ML20246C972: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:=nn,                                                   -    -                                                -      -
{{#Wiki_filter:=nn, 3
3
'& w g.
'& w                                               ^
j&
: g.     j&
^
f,                ,
ggg161989
ggg161989                                                 )
)
y -- :                                                                                                   1 l
f, 1
y -- :
l
(
(
y       (Georgia Power company-5 ATTN:',Mr. W.lG. Hairston, III-
y (Georgia Power company-5 ATTN:',Mr. W.lG. Hairston, III-
                                    -Senior Vice President'-
-Senior Vice President'-
Nuclear Operations                                                                 S LP. O.-Box'1295                                                                                   l
Nuclear Operations S
                      -Birmingham, AL ~35201
LP. O.-Box'1295 l
\                     -Gentlemen:                                                                         -c
-Birmingham, AL ~35201
\\
-Gentlemen:
- c


==SUBJECT:==
==SUBJECT:==
PLANT HATCH EMERGENCY PLAN REVIEW, DOCKET NOS. 50-321 AND 50-366 We. have completed our. review of Revision 9' to the Plant 1Hatth Emergency Plan, dated April 1989. Our review indicated inat the changes appear to meet the                     l
PLANT HATCH EMERGENCY PLAN REVIEW, DOCKET NOS. 50-321 AND 50-366 We. have completed our. review of Revision 9' to the Plant 1Hatth Emergency Plan, dated April 1989.
                      ' planning standards of' 10 CFR 50.47(b) and the requirements of- Appendix E to 10 CFR 50.
Our review indicated inat the changes appear to meet the l
Piease be . reminded that '10 CFR 50.54(q) requires that proposed changes .which decrease. the effectiveness . of - your Emergoney Plan - shall ' not- be implemented.
' planning standards of' 10 CFR 50.47(b) and the requirements of-Appendix E to 10 CFR 50.
                      . without application to and approval by the Commission. - However, changes may b'e
Piease be. reminded that '10 CFR 50.54(q) requires that proposed changes.which decrease. the effectiveness. of - your Emergoney Plan - shall ' not-be implemented.
                      -made without Commission approval if wch changes do not decrease the
. without application to and approval by the Commission. - However, changes may b'e
                      . effectiveness of the Plan, and the Plan, as changed, continues to meet the standards of 10~ CFR 50.47(b): and the requirements of Appendix E to 10 CFR 50.
-made without Commission approval if wch changes do not decrease the
                        .If:a change is made without approval, you.should furnish copies in acccrdance-with 10 CFR 50.54(q). Also, .any changes to the Emergency' Plan Implementing Procedures should be made in accorconce with the requirements to 10 CFR 50, Appendix E, Section V.
. effectiveness of the Plan, and the Plan, as changed, continues to meet the standards of 10~ CFR 50.47(b): and the requirements of Appendix E to 10 CFR 50.
Should you have any questions regarding this letter, please contact Mr. William H, Rankin of our staff ,at (404) 331-5618.
.If:a change is made without approval, you.should furnish copies in acccrdance-with 10 CFR 50.54(q).
                                                                    -Sincerely, origined Sigrcd by w.Rando fcc Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards L
Also,.any changes to the Emergency' Plan Implementing Procedures should be made in accorconce with the requirements to 10 CFR 50, Appendix E, Section V.
cc:     (See page 2) e 8908250201 8908.16 PDR   ADOCK 05000321 F                 PDC I\
Should you have any questions regarding this letter, please contact Mr. William H, Rankin of our staff,at (404) 331-5618.
w-__ - ___                         -        ___.        _
-Sincerely, origined Sigrcd by w.Rando fcc Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards L
MW
cc:
(See page 2) e 8908250201 8908.16 PDR ADOCK 05000321 F
PDC I \\
MW w-__ - ___


