. The subject ITAAC requires a test to verify that the pressurizer spray valves can open and close when operated from the Main Control Room (MCR).
ITAAC Determination Basis Multiple ITAAC are performed to demonstrate that the Reactor Coolant System (RCS) provides the means to control system pressure. The subject ITAAC requires a test to verify that the pressurizer spray valves can open and close when operated from the Main Control Room (MCR).
Testing was performed in accordance with Unit 3 plant interface testing work orders (References 1 and 2)for valve remote operability testing to demonstrate controls in the MCR operate to cause the pressurizer spray valves(RCS-PL-V110A and RCS-PL-V110B)to open and close. The valves were stroke tested using manual Plant Control System (PLS) controls from the MCR and local inspection verified the valves changed position as intended.
Testing was performed in accordance with Unit 3 plant interface testing work orders (References 1 and 2) for valve remote operability testing to demonstrate controls in the MCR operate to cause the pressurizer spray valves (RCS-PL-V110A and RCS-PL-V110B) to open and close. The valves were stroke tested using manual Plant Control System (PLS) controls from the MCR and local inspection verified the valves changed position as intended.
Unit 3 plant interface test results were reviewed (Reference 3) and confirmed that controls in the MCR operated to cause the pressurizer spray valves to open and close.
Unit 3 plant interface test results were reviewed (Reference 3) and confirmed that controls in the MCR operated to cause the pressurizer spray valves to open and close.
Reference 3 is available for NRC inspection as part of the Unit 3 ITAAC 2.1.02.09b.ii Completion Package (Reference 4).
Reference 3 is available for NRC inspection as part of the Unit 3 ITAAC 2.1.02.09b.ii Completion Package (Reference 4).
ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found that there are no relevant ITAAC findings associated with these ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.1.02.09b.ii Unit 3(Reference 3) and is available for NRC review.
ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found that there are no relevant ITAAC findings associated with these ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.1.02.09b.ii Unit 3 (Reference 3) and is available for NRC review.
ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.1.02.09b.ii was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.
ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.1.02.09b.ii was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.


U.S. Nuclear Regulatory Commission ND-20-1014 Enclosure Page 3 of 3 Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.
U.S. Nuclear Regulatory Commission ND-20-1014 Enclosure Page 3 of 3 Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.
References favailable for NRG inspection)
References favailable for NRG inspection)
: 1. WO 1055109,"Perform Plant Interface Testing of SV3-RCS-PL-V110A"
: 1. WO 1055109, "Perform Plant Interface Testing of SV3-RCS-PL-V110A"
: 2. WO 1055111,"Perform Plant Interface Testing of SV3-RCS-PL-V110B"
: 2. WO 1055111, "Perform Plant Interface Testing of SV3-RCS-PL-V110B"
: 3. SV3-RCS-ITR-800043, Revision 0,"Unit 3 Recorded Results for RCS Pressurizer Spray Valves Open and Close from the Main Control Room: 2.1.02.09b.ii"
: 3. SV3-RCS-ITR-800043, Revision 0, "Unit 3 Recorded Results for RCS Pressurizer Spray Valves Open and Close from the Main Control Room: 2.1.02.09b.ii"
: 4. 2.1.02.09b.ii-U3-CP-RevO, ITAAC Completion Package}}
: 4. 2.1.02.09b.ii-U3-CP-RevO, ITAAC Completion Package}}

Latest revision as of 04:40, 2 December 2024

Vogtie Electric Generating Plant, Unit 3, ITAAC Closure Notification on Completion of 2.1.02.09b.ii (Index Number 043)
ML20244A271
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/28/2020
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-20-1014
Download: ML20244A271 (6)


Text

Southern Nuclear Michael J. Yox Regulatory Affairs Director Vogtie 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6459 AUG 2 8 2020 Docket No.:

52-025 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 ND-20-1014 10 CFR 52.99(c)(1)

Southern Nuclear Operating Company Vogtie Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of 2.1.02.09b.ii [Index Number 0431 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtie Electric Generating Plant (VEGP) Unit 3

Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.1.02.09b.ii [Index Number 043]. This ITAAC confirms controls in the main control room operate to cause the pressurizer spray valves to open and close. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) request NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yox Regulatory Affairs/Director Vogtie 3 & 4

Enclosure:

MJY/RAS/sfr Vogtie Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.1.02.09b.ii [Index Number 043]

U.S. Nuclear Regulatory Commission ND-20-1014 Page 2 of 3 To:

Southern Nuclear Operating Company/Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Requlatorv Commission M

M Ms. S. E. Temple M

M M

M Ms. N. C. Coovert M

M M

M M

M M

M M

M M

M M

M M

M

. C. P. Patel

. G. J. Khouri N. D. Karlovich A. Lerch C. J. Even

8. J. Kemker C. Welch J. Gaslevic V. Hall G. Armstrong M. Webb T. Fredette S. Smith C. Santos
s. M. Bailey S. Rose B. Davis J. Vasquez J. Eargle Ms. K. Carrington P. Heher

. M. King E. Davidson

U.S. Nuclear Regulatory Commission ND-20-1014 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NU8, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GD8 Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L.Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch BIngham

U.S. Nuclear Regulatory Commission ND-20-1014 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-20-1014 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of iTAAC 2.1.02.09b.ii [index Number 043]

U.S. Nuclear Regulatory Commission ND-20-1014 Enclosure Page 2 of 3 ITAAC Statement Design Commitment 9.b) The RCS provides the means to control system pressure.

Inspections. Tests. Analyses ii) Tests will be performed to verify that the pressurizer spray valves can open and close when operated from the MCR.

Acceptance Criteria ii) Controls in the MCR operate to cause the pressurizer spray valves to open and close.

ITAAC Determination Basis Multiple ITAAC are performed to demonstrate that the Reactor Coolant System (RCS) provides the means to control system pressure. The subject ITAAC requires a test to verify that the pressurizer spray valves can open and close when operated from the Main Control Room (MCR).

Testing was performed in accordance with Unit 3 plant interface testing work orders (References 1 and 2) for valve remote operability testing to demonstrate controls in the MCR operate to cause the pressurizer spray valves (RCS-PL-V110A and RCS-PL-V110B) to open and close. The valves were stroke tested using manual Plant Control System (PLS) controls from the MCR and local inspection verified the valves changed position as intended.

Unit 3 plant interface test results were reviewed (Reference 3) and confirmed that controls in the MCR operated to cause the pressurizer spray valves to open and close.

Reference 3 is available for NRC inspection as part of the Unit 3 ITAAC 2.1.02.09b.ii Completion Package (Reference 4).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found that there are no relevant ITAAC findings associated with these ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.1.02.09b.ii Unit 3 (Reference 3) and is available for NRC review.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.1.02.09b.ii was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

U.S. Nuclear Regulatory Commission ND-20-1014 Enclosure Page 3 of 3 Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References favailable for NRG inspection)

1. WO 1055109, "Perform Plant Interface Testing of SV3-RCS-PL-V110A"
2. WO 1055111, "Perform Plant Interface Testing of SV3-RCS-PL-V110B"
3. SV3-RCS-ITR-800043, Revision 0, "Unit 3 Recorded Results for RCS Pressurizer Spray Valves Open and Close from the Main Control Room: 2.1.02.09b.ii"
4. 2.1.02.09b.ii-U3-CP-RevO, ITAAC Completion Package