1
1
            -        -Georgia Power Company                                           2 1 l
-Georgia Power Company 2
cc:                         R. P. Mcdonald, Executive Vice President, Nuclear Operations J. T. Beckham,.Vice President Plant Hatch                         i H. C. Nix, General Manager             l Plant Hatch                         !
1 l
cc:
R. P. Mcdonald, Executive Vice President, Nuclear Operations J. T. Beckham,.Vice President Plant Hatch i
H. C. Nix, General Manager l
Plant Hatch
: 0. M. Fraser, Site Quality Assurance Manager J. Heidt, Manager, Nuclear Engineering and Licensing Plant Hatch S. B. Tipps, Manager of Nuclear Safety and Compliance State of Georgia bec: L. P. Crocker, NRR K. E Brockman, RII NRC Resident Inspector Locument Control Desk i
: 0. M. Fraser, Site Quality Assurance Manager J. Heidt, Manager, Nuclear Engineering and Licensing Plant Hatch S. B. Tipps, Manager of Nuclear Safety and Compliance State of Georgia bec: L. P. Crocker, NRR K. E Brockman, RII NRC Resident Inspector Locument Control Desk i
l RII:DRSS                                 RII:DRSS       RII:DRP 1
l RII:DRSS RII:DRSS RII:DRP E'.6 Y l',0.]f'n
E'.6 Y                                   l',0.]f'n       ()fff ETesta                                   WRankin       AHerdt 8//0/89                                 8//8/89       8/td/89 m--__------                   - - - - - - - - - - - -}}
()fff 1
ETesta WRankin AHerdt 8//0/89 8//8/89 8/td/89 m--__------
- - - - - - - - - - - -}}

Latest revision as of 00:08, 2 December 2024

Advises That Apr 1989 Rev 9 to Emergency Plan Meets Planning Stds of 10CFR50.47(b) & Requirements of 10CFR50,App E
ML20246C972
Person / Time
Site: Hatch  
Issue date: 08/16/1989
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
References
NUDOCS 8908250201
Download: ML20246C972 (2)


Text

=nn, 3

'& w g.

j&

^

ggg161989

)

f, 1

y -- :

l

(

y (Georgia Power company-5 ATTN:',Mr. W.lG. Hairston, III-

-Senior Vice President'-

Nuclear Operations S

LP. O.-Box'1295 l

-Birmingham, AL ~35201

\\

-Gentlemen:

- c

SUBJECT:

PLANT HATCH EMERGENCY PLAN REVIEW, DOCKET NOS. 50-321 AND 50-366 We. have completed our. review of Revision 9' to the Plant 1Hatth Emergency Plan, dated April 1989.

Our review indicated inat the changes appear to meet the l

' planning standards of' 10 CFR 50.47(b) and the requirements of-Appendix E to 10 CFR 50.

Piease be. reminded that '10 CFR 50.54(q) requires that proposed changes.which decrease. the effectiveness. of - your Emergoney Plan - shall ' not-be implemented.

. without application to and approval by the Commission. - However, changes may b'e

-made without Commission approval if wch changes do not decrease the

. effectiveness of the Plan, and the Plan, as changed, continues to meet the standards of 10~ CFR 50.47(b): and the requirements of Appendix E to 10 CFR 50.

.If:a change is made without approval, you.should furnish copies in acccrdance-with 10 CFR 50.54(q).

Also,.any changes to the Emergency' Plan Implementing Procedures should be made in accorconce with the requirements to 10 CFR 50, Appendix E, Section V.

Should you have any questions regarding this letter, please contact Mr. William H, Rankin of our staff,at (404) 331-5618.

-Sincerely, origined Sigrcd by w.Rando fcc Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards L

cc:

(See page 2) e 8908250201 8908.16 PDR ADOCK 05000321 F

PDC I \\

MW w-__ - ___

1

-Georgia Power Company 2

1 l

cc:

R. P. Mcdonald, Executive Vice President, Nuclear Operations J. T. Beckham,.Vice President Plant Hatch i

H. C. Nix, General Manager l

Plant Hatch

0. M. Fraser, Site Quality Assurance Manager J. Heidt, Manager, Nuclear Engineering and Licensing Plant Hatch S. B. Tipps, Manager of Nuclear Safety and Compliance State of Georgia bec: L. P. Crocker, NRR K. E Brockman, RII NRC Resident Inspector Locument Control Desk i

l RII:DRSS RII:DRSS RII:DRP E'.6 Y l',0.]f'n

()fff 1

ETesta WRankin AHerdt 8//0/89 8//8/89 8/td/89 m--__------

- - - - - - - - - - - -